AwardTape · Defense awards · Search
Award search results
50 awards and more, largest obligated first.
Results50 per page · sorted by obligated FY2024+
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| N6945025F1062 delivery order | RQ Construction, LLC | $47.7M | The project includes the design and construction associated with the renovation of building 101 at nas jacksonville, fl. | Navy | Real property maintenance and repair | Jul 25, 2025 DoD 90d |
| W912QR24C0008 definitive contract | Roundhouse PBN - Tepa Ec Joint Venture | $27.7M | Renovation of hangar 750 at patrick space force base base and options 1,4 and 6 are being awarded. | Army | Real property maintenance and repair | Mar 19, 2026 DoD 90d |
| W50SLF24C0002 definitive contract | Pacific Federal Solutions, LLC | $17.8M | Construction services for knmd202094 corrosion control b3407. work covered in this project includes but is not limited to repair of existing facility f-22 light low observational, corrosion control, wash rack and fuel cell repair facility. | Army | Real property maintenance and repair | Aug 6, 2025 DoD 90d |
| N6945025C1059 definitive contract | Cci Prime Contractors LLC | $16.8M | Replace maintenance hangar roof, building 2 a. base bid: low-slope membrane roof replacementb. bid option 001: lightning protection c. bid option 002: structural steel superstructure protection coating system | Navy | Real property maintenance and repair | Sep 16, 2025 DoD 90d |
| FA524025C0003 definitive contract | Modern International Inc | $15.2M | Ajjy 23-1007 repair airfield electrical conduit and glideslope system | Air Force | Real property maintenance and repair | Jun 6, 2025 DoD 90d |
| N6247325F4235 delivery order | Coffman Specialties, Inc | $14.7M | Task order award of mi2503m/mi2002m 24l runway repair and simulated carrier deck lighting system at mcas miramar | Navy | Real property maintenance and repair | Apr 2, 2026 DoD 90d |
| FA813724C0005 definitive contract | Miami Nation Stronghold, LLC | $9.9M | The work to be performed under this contract consists of furnishing all design/engineering serv, materials, labor, plant, tools, transportation, equip, testing serv, quality control and incidentals required to accomplish the repair of the ... | Air Force | Real property maintenance and repair | Dec 17, 2025 DoD 90d |
| N4008024F4816 delivery order | Cer, Incorporated | $9.9M | H115 life extension center-lean-to construction | Navy | Real property maintenance and repair | Feb 26, 2025 DoD 90d |
| N6945024F0841 delivery order | Walga Ross Group 3 JV | $9.5M | H101s envelope & fire suppression repair at nas jax, fl | Navy | Real property maintenance and repair | Oct 16, 2025 DoD 90d |
| W912QR23C0006 definitive contract | Golden Triangle Construction Co Inc | $9.1M | Contractor is to provide all work, labor, materials, and equipment required for the pittsburgh ars repair apron project (phases 1a and 1b) located at pittsburgh, pa. | Army | Real property maintenance and repair | Aug 4, 2025 DoD 90d |
| N6945025F1082 delivery order | Sauer Construction, LLC | $8.9M | Firm-fixed price (ffp) design-bid-build (dbb) task order for airfield lighting at ns mayport, fl. | Navy | Real property maintenance and repair | Jul 14, 2025 DoD 90d |
| FA441725C0010 definitive contract | Reasor Building Group LLC | $8.2M | Interior renovation of building 90131 for the 2nd sos, and 65 sos facility includes renovation of the flight hangar. | Air Force | Real property maintenance and repair | Mar 23, 2026 DoD 90d |
| N6247325F0324 delivery order | Lead Builders Inc | $7.9M | This is a design-bid-build project will repair and modernize the electrical system of hangar pm324 to accommodate the required 400 hz electrical capacity rating in support of vx-30 mission growth. | Navy | Real property maintenance and repair | Aug 18, 2025 DoD 90d |
| N4008426F4201 delivery order | Mvl-Bromgrove JV LLC | $7.9M | Repair approach lighting system, airfield runway, f-200049, naval support facility diego garcia | Navy | Real property maintenance and repair | Apr 6, 2026 DoD 90d |
| FA489723F0003 delivery order | Burton Construction, Inc | $6.7M | Repair and fire suppression for aircraft hangar 208 at mountain home afb, ifb | Air Force | Real property maintenance and repair | Feb 20, 2026 DoD 90d |
| N4008524F5977 delivery order | TST Tactical Defense Solutions, Inc | $6.7M | Replace roof & lightning protection, hangar 200, nas oceana | Navy | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| N6945026F0086 delivery order | Koman Construction, LLC | $6.0M | Contractor shall perform various repairs as outlined in the rfp, and described in the clin descriptions found in the contract. repairs include roofing, interior repairs, and chiller replacement. | Navy | Real property maintenance and repair | Dec 19, 2025 DoD 90d |
| N4008025F0088 delivery order | Sustainable Building Solutions, LLC | $5.9M | B305 replace roof | Navy | Real property maintenance and repair | Mar 25, 2026 DoD 90d |
| W9123823C0021 definitive contract | Hhi Corporation | $5.6M | Hill air force base building 225 area d roof replacement and office space renovation. | Army | Real property maintenance and repair | May 14, 2026 DoD 90d |
| FA252325C0003 definitive contract | Per Aarsleff Gronland Aps | $5.6M | Repair by replacement the roof in its entirety on hangar 7, b623 (wwcx22-1008) and hangar 8, b624 (wwcx22-1009) in accordance with wwcx22-1008-specifications rev3 and wwcx22-1009-specifications rev3, respectively. | Air Force | Real property maintenance and repair | Aug 22, 2025 DoD 90d |
| FA465924F0008 delivery order | Greenstone Construction, Inc | $5.1M | Repair fire suppression, roof, insulation hangar 603 at grand forks air force base, north dakota. | Air Force | Real property maintenance and repair | Sep 6, 2024 DoD 90d |
| N4019224F4086 delivery order | Techni-Con, Inc | $5.0M | Igf: ot: igf won 1787012 replace hvac at b18104 | Navy | Real property maintenance and repair | Mar 29, 2024 DoD 90d |
| N6945025F1417 delivery order | Healtheon, Inc | $5.0M | B101 small hangar re-roof and door | Navy | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| N6247323F4878 delivery order | Peter Vander Werff Construction, Inc | $4.7M | X004 emergency repair hangars 553 and 323 at point mugu | Navy | Real property maintenance and repair | Nov 28, 2023 DoD 90d |
| N6247325F4018 delivery order | Bristol Design Build Services, LLC | $4.3M | Renovate exterior pm324 at point mugu, naval base ventura county, ca | Navy | Real property maintenance and repair | Nov 10, 2025 DoD 90d |
| N4008424F4311 delivery order | American Engineering Corporation | $4.0M | N4008423d0042, multiple award construction contract (big-macc) at u.s. mcas iwakuni, japan, n4008424f4311, convert airfield lighting to led zone e and f | Navy | Real property maintenance and repair | Sep 23, 2024 DoD 90d |
| N4008026F0162 delivery order | Egi Hsu JV LLC | $4.0M | Design-build to replace - bldg 2134 hmx-1 hangar roof, marine corps air facility mcb quantico, va | Navy | Real property maintenance and repair | May 18, 2026 DoD 90d |
| N6945025C1042 definitive contract | The Blackledge Group, Inc | $3.9M | Install runway 05 instrument landing system (ils) infrastructure | Navy | Real property maintenance and repair | Aug 26, 2025 DoD 90d |
| FA560624F0044 delivery order | J & J Maintenance Inc | $3.9M | Repair aircraft hardened aircraft shelters and hardstand 3075 and 3079 in accordance with the statement of work dated 14 march 2024. | Air Force | Real property maintenance and repair | May 28, 2025 DoD 90d |
| FA520526F0035 delivery order | Tanakagumi Co.,ltd | $3.7M | Project no. qkka 222447, repair thaw electrification, has b3217, misawa ab, japan | Air Force | Real property maintenance and repair | Feb 26, 2026 DoD 90d |
| FA286025C0020 definitive contract | Superior Structures LLC | $3.6M | The contractor shall furnish all supervision, labor, transportation, equipment, material, and perform all operations necessary to accomplish the construction/repair of hangar 21, joint base andrews, maryland iaw the requirements specified ... | Air Force | Real property maintenance and repair | Sep 26, 2025 DoD 90d |
| N4008524F4260 delivery order | Baron-Rand JV LLC | $3.6M | Nas oceana shore instrument carrier landing system (icls) in | Navy | Real property maintenance and repair | Sep 11, 2024 DoD 90d |
| N6945026F0263 delivery order | Cci Facility Contractors LLC | $3.5M | Airfield ramp lighting located at nas jrb fort worth, texas | Navy | Real property maintenance and repair | May 14, 2026 DoD 90d |
