AwardTape / Contracts / W912P7-25-C-A018
W912P7-25-C-A018: $39.7M Department of the Army Award to Granite Construction
Project description: this project is for the reach 6 levee and floodwall construction along the corralitos creek, a tributary of the pajaro river levee system in the city of watsonville, county of santa cruz.. Contracting activity: W075 ENDIST SAN FRAN. Estimated completion: Sep 11, 2027.
$39.7M total obligated / $39.3M latest announced action / Competed / Sep 11, 2027 completion / W912P7 W075 ENDIST SAN FRAN
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912P7-25-C-A018 (unhyphenated: W912P725CA018) |
|---|---|
| Prime Contractor (Awardee) |
Granite Construction
(California)
FY2024-FY2026 Federal Defense Portfolio: $868.2M obligated across 22 contracts
|
| Total Obligated (all actions) | $39,678,093 ($39.7M) |
| Latest Announced Action (2025-09-05) | $39,300,000 |
| USAspending / FPDS Obligation History | Total obligated: $39,678,093 / Obligated FY2024 onward: $39,607,793 (signed 2025-09-05, latest FPDS action 2026-05-27) |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912P7: W075 ENDIST SAN FRAN |
| Competition & Contract Structure | Competed / Definitive Contract (definitive contract) / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC Y1PZ (Construction Of Other Non-Building Facilities) / NAICS 237990 (Other Heavy And Civil Engineering Construction) |
| Work Locations & Funding | Primary Place of Performance: California |
| Estimated Completion Date | Sep 11, 2027 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Granite Construction wins $39.3M contract for levee and floodwall construction. U.S. Army Corps of Engineers $39.3M obligated now work through Sep 11, 2027.
Project description: this project is for the reach 6 levee and floodwall construction along the corralitos creek, a tributary of the pajaro river levee system in the city of watsonville, county of santa cruz.
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Granite Construction
- Delivery Runway: Active through Sep 11, 2027
- Requirement Scope: Project description: this project is for the reach 6 levee and floodwall construction along the corralitos creek, a tributary of the pajaro river levee system in the city of watsonville, county of santa cruz.
- Federal Supply Class: PSC Y1PZ (Construction Of Other Non-Building Facilities)
- BD Action: Reference Prime Contract W912P7-25-C-A018 when contacting Granite Construction Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912P7 (W075 ENDIST SAN FRAN)
- Acquisition Method: Competed
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Recent Contract Actions from Buying Office W912P7 (W075 ENDIST SAN FRAN)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-16 | W912P7-26-D-A004 | Baird-Stantec JV Two, Blackburn Consulting, LH&J/Arcadis JV LLP and MGE Engineering Inc., Sacramento | $90.0M | 2031-09-15 | Each order of the $90,000,000 firm-fixed-price contract to provide civil design architect-engineer services |
| 2026-08-25 | W912P7-26-C-A023 | MGE Engineering | $10.2M | Feb 26, 2031 | MGE Engineering gets $10.2M modification for levee and floodwall design of reaches two and three of the Pajaro River. U.S. Army Corps of Eng... |
| 2026-07-13 | W912P7-26-C-A019 | Manson Construction | $12.9M | Jan 12, 2027 | Manson Construction wins $12.9M contract for Oakland Inner and Outer Harbor fiscal 2026 maintenance dredging project. U.S. Army Corps of Eng... |
| 2026-06-09 | W912P7-26-D-A001 | Montezuma Wetlands | $60.0M | Jun 14, 2031 | Montezuma Wetlands wins $60.0M contract for offloading and placement of dredged material services at the Montezuma Wetlands Restoration. U.S... |
| 2026-03-23 | W912P7-26-C-A006 | Manson Construction | $26.0M | Dec 15, 2026 | Manson Construction wins $26.0M contract for routine maintenance dredging. U.S. Army Corps of Engineers $26.0M obligated now work through De... |
| 2025-12-05 | W912P7-26-C-A006 | Manson Construction | $23.1M | Apr 26, 2026 | Manson Construction wins $23.1M contract for fiscal 2025 maintenance dredging of the Oakland Inner. U.S. Army Corps of Engineers $23.1M obli... |
| 2025-09-19 | W912P7-25-C-A025 | CAM-DUTRA JV-II | $9.2M | Jan 13, 2026 | CAM-DUTRA JV-II wins $9.2M contract for annual maintenance dredging. U.S. Army Corps of Engineers $9.2M obligated now work through Jan 13, 2... |
Other Recent Department of War Awards to Granite Construction
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-16 | W91238-23-C-0014 | DoD | $32.4M | - | The award record on file for W9123823C0014 shows a $202.43M ceiling and $199.93M obligated, as of the last USAspending load. |
| 2026-09-22 | W912QR-26-C-A034 | Army | $10.9M | Nov 16, 2027 | Granite Construction wins $10.9M contract for design-bid-build construction of a BAK-12/14 aircraft arresting system. U.S. Army Corps of Eng... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912P7-25-C-A018
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) / Official Agency FOIA Portal ↗
Export Contract Dossier & Related Awards
Download this contract record, sibling orders, and buying office awards in CSV, JSON, or Markdown Brief, or query via the AwardTape API & MCP server.
Building an AI agent? Get this award as JSON: GET /api/agent/v1/awards?q=W912P725CA018. Schema, sample and price or start with free sample calls.