AwardTape · Defense awards · Defense Systems and Solutions
Defense Systems and Solutions: $1.6B in DoD and DHS awards
Defense Systems and Solutions holds 293 DoD and DHS prime awards with $1.6B obligated Oct 3, 2023 to Jun 4, 2026. Largest category: Rotary wing aircraft at $1.3B; largest buyer: Department of the Army at $1.6B.
| Obligated FY2024+ | $1.6B |
|---|---|
| Awards | 293 |
| FY2024 | $546.5M |
| FY2025 | $673.1M |
| FY2026 to date | $341.1M |
| Lifetime obligated on these awards | $3.0B |
| First and latest action | Oct 3, 2023 · Jun 4, 2026 |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W58RGZ20F0508 delivery order | -$67K | New order under contract w58rgz-18-d-0001, patriot organic launcher electronic support | Army | Rotary wing aircraft | May 16, 2024 DoD 90d |
| W58RGZ19F0293 delivery order | -$70K | The contractor shall provide engineering and logistical support to cover all initial h-60m aircraft deliveries and unit realignments. | Army | Combat ships and landing vessels | Mar 19, 2024 DoD 90d |
| W58RGZ19F0171 delivery order | -$78K | This statement of work (sow) details the contractor logistics support (cls) tasks necessary for operational field support and other sustainment support activities for the aaq-24 large aircraft infrared countermeasures (laircm) system with ... | Army | Rotary wing aircraft | Mar 10, 2026 DoD 90d |
| W58RGZ20F0105 delivery order | -$80K | The purpose of this statement of work (sow) is to define the effort required to integrate the aft ballast kit service bulletin (sb) on (59) luh-72 aircraft. | Army | Rotary wing aircraft | Mar 7, 2024 DoD 90d |
| W58RGZ21F0294 delivery order | -$81K | C-130 improved modular airborne fire fighting system (imaffs) phase iii | Army | Rotary wing aircraft | Nov 9, 2023 DoD 90d |
| W58RGZ20F0327 delivery order | -$82K | It provides the naval undersea warfare center (nuwc) with a 2-7-9 bay prototype structurally integrated enclosure (sie) for pms397 managed weapons platforms. | Army | Rotary wing aircraft | Apr 28, 2025 DoD 90d |
| W58RGZ20F0257 delivery order | -$87K | Sow defines the effort required to support naval air systems command v-22 (jpo) by conducting the receipt, acceptance inspection, preservation, upkeep and technical evaluation for the configuration upgrade of one (1) mv-22b osprey buno ... | Army | Rotary wing aircraft | Aug 5, 2025 DoD 90d |
| W58RGZ19F0184 delivery order | -$92K | The contractor shall provide management, engineering, technical, and all necessary support to conduct the site survey and site specific eip for the ground-based sense and avoid lightweight surveillance target acquisition radar system. | Army | Rotary wing aircraft | Aug 26, 2024 DoD 90d |
| W58RGZ20F0496 delivery order | -$94K | This statement of work (sow) outlines and defines the effort to integrate a portable hand held radio. | Army | Rotary wing aircraft | Dec 3, 2024 DoD 90d |
| W58RGZ20F0215 delivery order | -$97K | Effort required for the repair of AH-64 apache tail rotor blades (trb) for the united kingdom (uk). | Army | Rotary wing aircraft | Jan 30, 2025 DoD 90d |
| W58RGZ20F0493 delivery order | -$106K | (sow) identifies requirements to be accomplished by the contractor in support of the prototype integration facility (pif) extended range cannon artillery (erca) program. | Army | Rotary wing aircraft | Apr 28, 2025 DoD 90d |
| W58RGZ21F0152 delivery order | -$106K | H-60 blackhawk aircraft common infrared countermeasure (circm)/federated advanced navigational system (fans) deconflict validation and verification | Army | Rotary wing aircraft | Nov 8, 2023 DoD 90d |
| W58RGZ20F0098 delivery order | -$111K | Aviation systems precision approach radar (par) 2020 system integration | Army | Rotary wing aircraft | Nov 5, 2024 DoD 90d |
| W58RGZ20F0488 delivery order | -$123K | Provide uh-60m internal auxiliary fuel tank (iafts) kits, maven heater relocation kits, enhanced ballistic protection system (ebps) retrofit kits, multi-function operator seat modification kits and perform installation for sweden, fms case ... | Army | Rotary wing aircraft | Jun 4, 2026 DoD 90d |
| W58RGZ23F0233 delivery order | -$143K | All provisioning, and all logistical requirements for sustainment of the engine inlet barrier filter (eibf) system a-kit in the ARMY supply system utilizing government furnished technical data for both h-60a/l and hh/uh60m. | Army | Rotary wing aircraft | Feb 12, 2025 DoD 90d |
| W58RGZ21F0232 delivery order | -$158K | Aviation systems instrument landing system (ils) integration, | Army | Rotary wing aircraft | Mar 30, 2026 DoD 90d |
| W58RGZ19F0415 delivery order | -$170K | Required to provide aviation ground support equipment (agse) in support of foreign military sales (fms) cases 7l-b-ugk and ae-b-zab. | Army | Rotary wing aircraft | May 20, 2024 DoD 90d |
| W58RGZ20F0617 delivery order | -$176K | Integration of apache ah-64d modernized target acquisition designation assembly (mtads) and integration training of egyptian air force (eaf) aircraft maintainers in support of fms case eb-vbt-168. | Army | Rotary wing aircraft | May 6, 2024 DoD 90d |
| W58RGZ22F0487 delivery order | -$197K | Provide aviation ground support equipment (agse) in support of foreign military sales (fms) cases: latvia (dv-b-veb), lithuania (lh-b-udt) and philippines (pi-b-vcm). | Army | Rotary wing aircraft | Mar 3, 2026 DoD 90d |
| W58RGZ19F0247 delivery order | -$207K | Comnavairsyscom program manager air (pma) -275 has a requirement for the prototype integration facility (pif) to develop a v-22 commercial maintenance capability to help solve the under requirement needs for the v-22 fleet readiness. under ... | Army | Aircraft and engine maintenance | Apr 3, 2025 DoD 90d |
| W58RGZ20F0096 delivery order | -$208K | Provide ch-47f model special tools&test equipment (stte) to support the performance and maintenance of this aircraft for netherlands ARMY field operations. | Army | Rotary wing aircraft | Apr 16, 2025 DoD 90d |
| W58RGZ22F0299 delivery order | -$236K | This statement of work (sow) defines the personnel, materials, facilities, and services required to support and maintain two (2) uh-60m aircraft in a flyable status for 18 months for the slovak republic (svk). | Army | Rotary wing aircraft | Jul 29, 2024 DoD 90d |
| W58RGZ19F0212 delivery order | -$256K | This sow defines the effort required to establish a preventive maintenance schedule for on-site manufacturing equipment specified by the government furnished equipment (gfe) list along with purchasing, maintaining spare parts and fluids ... | Army | Rotary wing aircraft | Jan 13, 2025 DoD 90d |
| W58RGZ20F0220 delivery order | -$267K | In 2007, the naval air systems command (navair) partnered with the amrdec prototype integration facility (pif) to build a limited quantity of topographic support set (tss) systems for their special forces. | Army | Rotary wing aircraft | May 21, 2024 DoD 90d |
| W58RGZ22F0360 delivery order | -$272K | Mda mobile launcher. | Army | Rotary wing aircraft | Oct 7, 2024 DoD 90d |
| W58RGZ20F0562 delivery order | -$275K | This statement of work (sow) defines the effort required for travel, repair, fabrication, and procurement of spare parts and equipment, part and aircraft maintenance support, fielded systems support, | Army | Rotary wing aircraft | Mar 19, 2024 DoD 90d |
| W58RGZ23F0333 delivery order | -$281K | The purpose of this statement of work (sow) is to define the tasks necessary to qualify the new troop seat support assembly bars (steel vs aluminum rivets) for the upgraded troop seat. | Army | Rotary wing aircraft | Apr 15, 2025 DoD 90d |
| W58RGZ20F0565 delivery order | -$298K | To procure, manufacture, integrate, kit, deliver and install multiple apache mission essential packages (meps), modification kits, and apache parts. | Army | Rotary wing aircraft | Jan 29, 2025 DoD 90d |
| W58RGZ20F0271 delivery order | -$414K | The purpose of this statement of work (sow) is to define the effort required to integrate the tac-v on (106) uh-72a aircraft. | Army | Rotary wing aircraft | Mar 7, 2024 DoD 90d |
| W58RGZ19F0663 delivery order | -$426K | The(arb) adds an armament repair capability to the avionics and electrical repair section. this(sow) defines the arb support required for the inspection, procurement, manufacturing, integration, kitting, and delivery of multiple ... | Army | Rotary wing aircraft | Aug 21, 2025 DoD 90d |
| W58RGZ20F0330 delivery order | -$518K | Install three (3) each hh-60l modification kits iaw drawing package 1063667 | Army | Rotary wing aircraft | Feb 29, 2024 DoD 90d |
| W58RGZ21F0367 delivery order | -$614K | The purpose of this statement of work (sow) is to define the tasks necessary to integrate the short-wave infrared (swir) camera system onto two (2) uh-60m aircraft. | Army | Rotary wing aircraft | Mar 19, 2024 DoD 90d |
| W58RGZ19F0484 delivery order | -$754K | This statement of work (sow) defines the effort required for the integration of version iv ah-64e (improved) modification kits, aircraft components/hardware, and inspection/repair of aircraft parts. | Army | Rotary wing aircraft | May 27, 2026 DoD 90d |
| W58RGZ22F0249 delivery order | -$850K | Procurement, kitting, shipment, modifications, and integration of UH-60 improved durability gearboxes (idgb) kits, improved flight controls (ifc) / improved rotor control system (ircs) kits and induction of aircraft in country at amman, ... | Army | Rotary wing aircraft | Dec 2, 2024 DoD 90d |
| W58RGZ21F0443 delivery order | -$1.2M | Apache large aircraft infrared countermeasure (laircm) de-mod. | Army | Rotary wing aircraft | May 12, 2025 DoD 90d |
| W58RGZ21F0206 delivery order | -$1.4M | Effort required for the afghanistan modifications on uh-60a helicopters. | Army | Rotary wing aircraft | Nov 15, 2023 DoD 90d |
| W58RGZ20F0444 delivery order | -$1.5M | This statement of work (sow) defines the effort required to provide 40 manned un-manned teaming (mumt) apache configuration maintenance equipment (acme) kits. included are the associated program management and logistics support planning ... | Army | Rotary wing aircraft | Jun 3, 2026 DoD 90d |
| W58RGZ19F0550 delivery order | -$1.5M | Personnel, materials, and services required to modify, verify, document, and deliver uh-60m aircraft in the unique croatia configuration. | Army | Rotary wing aircraft | May 6, 2024 DoD 90d |
| W58RGZ22F0110 delivery order | -$2.9M | This statement of work (sow) defines the effort required to provide kits and corresponding production support for the uh-60v medevac program. the effort includes a base effort and one (1) option. | Army | Aircraft and engine maintenance | May 12, 2025 DoD 90d |
| W58RGZ23F0222 delivery order | -$3.3M | Aaq-24 large aircraft infrared countermeasures (laircm) with advanced threat warning (atw) sensors (aaq-24 atw laircm) aircraft de-modification (de-mod) maintenance work order (mwo) development support and implementation | Army | Aircraft and engine maintenance | Jan 27, 2026 DoD 90d |
| W58RGZ20F0212 delivery order | -$3.5M | Saudi arabia ministry of national guard facility integration phase 2 | Army | Rotary wing aircraft | May 6, 2024 DoD 90d |
| W58RGZ20F0495 delivery order | -$5.3M | Mast mounted assembly containers for long term storage and damage free shipping of the apache fire control radar. technical data package and specific logistics documentation. option for additional mma containers for usg. | Army | Rotary wing aircraft | May 31, 2024 DoD 90d |
| W58RGZ20F0536 delivery order | -$19.1M | Shall design a new avionics suite capable of isr operations with the recording and downlink capability on line of sight (los) (vhf) radio) and (blos) (satcom) equipment (iaw) the pc-12 modernization systems requirements document (srd). | Army | Rotary wing aircraft | Apr 17, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 12, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial