AwardTape · Defense awards · Defense Systems and Solutions
Defense Systems and Solutions: $1.6B in DoD and DHS awards
Defense Systems and Solutions holds 293 DoD and DHS prime awards with $1.6B obligated Oct 3, 2023 to Jun 4, 2026. Largest category: Rotary wing aircraft at $1.3B; largest buyer: Department of the Army at $1.6B.
| Obligated FY2024+ | $1.6B |
|---|---|
| Awards | 293 |
| FY2024 | $546.5M |
| FY2025 | $673.1M |
| FY2026 to date | $341.1M |
| Lifetime obligated on these awards | $3.0B |
| First and latest action | Oct 3, 2023 · Jun 4, 2026 |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W58RGZ20F0463 delivery order | $0 | H-60 aircraft led anti-collision lights (lacl) | Army | Rotary wing aircraft | Oct 17, 2024 DoD 90d |
| W58RGZ20F0516 delivery order | $0 | Required to provide aviation ground support equipment (agse) in support of foreign military sales cases: saudi arabian national guard (cases si-b-wxy, si-b-wyb, si-b-wxp), saudi arabia sr-b-zad, turkey tk-b-vcq, greece gr-b-xop, and latvia ... | Army | Rotary wing aircraft | Jun 27, 2024 DoD 90d |
| W58RGZ21F0180 delivery order | $0 | Provide operations, training, maintenance and logistics support for the ground based sense and avoid (gbsaa) systems at select ARMY and air force air national guard (af ang) sites. | Army | Rotary wing aircraft | Dec 28, 2023 DoD 90d |
| W58RGZ21F0285 delivery order | $0 | Order w58rgz-21-f-0285 under contract w58rgz-18-d-0001 (rba 22596) for the purchase of 17 erca increment 2 support assemblies. | Army | Rotary wing aircraft | Jan 30, 2024 DoD 90d |
| W58RGZ21F0305 delivery order | $0 | Requirement to provide fully qualified production advanced multi-function display (amfd) units | Army | Rotary wing aircraft | Dec 26, 2023 DoD 90d |
| W58RGZ21F0336 delivery order | $0 | Foreign military sales (fms) new order w58rgz-21-f-0336 under contract w58rgz-18-d-0001 (rba 22625). | Army | Rotary wing aircraft | Dec 20, 2023 DoD 90d |
| W58RGZ21F0378 delivery order | $0 | This effort is in support of the t901 engine testing capability requirement for feds | Army | Rotary wing aircraft | Sep 29, 2025 DoD 90d |
| W58RGZ21F0384 delivery order | $0 | Extended range cannon artillery pointing and control system. | Army | Rotary wing aircraft | Mar 21, 2024 DoD 90d |
| W58RGZ21F0439 delivery order | $0 | V-22 advance multi-function display (amfd) fielding package 2 15 june 2021 rev - | Army | Rotary wing aircraft | Feb 20, 2024 DoD 90d |
| W58RGZ22F0180 delivery order | $0 | Provide two each hh-60l modification kits iaw drawing package 1063667, installation of kits on one hh-60l aircraft. option to evaluate uh-60a aircraft to address component obsolescence and maintenance issues. another option to procure ... | Army | Aircraft and engine maintenance | Mar 19, 2026 DoD 90d |
| W58RGZ22F0198 delivery order | $0 | Apache common missile warning system (cmws) parts 4. | Army | Rotary wing aircraft | Aug 22, 2024 DoD 90d |
| W58RGZ22F0284 delivery order | $0 | Patriot advanced capability (pac-3) missile segment enhancement (mse) | Army | Airframe structural components | Mar 27, 2025 DoD 90d |
| W58RGZ22F0287 delivery order | $0 | Flexible engine diagnostic system (feds) alaska air national guard. | Army | Aircraft and engine maintenance | Jul 30, 2024 DoD 90d |
| W58RGZ22F0363 delivery order | $0 | Advanced multi-purpose vehicle support. | Army | Vehicle maintenance | Nov 16, 2023 DoD 90d |
| W58RGZ22F0391 delivery order | $0 | Effort required to provide aviation ground support equipment (agse) in support of foreign military sales (fms) cases: albania (al-b-ubr), indonesia (id-b-ual), kingdom of morocco (mo-b-utn), kingdom of saudi arabia (sr-b-zan), and greece ... | Army | Rotary wing aircraft | Apr 27, 2026 DoD 90d |
| W58RGZ22F0425 delivery order | $0 | Mobile device design (mdd) development and production support. | Army | Defense systems R&D | Nov 18, 2025 DoD 90d |
| W58RGZ23F0109 delivery order | $0 | Ballistic panel system for CH-47 aircraft. | Army | Aircraft and engine maintenance | Nov 17, 2025 DoD 90d |
| W58RGZ23F0113 delivery order | $0 | Ch-47f composite repair tech manual | Army | Rotary wing aircraft | Jun 24, 2025 DoD 90d |
| W58RGZ23F0227 delivery order | $0 | H-60m ethernet switching hub (esh) | Army | Rotary wing aircraft | Apr 29, 2025 DoD 90d |
| W58RGZ23F0279 delivery order | $0 | Effort required to provide tech supply package (tsp) support to uh-60a/l/m foreign military sales (fms) customers | Army | Rotary wing aircraft | May 14, 2026 DoD 90d |
| W58RGZ23F0472 delivery order | $0 | H-60 engine inlet repair | Army | Rotary wing aircraft | May 12, 2026 DoD 90d |
| W911KF23F0018 delivery order | $0 | Dsp-120 locomotive pilot | Army | Engineering and technical services | Apr 4, 2024 DoD 90d |
| W58RGZ20F0558 delivery order | -$0 | Mi-17 secure communications harris radio installation | Army | Rotary wing aircraft | Sep 30, 2025 DoD 90d |
| W58RGZ22F0218 delivery order | -$966 | Fy22 h-60m initial fielding package | Army | Rotary wing aircraft | Aug 27, 2024 DoD 90d |
| W58RGZ20F0113 delivery order | -$1.2K | Department of state cabin hand holds | Army | Rotary wing aircraft | May 28, 2026 DoD 90d |
| W58RGZ19F0545 delivery order | -$1.3K | The prototype integration facility (pif) has a requirement to accomplish the nonrecurring engineering warfare center (nuwc). option 1 defines the testing requirements for the bourdon tube pressure switches. | Army | Combat ships and landing vessels | Feb 5, 2025 DoD 90d |
| W58RGZ23F0433 delivery order | -$1.7K | Air force software loader. | Army | Rotary wing aircraft | Mar 27, 2025 DoD 90d |
| W58RGZ23F0111 delivery order | -$1.7K | This statement of work (sow) defines the effort required to provide, kit, and ship the h-60m kits to support the fy23 initial fielding efforts. included are the associated program management and logistics support planning requirements. | Army | Rotary wing aircraft | Mar 3, 2025 DoD 90d |
| W58RGZ20F0276 delivery order | -$1.8K | The NAVY is developing a prototype hammerhead launch system for underwater naval mines and has asked the pif to provide prototype components | Army | Rotary wing aircraft | Apr 16, 2025 DoD 90d |
| W58RGZ20F0468 delivery order | -$2.7K | This statement of work (sow) defines the effort required to support the thaad project office (tpo) in the manufacturing of the thaad assured position, navigation, and timing (pnt). | Army | Rotary wing aircraft | Apr 9, 2026 DoD 90d |
| W58RGZ19F0276 delivery order | -$3.3K | This statement of work (sow) identifies requirements to be accomplished by the contractor in support of the prototype integration facility (pif) palletized field artillery launcher (pfal) development. | Army | Rotary wing aircraft | Dec 23, 2024 DoD 90d |
| W58RGZ19F0494 delivery order | -$3.5K | This statement of work defines the effort required to provide onsite training to the armys uc35 maintainers for components installed into the uc35 aircraft | Army | Rotary wing aircraft | Dec 2, 2024 DoD 90d |
| W58RGZ19F0488 delivery order | -$3.9K | Provide technical&engineering spt of 3 lower tier project ofc patriot launcher stations and 1 virtual launcher station; provide technical support for the launcher station test set ethernet interface;&support mods&test to patriot fielding ... | Army | Rotary wing aircraft | Apr 29, 2026 DoD 90d |
| W911KF23F0019 delivery order | -$5.0K | Various support services - 4th option year - overflow emergency support for abrasive cleaning to support production operations. | Army | Engineering and technical services | Apr 11, 2024 DoD 90d |
| W58RGZ23F0130 delivery order | -$6.4K | Uh-72a arc-231 component repair | Army | Rotary wing aircraft | Aug 8, 2024 DoD 90d |
| W58RGZ20F0104 delivery order | -$7.2K | The purpose of this statement of work (sow) is to define the effort required to provide three (3) each hh-60l modification kits iaw drawing package | Army | Rotary wing aircraft | Nov 6, 2024 DoD 90d |
| W58RGZ23F0112 delivery order | -$8.4K | H-1 lighting kits and spares | Army | Aircraft and engine maintenance | Mar 30, 2026 DoD 90d |
| W58RGZ19F0491 delivery order | -$9.7K | This sow defines the effort required to provide mission equipment support to the uh-60l and uh-60m united states customs and border protection (CBP) aircraft. the sow defines the effort required to procure, fabricate, kit, and rework ... | Army | Rotary wing aircraft | May 14, 2026 DoD 90d |
| W58RGZ20F0497 delivery order | -$13K | The military sealift command container (msc-c) is a 20 foot iso container used for charging lithium ion batteries on military sealift containers. | Army | Rotary wing aircraft | May 5, 2025 DoD 90d |
| W58RGZ20F0349 delivery order | -$13K | Army palletized field artillery launcher (pfal) support | Army | Rotary wing aircraft | Dec 18, 2024 DoD 90d |
| W58RGZ20F0270 delivery order | -$14K | Provide an evaluation of tss and its ancillary equipment with respect to obsolescence, repair requirements, and supportability, as well as to repair a subset of the evaluated components using residual(gfm) inventories and return them to ... | Army | Rotary wing aircraft | Apr 16, 2025 DoD 90d |
| W58RGZ19F0674 delivery order | -$17K | Support of the littoral combat ship program execute office pms 505 and the mission package support facility in deployment of high quality hardware on time and on budget, allowing integration of this hardware into a joint operational ... | Army | Rotary wing aircraft | Mar 21, 2024 DoD 90d |
| W58RGZ19F0500 delivery order | -$21K | Build&integrate autonomous underwater vehicle system components for the next generation mark 18 family remus 600 auv. | Army | Combat ships and landing vessels | Aug 29, 2024 DoD 90d |
| W58RGZ22F0296 delivery order | -$21K | High mobility artillery rocket system (himars) joint battle command-platform (jbc-p) and clevis bolt | Army | Rotary wing aircraft | Mar 11, 2025 DoD 90d |
| W58RGZ19F0280 delivery order | -$24K | This statement of work (sow) defines the effort required for the development, fabrication, integration, test and qualification of tactical and ground support systems, subsystems and components for the lower tier project office (ltpo). the ... | Army | Rotary wing aircraft | Mar 11, 2025 DoD 90d |
| W58RGZ19F0691 delivery order | -$27K | Naval undersea welfare center cable sets. | Army | Aircraft and engine maintenance | Apr 28, 2025 DoD 90d |
| W58RGZ19F0632 delivery order | -$38K | The purpose of this statement of work (sow) is to delineate in general terms, the overall requirements of the h-60v medevac design and integration, including the integration of a nose mounted forward looking infrared (flir | Army | Combat ships and landing vessels | Mar 8, 2024 DoD 90d |
| W58RGZ20F0500 delivery order | -$40K | H-60v aircraft multi-platform anti-jam global positioning system (gps) navigation antenna (magna) modification work order (mwo) | Army | Rotary wing aircraft | Feb 28, 2024 DoD 90d |
| W58RGZ19F0659 delivery order | -$47K | In 2007, the naval air systems command (navair) partnered with the amrdec prototype integration facility (pif) to build a limited quantity of topographic support set (tss) systems for their special forces. | Army | Quality control, testing and inspection | Apr 16, 2025 DoD 90d |
| W58RGZ23F0172 delivery order | -$54K | H-60m de-ICE control interactor unit (dicu) upgrade | Army | Rotary wing aircraft | Aug 20, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 12, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial