AwardTape / Contracts / W91238-23-C-0014

W91238-23-C-0014: $199.9M Department of the Army Award to Granite Construction

The sacramento weir widening will reduce water surface elevation in sacramento river and allow water to flow into the yolo bypass system. project consists of construction of a passive weir, levee setback, fish passage control among others.. Contracting activity: W075 ENDIST SACRAMENTO. Estimated completion: 2026-12-02.

$199.9M total obligated / $32.4M latest announced action / $202.4M ceiling / Competed / 2026-12-02 completion / W91238 W075 ENDIST SACRAMENTO

1. Contract Summary & Primary Sources

Contract Number (PIID) W91238-23-C-0014 (unhyphenated: W9123823C0014)
Prime Contractor (Awardee) Granite Construction (California)
FY2024-FY2026 Federal Defense Portfolio: $868.2M obligated across 22 contracts
Total Obligated (all actions) $199,932,393 ($199.9M)
Latest Announced Action (2026-10-16) $32,400,000
Ceiling (maximum contract value) USAspending base and all options: $202,432,616
USAspending / FPDS Obligation History Total obligated: $199,932,393 / Obligated FY2024 onward: $15,239,569 (signed 2023-06-01, latest FPDS action 2026-05-27)
Awarding Branch / Agency Department of the Army
Contracting Command & DoDAAC W91238: W075 ENDIST SACRAMENTO
Competition & Contract Structure Competed / Definitive Contract (definitive contract) / Firm-Fixed-Price (FFP)
Product / Service & Industry Codes PSC Y1PZ (Construction Of Other Non-Building Facilities) / NAICS 237990 (Other Heavy And Civil Engineering Construction)
Work Locations & Funding Primary Place of Performance: California
Estimated Completion Date 2026-12-02
Verified Primary Sources

2. Verbatim Announcement & Scope Breakdown

Department of War Daily Contracts Release / 2026-10-16 (DoD) Official war.gov source ↗ / AwardTape 2026-10-16 Release

The award record on file for W9123823C0014 shows a $202.43M ceiling and $199.93M obligated, as of the last USAspending load.

USAspending / FPDS Transaction Description (Contract W9123823C0014)

The sacramento weir widening will reduce water surface elevation in sacramento river and allow water to flow into the yolo bypass system. project consists of construction of a passive weir, levee setback, fish passage control among others.

3. Subcontractor, Supply Chain & Capture Intelligence

For Tier-2 / Tier-3 Subcontractors & Suppliers

Subcontracting & Material Supply Window

  • Prime Awardee: Granite Construction
  • Delivery Runway: Active through 2026-12-02
  • Requirement Scope: The sacramento weir widening will reduce water surface elevation in sacramento river and allow water to flow into the yolo bypass system. project consists of construction of a passive weir, levee setback, fish passage control among others.
  • Federal Supply Class: PSC Y1PZ (Construction Of Other Non-Building Facilities)
  • BD Action: Reference Prime Contract W91238-23-C-0014 when contacting Granite Construction Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers

Buying Command & Recompete Posture

  • Buying Command: W91238 (W075 ENDIST SACRAMENTO)
  • Acquisition Method: Competed
  • FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
  • Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Granite Construction Supply Chain / Small Business Liaison referencing contract W91238-23-C-0014.

Recent Contract Actions from Buying Office W91238 (W075 ENDIST SACRAMENTO)

Date Contract (PIID) Prime Contractor Amount Completion Scope Summary
2026-11-12 W91238-27-C-A002 Martin Brothers Construction $26.7M Nov 13, 2028 The construction of an Energy Resilience and Conservation Investment Program microgrid
2026-10-30 W91238-27-D-A001 AECOM Technical Services Inc. $238.0M Oct 29, 2031 AECOM Technical Services Inc., Los Angeles, California (W91238-27-D-A001); RJH Consultants Inc.,* Englewood, Colorado (W91238-27-D-A002); LH...
2026-09-30 W91238-26-C-A014 M.A. Mortenson $218.7M Aug 13, 2029 M.A. Mortenson wins $218.7M contract for design-build construction of a two-story depot maintenance complex to support F-35. U.S. Army Corps...
2026-09-30 W91238-26-C-A014 M.A. Mortenson Co. $0 - CORRECTION: The $218,654,000 firm-fixed-price contract (W91238-26-C-A014) announced on Sept. 29, 2026, to M.A. Mortenson Co., Minneapolis, M...
2026-09-29 W91238-26-C-A014 M.A. Mortenson $218.7M Aug 11, 2029 M.A. Mortenson wins $218.7M contract for design-build construction of a hangar maintenance facility. U.S. Army Corps of Engineers $100.0M ob...
2026-08-27 W91238-23-C-0010 Folsom Dam Constructors $10.3M Oct 26, 2029 Folsom Dam Constructors gets $10.3M modification for Folsom Dam Wing Dam construction. U.S. Army Corps of Engineers $10.3M obligated now wor...
2026-06-15 W91238-26-D-A001 Landology Inc $99.0M Jun 11, 2031 Landology and 4 others share $99.0M order for each order of the $99,000,000 firm-fixed-price contract for mitigation. U.S. Army Corps of Eng...
2026-06-15 W91238-26-C-A005 SES Construction and Fuel Services $17.7M Sep 29, 2028 SES Construction and Fuel Services wins $17.7M contract for design and construction of a one-story egress facility for depot-level repairs. ...

Other Recent Department of War Awards to Granite Construction

Date Contract (PIID) Branch Amount Completion Scope Summary
2026-09-22 W912QR-26-C-A034 Army $10.9M Nov 16, 2027 Granite Construction wins $10.9M contract for design-bid-build construction of a BAK-12/14 aircraft arresting system. U.S. Army Corps of Eng...
2025-09-05 W912P7-25-C-A018 Army $39.3M Sep 11, 2027 Granite Construction wins $39.3M contract for levee and floodwall construction. U.S. Army Corps of Engineers $39.3M obligated now work throu...

4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)

Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)

Pre-Filled FOIA Request Letter for W91238-23-C-0014

Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) / Official Agency FOIA Portal ↗

Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.

Export Contract Dossier & Related Awards

Download this contract record, sibling orders, and buying office awards in CSV, JSON, or Markdown Brief, or query via the AwardTape API & MCP server.

Building an AI agent? Get this award as JSON: GET /api/agent/v1/awards?q=W9123823C0014. Schema, sample and price or start with free sample calls.