| W58RGZ21F0253 | $685K | delivery order | Department of the Army | Rotary wing aircraft | This statement of work (sow) defines the effort required to provide production-representative hardware kits and corresponding production support for the uh-60v program. the effort includes a base effort and four (4) options. | Mar 25, 2026 |
| W58RGZ20F0430 | $654K | delivery order | Department of the Army | Rotary wing aircraft | Provide two (2) each hh-60l modification kits iaw drawing package 1063667, and provide installation of provided kits on hh-60l aircraft. | Oct 15, 2024 |
| W58RGZ25F0189 | $638K | delivery order | Department of the Army | Aircraft and engine maintenance | Technical and engineering support of two lower tier project office patriot launcher stations, one 30kw advanced medium mobile power source (ammps) generator, one 30kw 400 hertz generator and one (1) virtual launcher station. | Mar 12, 2026 |
| W58RGZ25F0366 | $585K | delivery order | Department of the Army | Rotary wing aircraft | Ah-1z and uh-1y aircraft flight control computer (fcc) extension cable set | Sep 22, 2025 |
| W911KF22F0040 | $513K | delivery order | Department of the Army | Engineering and technical services | Various support services for ampv warehouse bldg 38 | Dec 20, 2023 |
| W58RGZ24F0213 | $479K | delivery order | Department of the Army | Rotary wing aircraft | Universal software loader verifier (uslv) repair. | May 15, 2025 |
| W58RGZ26F0233 | $474K | delivery order | Department of the Army | Rotary wing aircraft | Stryker plv faad install. | Apr 24, 2026 |
| W58RGZ24F0264 | $461K | delivery order | Department of the Army | Rotary wing aircraft | Hammerhead ordnance alteration (ordalt) kits. | Apr 30, 2024 |
| W58RGZ26F0065 | $450K | delivery order | Department of the Army | Rotary wing aircraft | Common autonomous multi-domain launcher risk reduction | Mar 12, 2026 |
| W58RGZ24F0211 | $444K | delivery order | Department of the Army | Aircraft and engine maintenance | Future tactical uncrewed aircraft systems (ftuas) component evaluation | May 27, 2026 |
| W58RGZ26F0286 | $435K | delivery order | Department of the Army | Rotary wing aircraft | Nato support and procurement agency ukraine cables | May 20, 2026 |
| W58RGZ24F0019 | $433K | delivery order | Department of the Army | Aircraft and engine maintenance | Universal software loader verifier hard drive build support | Nov 24, 2025 |
| W58RGZ20F0619 | $432K | delivery order | Department of the Army | Rotary wing aircraft | Statement of work (sow) for application of apkws and anti-jamming gps capabilities on md530f helicopters rev 1 | Jan 30, 2026 |
| W58RGZ23F0335 | $369K | delivery order | Department of the Army | Rotary wing aircraft | To develop an engineering change proposal (ecp) to address obsolete and long-lead time components in the h-60m de-ICE control indicator unit (dciu) | May 30, 2026 |
| W58RGZ25F0211 | $362K | delivery order | Department of the Army | Aircraft components and accessories | H-60 hoist arms and fairings | Feb 17, 2026 |
| W58RGZ25F0071 | $350K | delivery order | Department of the Army | Rotary wing aircraft | Integrated battle command systems manufacturability assessment. | Jun 17, 2025 |
| W58RGZ23F0218 | $324K | delivery order | Department of the Army | Rotary wing aircraft | Install forward area air defense on the maxxpro mrap vehicles | May 12, 2026 |
| W58RGZ25F0162 | $324K | delivery order | Department of the Army | Rotary wing aircraft | Air missile defense planning and control system | Mar 11, 2025 |
| W58RGZ24F0230 | $316K | delivery order | Department of the Army | Rotary wing aircraft | Ah-64 fms egypt material consolidation point | Aug 26, 2024 |
| W58RGZ22F0373 | $309K | delivery order | Department of the Army | Aircraft and engine maintenance | Patriot support | Feb 24, 2025 |
| W58RGZ26F0038 | $301K | delivery order | Department of the Army | Rotary wing aircraft | Universal software loader verifier (uslv) hard drive build support. | Nov 25, 2025 |
| W58RGZ26F0182 | $297K | delivery order | Department of the Army | Rotary wing aircraft | Kc-130j mobile user objective system gen6 (muos) a-kit manufacture and install | Apr 16, 2026 |
| W58RGZ22F0367 | $286K | delivery order | Department of the Army | Rotary wing aircraft | V-22 osprey conversion area harness modification installation. | Apr 13, 2026 |
| W58RGZ22F0124 | $280K | delivery order | Department of the Army | Rotary wing aircraft | Provide a technical supply package (tsp) for foreign military sales (fms) case lh-b-udt. the effort includes procuring, storing, inventorying, cataloging, kitting, loading and shipping of tsp items for fielding operations. | May 7, 2026 |
| W58RGZ21F0332 | $270K | delivery order | Department of the Army | Rotary wing aircraft | Demonstration and test, updating the product drawings, re-design of and adding new drawings for the fin fitting assembly (ffa) to be provided by the air force and also updating the job guide. | Mar 31, 2026 |
| W58RGZ24F0208 | $249K | delivery order | Department of the Army | Rotary wing aircraft | Pfal technology demonstration support | Feb 23, 2024 |
| W58RGZ23F0452 | $238K | delivery order | Department of the Army | Rotary wing aircraft | Mhe hauler trailer. | Apr 13, 2026 |
| W58RGZ24F0365 | $207K | delivery order | Department of the Army | Aircraft components and accessories | Provide cable assemblies to support nspa patriot system management group. | Aug 1, 2024 |
| W58RGZ26F0137 | $200K | delivery order | Department of the Army | Rotary wing aircraft | Pif internal rapid manufacturing support. | Apr 30, 2026 |
| W58RGZ20F0154 | $194K | delivery order | Department of the Army | Rotary wing aircraft | The purpose of this project is to provide engineering and manufacturing of the wireless at-platform test set (wats) and associated test support end of line (eol) hardware in support of the test measurement diagnostic equipment (tmde) ... | Jun 4, 2026 |
| W58RGZ19F0671 | $193K | delivery order | Department of the Army | Combat ships and landing vessels | Task order for "razorback [lbs-auv(s)]maintenance and shipping van" | Feb 11, 2025 |
| W58RGZ23F0232 | $176K | delivery order | Department of the Army | Rotary wing aircraft | Rogue fires multiple launch rocket system family of munitions launch unit (mlu) support | Jan 30, 2024 |
| W58RGZ24F0330 | $158K | delivery order | Department of the Army | Rotary wing aircraft | United states air force (USAF) b-1b advanced radar/electronic warfare test stations | Mar 18, 2026 |
| W58RGZ24F0352 | $150K | delivery order | Department of the Army | Rotary wing aircraft | Support the CH-47 cargo project management offices modernization project initiatives. | Aug 25, 2025 |
| W58RGZ25F0130 | $141K | delivery order | Department of the Army | Rotary wing aircraft | V-22 fms japan wing support | Jul 14, 2025 |
| W58RGZ23F0422 | $129K | delivery order | Department of the Army | Rotary wing aircraft | Apache mumt-2 ur antenna assembly prototype, validation, and verification | Apr 2, 2026 |
| W58RGZ24F0335 | $129K | delivery order | Department of the Army | Rotary wing aircraft | Hunter ARMY airfield static display refurbishment. | Aug 2, 2024 |
| W58RGZ26F0020 | $112K | delivery order | Department of the Army | Rotary wing aircraft | The royal netherlands air force (rnlaf) has a requirement to stage improved troop seat (its) kits and to develop a trade study for the methodology and logistics of integrating its onto an aircraft | Mar 18, 2026 |
| W58RGZ20F0527 | $79K | delivery order | Department of the Army | Rotary wing aircraft | Procurement and maintenance (i.e., phase maintenance program (pmp)) of 2 uh-60a helicopters | Jul 29, 2024 |
| W58RGZ24F0320 | $70K | delivery order | Department of the Army | Rotary wing aircraft | Container set and test | Jun 13, 2024 |
| W58RGZ19F0483 | $43K | delivery order | Department of the Army | Rotary wing aircraft | The statement of work (sow) defines the effort required for the modernization and fielding of the pitot static test system (psts). | Mar 25, 2024 |
| W58RGZ21F0189 | $25K | delivery order | Department of the Army | Rotary wing aircraft | Provide technical supply package (tsp) support to uh-60m foreign military sales (fms) customers | Feb 9, 2024 |
| W58RGZ22F0257 | $17K | delivery order | Department of the Army | Aircraft components and accessories | Statement of work (sow) for the u.s. marine corps wireless at-platform test set (wats) program including u.s. marine corps automatic test equipment (ate) for wats calibration and maintenance. | May 23, 2026 |
| W58RGZ18D0001 | $0 | IDIQ contract | Department of the Army | Rotary wing aircraft | Pif-3 base idiq for technical support for prototype integration facility (pif) | Apr 24, 2026 |
| W58RGZ19F0489 | $0 | delivery order | Department of the Army | Rotary wing aircraft | Navairsyscom pma-275 for the procurement, manufacturing, integration, kitting, delivery, and installation of mission computer obsolescence initiative (mcoi) retrofit kits and common aircraft portable reprogramming equipment (capre) gbe ... | Feb 24, 2026 |
| W58RGZ19F0499 | $0 | delivery order | Department of the Army | Rotary wing aircraft | This sow defines the effort required to provide twenty (20) all up round ballasts, grade b (aurbb). | May 26, 2026 |
| W58RGZ19F0531 | $0 | delivery order | Department of the Army | Rotary wing aircraft | The contractor is required to provide center cell access port. | May 29, 2025 |
| W58RGZ19F0650 | $0 | delivery order | Department of the Army | Rotary wing aircraft | This statement of work defines the effort required to develop and deliver the technical data time compliance technical orders tctos engineering and provisioning relating to the ests and allow the upgrade of the ests to a31u182403 and ... | Dec 4, 2025 |
| W58RGZ19F0686 | $0 | delivery order | Department of the Army | Rotary wing aircraft | Support navairsyscom pma275 for the procurement, manufacturing, integration, kitting, delivery, and installation of mission computer obsolescence initiative retrofit kits under ecp-873 r4 for the u.s. marine corps variant of the mv-22. | Apr 30, 2025 |
| W58RGZ20F0261 | $0 | delivery order | Department of the Army | Rotary wing aircraft | The purpose of this effort is to provide engineering, design and manufacturing of the national guard vehicle diagnostic test set (vdts). | Apr 2, 2024 |