No active exclusion found for this UEI, CAGE or legal name.
| Registration | Active / All awards / expires 2027-06-29 |
|---|---|
| Legal name | MANSON CONSTRUCTION CO (DBA MANSON CONSTRUCTION CO) |
| Address | 5209 E MARGINAL WAY S, SEATTLE, WA, 98134, USA / district 07 |
| Structure | Corporate entity (not tax exempt), incorporated in WA / in business since 1930-12-29 |
| NAICS | 237990 (+5 more) |
| API | registration JSON / SAM.gov record |
| Contract ID | Obligated (FY24+) | Type | Agency | Category | Description | Latest Action |
|---|---|---|---|---|---|---|
| N6247324F4105 | $111.4M | delivery order | Department of the Navy | Real property maintenance and repair | P508: floating dry dock mooring facility | Feb 20, 2026 |
| W9123624C5006 | $70.6M | definitive contract | Department of the Army | New construction | Norfolk harbor atlantic ocean channel dredging phase 2 | Apr 10, 2025 |
| N6945025C1079 | $61.1M | definitive contract | Department of the Navy | New construction | Design-bid-build (bbd), firm-fixed-price (ffp), construction contract for p021 lighterage and small craft facility at marine corp support facility (mcsf) blount island command (bic), jacksonville, florida. | Nov 21, 2025 |
| N6247326F0100 | $45.6M | delivery order | Department of the Navy | New construction | Constructs a new 69kv substation x and upgrades existing facilities and infrastructure to increase total pier lima electrical capacity. | Mar 11, 2026 |
| W912P825C0019 | $39.0M | definitive contract | Department of the Army | New construction | Dredging | Jul 23, 2025 |
| W912P824C0022 | $38.4M | definitive contract | Department of the Army | New construction | Dredging | Apr 22, 2026 |
| W912P824C0042 | $35.4M | definitive contract | Department of the Army | New construction | New orleans to venice, non federal levee, fritchie brackish marsh | Aug 1, 2025 |
| W911KB24C0005 | $33.4M | definitive contract | Department of the Army | Real property maintenance and repair | 2024 - 2026 maintenance dredging, anchorage harbor, alaska | May 7, 2026 |
| W9127N26CA015 | $33.2M | definitive contract | Department of the Army | New construction | Project: west coast hopper maintenance dredging 2026 | May 15, 2026 |
| W9127N25C0005 | $29.9M | definitive contract | Department of the Army | New construction | Fy25 west coast hopper dredging | Dec 9, 2025 |
| W912PL25C0003 | $27.8M | definitive contract | Department of the Army | New construction | 1st cyc dredg chan isl -b,c,d,g -1st 1m | Nov 21, 2025 |
| W912P726CA006 | $25.4M | definitive contract | Department of the Army | New construction | The work includes annual maintenance dredging of the oakland inner and outer harbor channel to -50-ft (mllw) plus 1-ft of paid over-depth and transporting of the dredged material per the requirements in specification section 00 10 00 | May 29, 2026 |
| W912P825F0102 | $22.7M | delivery order | Department of the Army | New construction | Task order #2 - berwick bay harbor | Mar 31, 2026 |
| W9127N24C0006 | $22.6M | definitive contract | Department of the Army | New construction | West coast hopper maintenance dredging 2024 | Dec 10, 2024 |
| W912P825C0017 | $22.5M | definitive contract | Department of the Army | New construction | Southwest pass - dredging | Mar 17, 2026 |
| W912PL24C0002 | $21.0M | definitive contract | Department of the Army | New construction | San gabriel river and newport bay beach nourishment stage 13, orange county, california | Mar 14, 2024 |
| W912EP25CA010 | $17.1M | definitive contract | Department of the Army | Real property maintenance and repair | Fort pierce beach renourishment, st. lucie county, florida see paragraph 1.2.1 of specifications section 01 11 00 for additional details. | May 12, 2026 |
| W912P725C0003 | $16.9M | definitive contract | Department of the Army | Real property maintenance and repair | Richmond inner harbor fy25 maintenance dredging | May 29, 2025 |
| W912P824C0033 | $15.2M | definitive contract | Department of the Army | New construction | Mississippi river outlets, vicinity of venice, louisiana, baptiste collette bar channel, #24-1 maintenance dredging, plaquemines parish, louisiana ed-24-022 | Jun 24, 2025 |
| W912EP26CA001 | $14.7M | definitive contract | Department of the Army | Real property maintenance and repair | Coastal storm risk management project hutchinson island st. lucie county, florida | Feb 17, 2026 |
| W912EP24C0019 | $14.0M | definitive contract | Department of the Army | Real property maintenance and repair | Naval submarine base kings bay, entrance channel | Jul 24, 2025 |
| W912PL25C0004 | $12.1M | definitive contract | Department of the Army | New construction | Dredging 1st cycle - all areas, 1st 300k | Jan 26, 2026 |
| W9127N24C0011 | $11.5M | definitive contract | Department of the Army | New construction | Coos bay upriver clamshell maintenance dredging 2024 | Feb 27, 2025 |
| W9127N23C0005 | $11.3M | definitive contract | Department of the Army | New construction | West coast hopper maintenance dredging 2023 | Jan 21, 2025 |
| W912P824C0026 | $11.1M | definitive contract | Department of the Army | New construction | Southwest pass - dredging | Dec 5, 2025 |
| W912PL22C0005 | $10.9M | definitive contract | Department of the Army | New construction | Maintenance dredging oceanside harbor, san diego county, california first cycle fy22 | Aug 4, 2025 |
| W912P824C0027 | $10.6M | definitive contract | Department of the Army | New construction | Dredging | Aug 11, 2025 |
| W9127823F0270 | $10.4M | delivery order | Department of the Army | New construction | Maintenance dredging of mobile harbor | Nov 24, 2025 |
| W912PL26CA004 | $7.0M | definitive contract | Department of the Army | New construction | Annual maintenance dredging of the federal navigation channels with oceanside harbor. this is the 1st cycle of a 4-year solicitation, with a base cycle (2026) and option cycles in 2026, 2027, and 2028. | May 14, 2026 |
| W912HN25C5002 | $6.1M | definitive contract | Department of the Army | Real property maintenance and repair | Savannah entrance harbor hopper dredging | Jan 23, 2025 |
| W9127823F0198 | $5.7M | delivery order | Department of the Army | New construction | The contractor shall furnish a 30-inch cutterhead pipeline dredge and attendant plant with adequate lengths of pipeline, equipment, materials, supplies, and manpower required to perform dredging of the mobile harbor channels, mobile, ... | Jun 17, 2025 |
| W9127825F0021 | $5.5M | delivery order | Department of the Army | New construction | Maintenance dredging, hopper dredge and attendant plant for dredging in alabama, mississippi, and florida | Feb 2, 2026 |
| W912PL22C0002 | $5.4M | definitive contract | Department of the Army | New construction | Ventura harbor maintenance dredging, ventura county, ca 1st cycle, clin 2a dredging, 1st cycle all areas | May 3, 2024 |
| W9127823F0193 | $5.3M | delivery order | Department of the Army | New construction | The contractor shall furnish a 30-inch cutterhead pipeline dredge and attendant plant with adequate lengths of pipeline, equipment, materials, supplies, and manpower required to perform dredging of the mobile harbor channels, mobile, ... | Nov 8, 2024 |
| N4425524F5003 | $5.3M | delivery order | Department of the Navy | Real property maintenance and repair | X003 6030108 1785603 -- (22952620)(siop) pier 5 pile replacement | Feb 24, 2026 |
| W9127823F0370 | $4.9M | delivery order | Department of the Army | New construction | Dredging of the pensacola harbor channels, pensacola, florida, | Nov 24, 2023 |
| W912P823C0037 | $4.2M | definitive contract | Department of the Army | New construction | Calcasieu maintenance dredging | Feb 1, 2024 |
| W9127825F0030 | $3.6M | delivery order | Department of the Army | New construction | Dredging gulfport harbor channels | Aug 4, 2025 |
| W912P723C0013 | $3.2M | definitive contract | Department of the Army | Real property maintenance and repair | The work includes annual maintenance dredging of oakland inner and outer harbor channel to -50ft. | Feb 1, 2024 |
| W9127824F0029 | $2.8M | delivery order | Department of the Army | New construction | Dredging of the pascagoula harbor channels, pascagoula, mississippi. | Jul 2, 2024 |
| W9127825F0071 | $2.1M | delivery order | Department of the Army | New construction | Dredging the pascagoula harbor channels, pascagoula, mississippi. | Apr 2, 2026 |
| W912DW22C0006 | $1.9M | definitive contract | Department of the Army | New construction | Lwsc large lock center gate replacement | Mar 19, 2026 |
| W9127824F0081 | $1.2M | delivery order | Department of the Army | New construction | Maintenance dredging of pensacola harbor. | Apr 29, 2024 |
| W9127824F0105 | $1.0M | delivery order | Department of the Army | New construction | The contractor shall furnish the equipment, materials, supplies, and manpower required to perform maintenance dredging of the pascagoula harbor in pascagoula, mississippi. | May 28, 2024 |
| W9127825FA099 | $825K | delivery order | Department of the Army | New construction | The contractor shall furnish the equipment, materials, supplies, and manpower required to perform maintenance dredging of panama city harbor. the work to be performed shall be iaw the plans schedule as directed by the panama city site ... | Aug 13, 2025 |
| N4425526F0053 | $745K | delivery order | Department of the Navy | Real property maintenance and repair | Replace all cathodic protection at b7132, nswc car -bangor | Apr 9, 2026 |
| N4425525F0025 | $714K | delivery order | Department of the Navy | Real property maintenance and repair | Remove and replace five 14 inch wood pile and install five sacrificial anodes to the five new steel pile. remove and replace all kb docks pier and trestle pile bracing, cross bracing and hardware. | Sep 29, 2025 |
| N6247324F5031 | $692K | delivery order | Department of the Navy | Real property maintenance and repair | X003 blue cove marina repair piles and decking | Feb 10, 2025 |
| N6247321F4668 | $175K | delivery order | Department of the Navy | Real property maintenance and repair | P443 db construction pier 6 replacement nbsd | Feb 9, 2024 |
| N4425520C2002 | $69K | definitive contract | Department of the Navy | New construction | P834 - seawolf class service pier extension, naval base kitsap bangor, silverdale, wa | Mar 4, 2024 |
| # | Parent Contract ID | Task Orders | Obligated (FY24+) | Vehicle Ceiling | Unused Ceiling | Description | Latest Order |
|---|---|---|---|---|---|---|---|
| 1 | N6247321D1406 | 4 | $157.9M | $111.4M | - | X003 blue cove marina repair piles and decking | Mar 11, 2026 |
| 2 | W912P825D0014 | 2 | $22.7M | $23.2M | - | Task order #2 - berwick bay harbor | Mar 31, 2026 |
| 3 | W9127823D0065 | 5 | $18.7M | $18.5M | - | The contractor shall furnish a 30-inch cutterhead pipeline dredge and attendant plant with adequate lengths of pipeline, equipment, materials, supplies, and manpower required to perform dredging of the mobile harbor channels, mobile, ... | Jun 17, 2025 |
| 4 | W9127823D0057 | 4 | $12.7M | $17.8M | - | The contractor shall furnish the equipment, materials, supplies, and manpower required to perform maintenance dredging of the pascagoula harbor in pascagoula, mississippi. | Nov 24, 2025 |
| 5 | W9127824D0067 | 5 | $12.0M | $5.5M | - | The contractor shall furnish the equipment, materials, supplies, and manpower required to perform maintenance dredging of panama city harbor. the work to be performed shall be iaw the plans schedule as directed by the panama city site ... | Apr 2, 2026 |
| 6 | N4425521D5004 | 6 | $6.8M | $6.4M | - | X003 6030108 1785603 -- (22952620)(siop) pier 5 pile replacement | Apr 9, 2026 |
| 7 | N6247822D4008 | 2 | -$640K | $6.6M | - | X001 wr152744-won1684025-drydock no.4 caisson - 5 year ut plating | Aug 8, 2024 |
Unused ceiling is uncommitted capacity across available contract records, not guaranteed spending. Vehicle details summarize the largest 500 records.
| # | Agency | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Department of the Army | 55 | $628.2M | 74% |
| 2 | Department of the Navy | 17 | $225.2M | 26% |
| # | Category | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | New construction | 51 | $634.7M | 74% |
| 2 | Real property maintenance and repair | 20 | $218.6M | 26% |
| 3 | Architect-engineering services | 1 | $54K | 0.0% |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 24, 2026.
Export Custom Datasets or Query the AwardTape API
Select from 6 core datasets (Contractors, Contract Instruments, Expiring Recompetes, Allied Procurement, HV Grid Queue, Sanctions/UFLPA), filter by company, ticker, or PIID, and export in CSV, JSON, or Markdown Brief.
Building an AI agent? Get this company profile as JSON: GET /api/agent/v1/companies/manson-construction. Schema, sample and price or start with free sample calls.