| FA560624F0108 delivery order | J & J Maintenance Inc | $3.0M | The rehabilitation of has and hardstand 3085. includes the renovation of the entire has from the outside and inside, including electrical. the hardstand is also to be renewed in accordance with the statement of work (sow) dated 15 august ... | Air Force | Real property maintenance and repair | Mar 5, 2026 DoD 90d |
| N6247325F0374 delivery order | Pave-Tech Inc | $3.0M | This project consists of repairing ac pavement failures at various locations along taxiway echo. the portion of taxiway echo associated with this project begins at the taxiway echo pcc and ac interfaceand runs approximately 2200ft | Navy | Real property maintenance and repair | Jul 24, 2025 DoD 90d |
| N4008025F4062 delivery order | Sustainable Building Solutions, LLC | $2.8M | B458 replace roof on drill hall | Navy | Real property maintenance and repair | Dec 17, 2025 DoD 90d |
| FA560625F0036 delivery order | Wolff & Müller Government Services GMBH & Co KG | $2.7M | Construction measure for the repair of the mechanical parts of the big rolling doors at 8 of the 3rd gen has facilities at spangdahlem ab in accordance with the statement of work (sow) dated 24 march 2025 and contractor proposal dated 04 ... | Air Force | Real property maintenance and repair | Nov 6, 2025 DoD 90d |
| FA930124F0105 delivery order | Miwok Construction LLC | $2.6M | Repair electrical substation | Air Force | Real property maintenance and repair | Jun 13, 2024 DoD 90d |
| N4425524F4401 delivery order | DTS P&l Jv2 | $2.6M | Cutout main hangar 7 bay door for p8 parking, b2544, naswi | Navy | Real property maintenance and repair | Sep 18, 2025 DoD 90d |
| FA560624F0107 delivery order | Ske Support Services GMBH | $2.5M | The rehabilitation of has and hardstand 3084. includes the renovation of the entire has from the outside and inside, including electrical. the hardstand is also to be renewed in accordance to the statement of work (sow) dated 16 august ... | Air Force | Real property maintenance and repair | May 26, 2026 DoD 90d |
| FA448425F0297 delivery order | R & W Contractors Inc | $2.5M | Repair rwy 06/24 ptfl221017 | Air Force | Real property maintenance and repair | Aug 14, 2025 DoD 90d |
| FA487724C0036 definitive contract | Ac Lopez Construction Inc | $2.3M | Repair and upgrade the electrical framework to hangar 7408. | Air Force | Real property maintenance and repair | Mar 13, 2026 DoD 90d |
| W912UM24F0001 delivery order | Yibon Construction Co, LTD | $2.3M | Smyu 22-1003 repair airfield pavements, osan ab | Army | Real property maintenance and repair | Jun 20, 2025 DoD 90d |
| N6247324C3003 definitive contract | W E S T Development, Inc | $2.0M | Fmd - m022034553145 | Navy | Real property maintenance and repair | Jul 23, 2025 DoD 90d |
| W90VN626FA037 delivery order | Yibon Construction Co, LTD | $1.9M | Smyu 25-1070, osan air base parking apron extension | Army | Real property maintenance and repair | May 26, 2026 DoD 90d |
| FA302024F0211 delivery order | A-1 Sheffield Team LLC | $1.9M | Work includes installing a wildlife deterrent barrier along the interior of the installation perimeter fence line, to be comprised of buried fence skirting of galvanized chain link mesh attached to the bottom of the existing chain-link ... | Air Force | Real property maintenance and repair | Sep 5, 2025 DoD 90d |
| N4008024F4058 delivery order | Doyon Management Services, LLC | $1.8M | X002 ipl24 b162 repair water intrusion and structural repair and | Navy | Real property maintenance and repair | Jul 17, 2025 DoD 90d |
| FA448626F0004 delivery order | Meneses & Mcfadden, Cartor, Vitor Hugo Carvalho, Lda | $1.8M | The contractor shall provide all plant labor, materials, tools, equipment, transportation, supervision, and personnel necessary to accomplish the work described in the statement of work and drawings to repair and upgrade the aprons ... | Air Force | Real property maintenance and repair | Feb 10, 2026 DoD 90d |
| W912DY23C0065 definitive contract | Ses Electrical LLC | $1.8M | Renovation of hangar 751 for air force special ops command, pope ARMY airfield, fort liberty, nc | Army | Real property maintenance and repair | May 5, 2026 DoD 90d |
| N4008419C8304 definitive contract | Nihon Meccs Co.,ltd | $1.8M | Repair aircraft maintenance hangar | Navy | Real property maintenance and repair | May 8, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters by company, agency, category and date, with CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial