AwardTape · Defense awards · Design Alaska, Inc
Design Alaska, Inc: $13.6M in DoD and DHS awards
Design Alaska, Inc holds 20 DoD and DHS prime awards with $13.6M obligated Jan 3, 2024 to Sep 11, 2026. Largest category: Architect-engineering services at $13.6M; largest buyer: Department of the Army at $7.5M.
| Obligated FY2024+ | $13.6M |
|---|---|
| Awards | 20 |
| FY2024 | $129K |
| FY2025 | $5.7M |
| FY2026 to date | $7.8M |
| Lifetime obligated on these awards | $14.4M |
| Parent company (as reported) | Design Alaska, Inc |
| First and latest action | Jan 3, 2024 · Sep 11, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Architect-engineering services | $13.6M | 20 awards | 100% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Army | $7.5M | 10 awards | 55% |
| 2 | Department of the Air Force | $6.1M | 8 awards | 45% |
| 3 | U.S. Coast Guard | $5.0K | 2 awards | 0.0% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W911KB26FA044 delivery order | $6.9M | Eie490 microreactor synchronization | Army | Architect-engineering services | Apr 29, 2026 DoD 90d |
| FA500425C0034 definitive contract | $4.2M | This project requires an a-e firm to develop the design of the full-length replacement of all utility systems within utilidor d and utilidor h. the a-e firms shall improve the utility infrastructure by replacing all of the utility systems. | Air Force | Architect-engineering services | Sep 15, 2025 DoD 90d |
| FA500425C0019 definitive contract | $554K | For the designs in buildings 1340 and 1362 is to replace the hangar doors located on eielson air force base (afb). building 1340 hanger door is currently inoperable. building 1362 was constructed in 2017 and does not have a hazmat survey. | Air Force | Architect-engineering services | Jan 22, 2026 DoD 90d |
| FA500426C0027 definitive contract | $481K | Eielson afb yukon club and base supply each have heating, ventilation, and air conditioning systems that must be fully connected to ddc systems. the work for this contract encompasses the design of new hvac ddc systems for the two ... | Air Force | Architect-engineering services | May 14, 2026 DoD 90d |
| FA500425C0023 definitive contract | $405K | This requirement is for a/e design services to repair building 6203 (chpp) roof at eielson afb. | Air Force | Architect-engineering services | May 21, 2026 DoD 90d |
| W911KB25FA086 delivery order | $310K | Wc1juw52592017 the scope of the subject project includes design of an addition split between northern and southern extension of the current thaw shed. | Army | Architect-engineering services | Sep 22, 2025 DoD 90d |
| FA500426C0017 definitive contract | $281K | Planning fy26 f18pa 374449 354 ces fm9 ftqw180503 install lightning protection systems ph b (multi) | Air Force | Architect-engineering services | Mar 23, 2026 DoD 90d |
| W911KB25F0008 delivery order | $129K | Ftw501 lcca | Army | Architect-engineering services | Nov 13, 2024 DoD 90d |
| W911KB24F0092 delivery order | $106K | Jbr032 akng readiness center, life cycle cost analysis (lcca) | Army | Architect-engineering services | Nov 26, 2024 DoD 90d |
| FA500426C0012 definitive contract | $77K | Replacement of a pole-mounted transformer for a pad-mounted transformer for easier maintenance and compliance with ufc 3-550-01. additionally, the building requires new interior and exterior lighting and new heated bollard outlet (hbo). | Air Force | Architect-engineering services | Apr 1, 2026 DoD 90d |
| FA500423C0019 definitive contract | $73K | Professional a-e services will provide comprehensive investigation for the lift station at building 2212. | Air Force | Architect-engineering services | May 20, 2025 DoD 90d |
| FA500023F0062 delivery order | $34K | Task order for architect-engineering (a-e) services. 100% design to repair aircraft maintenance facility, building 15432. | Air Force | Architect-engineering services | Jan 3, 2024 DoD 90d |
| 70Z08726FJUNE0003 delivery order | $5.0K | Minimum guarantee-arctic district a&e multiple award task order contract | U.S. Coast Guard | Architect-engineering services | Nov 19, 2025 |
| W911KB24F0138 delivery order | $3.5K | $3500.00 minimum guarantee | Army | Architect-engineering services | Sep 30, 2024 DoD 90d |
| W50S6K25FA005 delivery order | $2.5K | Architect-engineer services supporting alaska | Army | Architect-engineering services | Sep 26, 2025 DoD 90d |
| 70Z08726DJUNE0003 IDIQ contract | $0 | Professional architect & engineering services multiple award task order | U.S. Coast Guard | Architect-engineering services | Sep 11, 2026 |
| W50S6K25DA001 IDIQ contract | $0 | Architect-engineer services supporting alaska | Army | Architect-engineering services | Sep 25, 2025 DoD 90d |
| W911KB23D0010 IDIQ contract | $0 | Idc - mechanical/electrical a-e services | Army | Architect-engineering services | Apr 17, 2025 DoD 90d |
| W911KB24D0001 IDIQ contract | $0 | Multi-discipline ae idiq | Army | Architect-engineering services | Apr 18, 2025 DoD 90d |
| W911KB21F0021 delivery order | -$15K | Nes111-transformer and switch survey, fox alaska | Army | Architect-engineering services | Jan 10, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial