AwardTape · Categories · Construction · Architect-engineering services
Architect-engineering services: $11.8B in defense awards
$11.8B obligated across 19,761 DoD and DHS awards to 2,009 companies, Oct 1, 2023 to Oct 14, 2026, 8.0% of Construction. AECOM Technical Services, Inc leads with $627.5M; Department of the Army is the largest buyer at $5.9B.
| Obligated FY2024+ | $11.8B |
|---|---|
| Awards | 19,761 |
| Companies | 2,009 |
| FY2024 | $5.5B |
| FY2025 | $4.3B |
| FY2026 to date | $2.1B |
| Parent category | Construction |
| Award | Company | Obligated FY2024+ | What | Agency | Latest action |
|---|---|---|---|---|---|
| W912P824F0137 delivery order | Eustis Engineering, L.l.c | $315K | East atchafalaya basin levee | Army | Jun 5, 2025 DoD 90d |
| FA800325F0027 delivery order | National Institute of Building Sciences | $315K | This contract includes all work necessary to develop a work plan for creating one uk cost book database, based on bcis construction cost data, for mii software using pound sterling (gbp) currency and metric units of measure. | Air Force | Dec 19, 2025 DoD 90d |
| N6274221F0332 delivery order | Mndpi Pacific JV | $315K | Prepare a design-bid-build (dbb) construction package consisting of full plans, specifications, detailed cost estimate, and other services in support of fy23 mcon project p-324, 9th engineer support battalion hq, marine corps base camp ... | Navy | Sep 25, 2024 DoD 90d |
| N4425525F0286 delivery order | WSP USA Inc | $315K | Post construction award services (pcas) to follow-on expired task order n4425522f8009. | Navy | Sep 23, 2025 DoD 90d |
| W912GB24F0189 delivery order | Tetra Tech, Inc | $315K | Pcr shore power site k, turkey | Army | Sep 24, 2024 DoD 90d |
| N6247826F0117 delivery order | MK Engineers, LTD | $315K | Architect-engineer services for fy27 mcon project p-002u camp smith secure space, mcbh camp h.m. smith, hawaii | Navy | Jun 1, 2026 DoD 90d |
| 70B01C24C00000070 definitive contract | Tasi, LLC | $315K | Replace detention cabinets and countertops, tucson, az | U.S. Customs and Border Protection | Sep 30, 2026 |
| N6274226F0338 delivery order | Mdpac JV | $314K | Contract no. n62742-23-d-0001, task order no. n6274226f0338, fy27 mcon project p-428, airfield pavement upgrades, pacific missile range facility, kauai, hawaii, independent cost estimate and schedule, joint base pearl harbor-hickam | Navy | May 14, 2026 DoD 90d |
| W9128F21C0036 definitive contract | Exp Federal Inc | $314K | Ae design to replace springs and dampers at cmsfs, co. | Army | May 14, 2026 DoD 90d |
| FA301624F0484 delivery order | Premier Stanley JV LLC | $314K | This requirement is for a pcr for b44 on joint base san antonio, fsh, in accordance with the statement of work. IT is awarded as a task order on a multiple award indefinite-delivery, indefinite-quantity for architect engineer services for ... | Air Force | Feb 25, 2025 DoD 90d |
| W912QR22F0114 delivery order | Athena Engineering & Environmental, LLC | $314K | Johnson county phase 1 fweep | Army | Dec 4, 2025 DoD 90d |
| FA461024F0115 delivery order | Raymond Pond Full Service Solutions JV LLC | $314K | Xumu 24-3200 marshallia ranch area development plan in accordance with statement of work (sow) dated 01 march 2024. | Air Force | Jan 15, 2025 DoD 90d |
| W9127S25FA095 delivery order | Goldenwolf - Ewingcole a Joint Venture LLC | $314K | W41xde52605950 | Army | Sep 20, 2025 DoD 90d |
| W50S7E25FA003 delivery order | Burns & McDonnell Engineering Company, Inc | $313K | 133rd - ae - b640 arms room and building remodel - design for weapons storage vault and weapons maintenance area code compliant. replace hvac system with a dedicated system incorporated with existing system. upgrade interior finishes. | Army | May 5, 2026 DoD 90d |
| W912DR22F0314 delivery order | AECOM Technical Services, Inc | $313K | Child development center v (cdc v) | Army | Dec 19, 2025 DoD 90d |
| N6247823F4169 delivery order | MK Engineers, LTD | $313K | Architect engineer service for design-bid-build package include plans, specification, cost estimate for project rm 15-2763 replace primary circuits h-2 and i-4, joint base pearl harbor hickam | Navy | Jan 13, 2025 DoD 90d |
| W9123725FA051 delivery order | Stantec Consulting Services Inc | $313K | Bluestone borehole alignment quality assurance survey | Army | Apr 23, 2026 DoD 90d |
| FA449724C0022 definitive contract | Washington Office Interiors LLC | $313K | 35% design repair dorm 435 and demo one wing iaw statement of work 21 may 2024 | Air Force | Jan 16, 2025 DoD 90d |
| W9124P24F0681 delivery order | Cci Utility and Construction Services, LLC | $313K | Tracking no: p971 (2023256-5) 2 x chiller replacement, bldg 4500, redstone arsenal, al | Army | Sep 5, 2024 DoD 90d |
| W9123824F0069 delivery order | Burns & McDonnell Engineering Company, Inc | $313K | Project title and location: united states department of agriculture (usda) agricultural research services, research and development center, construction phase services, davis, ca. | Army | Jan 26, 2026 DoD 90d |
| N6274224F0175 delivery order | AECOM Technical Services, Inc | $313K | Clean vi, cto no. n6274221f0175-per- and polyfluoroalkyl substances remedial investigation addendum planning documents and additional rab for the former public works center industrial waste treatment plant and nearby areas, jbphh, oahu, hi | Navy | Sep 2, 2025 DoD 90d |
| W912EP20F0194 delivery order | CDM Federal Programs Corporation | $313K | West pinero cnt 5 bridge replacement | Army | Aug 8, 2025 DoD 90d |
| W912PF23F0041 delivery order | A.i.c.e Consulting - S.r.l | $312K | Ae drainage and sewer system longare at usag vicenza, italy | Army | Apr 16, 2026 DoD 90d |
| W911SA24F2025 delivery order | Short Elliott Hendrickson Inc | $312K | Design services | Army | Feb 19, 2026 DoD 90d |
| W912BU25F0017 delivery order | The Shearer Group, Inc | $312K | Barge vessels engineering services | Army | May 18, 2026 DoD 90d |
| W912DQ24F1000 delivery order | CDM Federal Programs Corporation | $312K | The u.s. ARMY corps of engineers (usace) has a need for architectural and engineering services for the southwest missouri area regional water supply project. | Army | Sep 26, 2024 DoD 90d |
| W9127825FA278 delivery order | HCS Group, P.c | $312K | Fy25 hap iss guatemala | Army | May 29, 2026 DoD 90d |
| FA302026F0048 delivery order | G.m Hill Engineering, Inc | $312K | Design the reconstruction of 9th ave to include demolition and installation of existing pavement, curb and gutter, stabilize subgrade, base course, and concrete pavement. replace curb inlets and reconfigure and replace storm drainage ... | Air Force | Feb 5, 2026 DoD 90d |
| W912BU24F0005 delivery order | Michael Baker International, Inc | $312K | Tyad bldg 2 bays 1-3 renovation | Army | Oct 21, 2025 DoD 90d |
| N4425524F4168 delivery order | Liberty JV | $312K | 24 bangor (27 200 204) 6th 5yr ph.6 | Navy | Jul 19, 2024 DoD 90d |
| N4008024F5040 delivery order | Raymond Pond Full Service Solutions JV LLC | $312K | Xo20 b2454e reconstruct twy e rwy 06 - twy delta rm18-1293. this | Navy | Jul 15, 2025 DoD 90d |
| W912PL24F0045 delivery order | Diaz Yourman-Geopentech-Kinnetic Laboratories Joint Venture | $312K | Newport bay harbor environmental/geotech | Army | Aug 28, 2025 DoD 90d |
| N4008521F5383 delivery order | Ch2m Hill, Inc | $312K | Hr, jeblc (fs), sites 02s 03s & 04s, investigation, clean | Navy | May 23, 2024 DoD 90d |
| N4019224F4161 delivery order | HDR Engineering, Inc | $312K | N62742-22-d-0005 - n4019224f4161,task order for won 1796443, p1157 guam high school temporary facilities qc plan, csra, geotechnical report, topographic & utilities survey, & sid, dodea, agana heights, naval base | Navy | Jul 24, 2024 DoD 90d |
| N4008024F4295 delivery order | Raymond Pond Full Service Solutions JV LLC | $312K | Wny-176 navsea renovate facility for secure center of excellence | Navy | Jan 29, 2025 DoD 90d |
| W9128F24F0225 delivery order | Enterprise Engineering, Inc | $312K | Clin 0001: fac 675, ae design serv -all | Army | Jun 1, 2026 DoD 90d |
| N4008523F5432 delivery order | Ch2m Hill, Inc | $311K | Hr, nsn, pfas remedial investigations (norm site 23), clean | Navy | May 15, 2025 DoD 90d |
| W912DS24F0100 delivery order | Colby Co LLC | $311K | Repair of building 110, phase 1 | Army | Sep 5, 2024 DoD 90d |
| W912HV26FA012 delivery order | Esc-Dpi JV | $311K | Preparation of criteria package (cp) for facilities improvement program (fip), mc2504 upgrade 66kv electric distribution lines iwakuni air base okinawa japan | Army | Feb 18, 2026 DoD 90d |
| W912DW24F2039 delivery order | David Evans and Associates, Inc | $311K | Survey for seattle harbor navigation improvement project | Army | Jun 21, 2024 DoD 90d |
| W912BV24F0039 delivery order | Jacobs Engineering Group Inc | $311K | Fy27 b-21 field training detachment facility at dyess air force base planning charrette report | Army | Oct 7, 2024 DoD 90d |
| W9123823F0025 delivery order | AECOM Technical Services, Inc | $311K | Project title and location: expand class yard 1, military ocean terminal concord (motco), concord, ca | Army | Dec 18, 2025 DoD 90d |
| W9127824F0050 delivery order | Grace Design Studios, LLC | $311K | Independent technical review for component remanufacturing facility, anniston ARMY depot, al | Army | Sep 6, 2025 DoD 90d |
| N6247326F0026 delivery order | Dav Energy Solutions, Inc | $310K | In accordance with the basic contract, n62473-24-d-5201. building commissioning ae services small business set-aside, and in support of this task order, the contractor is directed to perform the following tasks as indicated in the schedule ... | Navy | May 18, 2026 DoD 90d |
| N6133126F0052 delivery order | Stoa International/florida, Inc | $310K | Architect and engineering services for non-magnetic test area revitalization (nmta) | Navy | May 7, 2026 DoD 90d |
| N4008024F4494 delivery order | Multi-Mac Joint Venture | $310K | Nswc dahlgren division npdes permit support | Navy | Apr 1, 2026 DoD 90d |
| N4008524F6538 delivery order | Whitman Requardt & Associates LLP | $310K | Building 776 lab refurbishment design | Navy | Sep 28, 2024 DoD 90d |
| N6247324F5259 delivery order | Del Mar Environmental & Construction Services Inc | $310K | P386 geotech investigation | Navy | Jul 9, 2025 DoD 90d |
| W911KB25FA086 delivery order | Design Alaska, Inc | $310K | Wc1juw52592017 the scope of the subject project includes design of an addition split between northern and southern extension of the current thaw shed. | Army | Sep 22, 2025 DoD 90d |
| W912HV25F0003 delivery order | Fujii Architects, Inc | $310K | Preparation of basic criteria package (bcp) for alliance transformation and realignment (atara) project mc 4208-t dining facility camp foster, okinawa, japan | Army | Nov 13, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 16, 2026.
Sources
Award recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspending
Related
AECOM Technical Services, IncBurns & McDonnell Engineering Company, IncCci Utility and Construction Services, LLCWSM Pacific Siop, a Joint VentureJacobs Government Services CompanyGeneral Atomics Aeronautical Systems, IncCh2m Hill, IncResolution Consultants - an Aecom-Ensafe Joint VentureDepartment of the ArmyDepartment of the NavyDepartment of the Air ForceFederal Emergency Management AgencyU.S. Coast GuardU.S. Customs and Border ProtectionOffice of Procurement OperationsWashington Headquarters Services
Terminal: filters, alerts and CSV export for awards in this category.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial