| N4425523F4362 | $15.4M | delivery order | Department of the Navy | Architect-engineering services | Bpa preliminary design for fy 26 mcon project p-472 pier 2, nbk bangor, silverdale, wa | May 13, 2026 |
| N4425524F4143 | $13.9M | delivery order | Department of the Navy | Architect-engineering services | Dry dock 1 & 2 trf seismic studies psns | May 4, 2026 |
| N4425524F4289 | $10.6M | delivery order | Department of the Navy | Architect-engineering services | Fy27 rm23-1151 ae seismic repair dry dock 4, b704, puget sound na | Sep 24, 2025 |
| N4425524F4302 | $6.9M | delivery order | Department of the Navy | Architect-engineering services | Floating dry dock/ship-lift study_psns | Nov 14, 2024 |
| N4425525F0255 | $1.5M | delivery order | Department of the Navy | Architect-engineering services | Fy30, ae study, feasibility engineering study to validate locations for p947 and p932, nbk(bangor), wa | Oct 3, 2025 |
| N4425524F4237 | $1.4M | delivery order | Department of the Navy | Architect-engineering services | Fy24 ae design rm18-1806 (phase 4 of 9) repair railroad culverts | Sep 20, 2024 |
| N4425525F0196 | $1.3M | delivery order | Department of the Navy | Architect-engineering services | Conduct a study of the bangor-7420 delta drydock to investigate and determine corrective actions to the cause of sinkholes and undermining of fill material surrounding entire drydock | Feb 11, 2026 |
| N4425524F4375 | $868K | delivery order | Department of the Navy | Architect-engineering services | Ae design ammunition wharf structural repairs, phase 1-2 of 9 | Dec 20, 2024 |
| N4425524F4226 | $845K | delivery order | Department of the Navy | Architect-engineering services | Siop ae study aoa for rcd, sub and recycling, psns, bremerton, wa | Jun 7, 2024 |
| N4425525F0202 | $840K | delivery order | Department of the Navy | Architect-engineering services | Design and install closed loop chill water system for delta dry dock pumproom, building 7420, bangor | Aug 14, 2025 |
| N4425524F4055 | $824K | delivery order | Department of the Navy | Architect-engineering services | Redesign refuel facility nbk-bangor | Jun 10, 2025 |
| N4425525F0064 | $766K | delivery order | Department of the Navy | Architect-engineering services | Ae design replace critical structure piles b7501 | Jan 20, 2026 |
| N4425524F4274 | $626K | delivery order | Department of the Navy | Architect-engineering services | Msr #23207094_1787796 -- (23207821) repair crane track and tunnel arch support dry dock 1 psns | Mar 13, 2025 |
| N4425522F4091 | $613K | delivery order | Department of the Navy | Architect-engineering services | Ae design services, re-route tang road and repair waterfront, nbk-bangor wa | Oct 9, 2025 |
| N4425525F0239 | $612K | delivery order | Department of the Navy | Architect-engineering services | P826 - acoustic research detachment small craft berthing concept study | Dec 22, 2025 |
| N4425525F4037 | $543K | delivery order | Department of the Navy | Architect-engineering services | Ehw1 pcas | Feb 11, 2025 |
| N4425524F4110 | $530K | delivery order | Department of the Navy | Architect-engineering services | Msr #21618236_1738764 -- (ae-dbb_21618236) install perimeter secu | Feb 2, 2026 |
| N4425524F4376 | $509K | delivery order | Department of the Navy | Architect-engineering services | Ae design replace critical structure piles at ehw1, phase 7 of 9 | Sep 23, 2024 |
| N4425524F4243 | $364K | delivery order | Department of the Navy | Architect-engineering services | Msr #21878819_1742457 -- (21261608) replace timber piles and wate | Nov 25, 2024 |
| N4425524F4369 | $363K | delivery order | Department of the Navy | Architect-engineering services | Seawall repairs and env mitigation phase 1-4 nmii | Sep 16, 2024 |
| N4425524F4184 | $340K | delivery order | Department of the Navy | Architect-engineering services | X5930264 fy26 mcon p-197 ffg-62 ship pier utility upgrades, naval | May 15, 2024 |
| N4425525F0286 | $315K | delivery order | Department of the Navy | Architect-engineering services | Post construction award services (pcas) to follow-on expired task order n4425522f8009. | Sep 23, 2025 |
| N4425524F4373 | $302K | delivery order | Department of the Navy | Architect-engineering services | Ae design repair and increase capacity of sod system for olympic pier at b7042 and b7113, | Sep 5, 2024 |
| N4425524F4248 | $247K | delivery order | Department of the Navy | Architect-engineering services | 23386328_ae study) engineered study for relocation of operations to dry dock 1, 701 puget sound naval shipyard, washington | Jul 1, 2024 |
| N4425523F4424 | $237K | delivery order | Department of the Navy | Architect-engineering services | Rm20-0478 ae services rm20-0478 farragut tunnel, psns, nbk, breme | Sep 13, 2024 |
| N4425523F4296 | $226K | delivery order | Department of the Navy | Architect-engineering services | Dry dock 4 and dry dock 5 seismic vulnerability analysis | Jan 30, 2025 |
| N4425524F4235 | $185K | delivery order | Department of the Navy | Architect-engineering services | Ae: pcas replace headworks and lift station, b420, naswi | Jun 3, 2026 |
| N4425524F4085 | $155K | delivery order | Department of the Navy | Architect-engineering services | Psns dd1 cradle design review, psns, bremerton, wa | Feb 29, 2024 |
| N4425524F4160 | $149K | delivery order | Department of the Navy | Architect-engineering services | Pcas for construction of ows 1 and 6, naswi | Mar 19, 2025 |
| N4425522F4269 | $145K | delivery order | Department of the Navy | Architect-engineering services | Ae-dbb)(m2) repair railroad bridges rb 644 | Sep 22, 2025 |
| N4425524F4156 | $130K | delivery order | Department of the Navy | Architect-engineering services | Ae pcas b100 steam line and boiler multi | Mar 11, 2025 |
| N4425523F4376 | $71K | delivery order | Department of the Navy | Architect-engineering services | Ae design cht system at ediz hook | Jul 10, 2025 |
| N4425524F5007 | $52K | delivery order | Department of the Navy | Architect-engineering services | Msr #22808836_1792162 -- (ae-study_22808836) inspect and report c | Sep 11, 2024 |
| N4425525F0189 | $37K | delivery order | Department of the Navy | Architect-engineering services | This requirement is for post construction award services (pcas) for repair stormwater piping outfall 15 | Jul 31, 2025 |
| N4425519F4474 | $16K | delivery order | Department of the Navy | Architect-engineering services | Ae pcas services supporting p400 | Mar 27, 2026 |
| N4425523F4449 | $11K | delivery order | Department of the Navy | Architect-engineering services | Ae study demo and remove rolling dry-dock cover, bldg. 7420-s, nb | Dec 15, 2023 |
| N4425520D0001 | $0 | IDIQ contract | Department of the Navy | Architect-engineering services | Marine/waterfront a-e services | May 22, 2025 |
| N4425520F4312 | $0 | delivery order | Department of the Navy | Architect-engineering services | Repair railroad culverts (phase 2 of 9) mp31.55 design | Jul 24, 2025 |
| N4425520F4409 | $0 | delivery order | Department of the Navy | Architect-engineering services | Ae: design for construction of storm water filtration systems | Jan 22, 2024 |
| N4425521F4318 | $0 | delivery order | Department of the Navy | Architect-engineering services | Ae design to replace critical structure piles, ehw-1, b/7501, nbk-bangor wa | Feb 20, 2024 |
| N4425522F4240 | $0 | delivery order | Department of the Navy | Architect-engineering services | Beq commissioning, b/2701, naswi provide third-party commissioning and commissioning authority services. provide continuous support, oversight and interaction from design through construction completion and final acceptance by the ... | Mar 11, 2026 |
| N6247320F4796 | $0 | delivery order | Department of the Navy | Architect-engineering services | X060 [cimar] ae pcas idiq to p596 hangar 95 renovation&addit | Feb 28, 2024 |
| N6247321F4358 | $0 | delivery order | Department of the Navy | Architect-engineering services | Pcas mcon p612 vmx-1 hangar at mcas yuma, arizona | Jan 25, 2024 |
| N6247323F5064 | $0 | delivery order | Department of the Navy | Architect-engineering services | Ae services pcas for p586 | Oct 17, 2024 |
| W912DW21F2084 | -$2K | delivery order | Department of the Army | Architect-engineering services | Task order vaal ph3 commissioning | Jun 14, 2024 |
| N4425520F4252 | -$10K | delivery order | Department of the Navy | Architect-engineering services | Repair zelacthed point pier&float connections at nuwc zp bangor, washington | Dec 18, 2023 |
| N4425521F4347 | -$18K | delivery order | Department of the Navy | Architect-engineering services | Design/bid/build a/e design for foundation for drydock #2 defueling complex | May 5, 2025 |
| N4425523F4460 | -$76K | delivery order | Department of the Navy | Architect-engineering services | P932 a-e services, transit protection small craft berthing & fuel facilities, nbk bangor, silverdale, wa | May 23, 2024 |
| N4425523F4224 | -$90K | delivery order | Department of the Navy | Architect-engineering services | Ae-study inspect existing mooring camel system, marginal wharf | May 11, 2026 |
| W912DW22F2137 | -$2.5M | delivery order | Department of the Army | Architect-engineering services | Va al seismic nrm | Nov 28, 2023 |