AwardTape · Defense awards · Healtheon, Inc
Healtheon, Inc: $144.5M in DoD and DHS awards
Healtheon, Inc holds 35 DoD and DHS prime awards with $144.5M obligated Oct 4, 2023 to Sep 30, 2026. Largest category: New construction at $108.0M; largest buyer: Department of the Air Force at $53.3M.
| Obligated FY2024+ | $144.5M |
|---|---|
| Awards | 35 |
| FY2024 | $38.0M |
| FY2025 | $29.1M |
| FY2026 to date | $77.4M |
| Lifetime obligated on these awards | $214.0M |
| First and latest action | Oct 4, 2023 · Sep 30, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | New construction | $108.0M | 24 awards | 75% |
| 2 | Real property maintenance and repair | $36.4M | 10 awards | 25% |
| 3 | Architect-engineering services | $73K | 1 awards | 0.1% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $53.3M | 13 awards | 37% |
| 2 | U.S. Coast Guard | $47.1M | 6 awards | 33% |
| 3 | Department of the Navy | $31.1M | 8 awards | 22% |
| 4 | Department of the Army | $12.9M | 8 awards | 9.0% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA910124FB001 delivery order | $29.8M | High pressure air additional capacity phase ii (hpaac ii) | Air Force | New construction | May 7, 2026 DoD 90d |
| 70Z0G126FCGA00006 delivery order | $29.4M | Design-build construction project for the reconfiguration and repair of waesche hall. | U.S. Coast Guard | New construction | Sep 29, 2026 |
| 70Z0G126FCGA00003 delivery order | $17.7M | Replace hvac satterlee hall at the u.s. coast guard academy, new london, ct (new london county), project no. 21590948 | U.S. Coast Guard | New construction | Sep 30, 2026 |
| FA910126FB016 delivery order | $9.1M | Repair sewage treatment plant building 1522 | Air Force | New construction | Feb 5, 2026 DoD 90d |
| FA910126FB002 delivery order | $8.3M | Replace the astf cooling tower structure, fans, spray piping, and other supporting systems down to the concrete basin | Air Force | New construction | Dec 8, 2025 DoD 90d |
| N6945025F1325 delivery order | $6.8M | Crane repairs | Navy | Real property maintenance and repair | Sep 14, 2025 DoD 90d |
| N6945025F1434 delivery order | $5.4M | B111 structural repairs - this project includes reroofing, structural framing and deck repairs, utility removal and reinstallation, abatement and incidental related work. | Navy | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| N6945026F0222 delivery order | $5.0M | B101w climate controlled paint booth installation | Navy | Real property maintenance and repair | Apr 14, 2026 DoD 90d |
| N6945025F1417 delivery order | $5.0M | B101 small hangar re-roof and door | Navy | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| W9127824F0301 delivery order | $4.8M | The purpose of this task order is to design and construct a restricted water distribution system repairs at anniston ARMY depot, al. | Army | New construction | Mar 9, 2026 DoD 90d |
| W9127824F0261 delivery order | $4.5M | The purpose of this task order is key west swimming pool repairs at flemming key, key west, fl. | Army | Real property maintenance and repair | Jun 2, 2026 DoD 90d |
| N6945025F0332 delivery order | $4.1M | Water front repairs onboard blount island | Navy | Real property maintenance and repair | Sep 22, 2025 DoD 90d |
| N6945025F1439 delivery order | $3.5M | B4 and b614 remove and replace roof at naval air station jacksonville, florida | Navy | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| FA910126FB003 delivery order | $3.1M | Replace ct discharge supply header and 7 ct pumps suction, discharge, and check valves | Air Force | New construction | Nov 23, 2025 DoD 90d |
| W9127822F0175 delivery order | $2.0M | Fire station #4, tyndall | Army | New construction | May 27, 2026 DoD 90d |
| N6945025F1408 delivery order | $1.3M | H117 roof replacement and structural repairs naval air station jacksonville, florida | Navy | Real property maintenance and repair | Sep 26, 2025 DoD 90d |
| FA910126FB028 delivery order | $955K | Facilities acquisitions for restoration and modernization (farm) ii repair by replace vkf raw water lines, fac 20009 | Air Force | New construction | Apr 2, 2026 DoD 90d |
| W9127822F0459 delivery order | $861K | Construct repairs to barracks 6105 and 6106 | Army | New construction | Jan 27, 2026 DoD 90d |
| FA252122F0086 delivery order | $789K | Repair utilities, exterior finish & construct roof stairwell bldg 89100 (moc) cape canaveral space force station. | Air Force | Real property maintenance and repair | Aug 12, 2025 DoD 90d |
| FA910119F0107 delivery order | $600K | Replace hydraulic pumps - astf | Air Force | New construction | Oct 30, 2023 DoD 90d |
| FA910122FB036 delivery order | $540K | Building 1020 renovation | Air Force | New construction | Feb 26, 2024 DoD 90d |
| W9127822F0456 delivery order | $460K | Bldg. 433 renovations | Army | New construction | Sep 30, 2025 DoD 90d |
| W9127822F0465 delivery order | $263K | D3 replace towers 9985, 9986 and 9987, cape san blas, florida | Army | New construction | Mar 20, 2026 DoD 90d |
| FA252122F0234 delivery order | $73K | The contractor is to provide all materials, labor, and equipment for a design-build replacement of the existing building 962 generator with one right-sized generator, brand name cummins, at patrick space force base, florida. | Air Force | Architect-engineering services | Jan 24, 2025 DoD 90d |
| W9127822F0352 delivery order | $11K | Repair bldg 4511 | Army | New construction | Aug 2, 2024 DoD 90d |
| 70Z04724FPCNI0014 delivery order | $10K | Minimum guarantee | U.S. Coast Guard | New construction | Aug 12, 2024 |
| 70Z04724FPCNI0025 delivery order | $10K | Nmacc iii pool 2: minimum guarantee | U.S. Coast Guard | New construction | Aug 20, 2024 |
| 70Z04724DPCNI0005 IDIQ contract | $0 | National multiple award construction contract iii (nmacc iii) idiq | U.S. Coast Guard | New construction | Aug 13, 2026 |
| 70Z04724DPCNI0015 IDIQ contract | $0 | Nmacc iii multiple award construction contract pool 2 | U.S. Coast Guard | New construction | Sep 30, 2026 |
| FA252123F0384 delivery order | $0 | Dbeh 23-1573, restripe trident wharf at notu fac.79100, cape canaveral space force station, fl. | Air Force | Real property maintenance and repair | Aug 22, 2024 DoD 90d |
| FA910122DB001 IDIQ contract | $0 | Facilities acquisitions for restoration and modernization (farm) ii | Air Force | New construction | Jun 2, 2026 DoD 90d |
| FA910122FB002 delivery order | $0 | Leg 2 isolation valve and post award conference | Air Force | New construction | Jun 12, 2025 DoD 90d |
| N6945023D0008 IDIQ contract | $0 | General construction projects nte 5 yrs | Navy | New construction | May 13, 2025 DoD 90d |
| W9127824D0031 IDIQ contract | $0 | Two phase design build multiple award task order contract for general construction and repair in the mobile district area of responsibility. | Army | New construction | Jul 12, 2024 DoD 90d |
| FA910121F0003 delivery order | -$7.5K | Facilities acquistions for restoration and modernization (farm) - design/build replace tunnel d sidewalls | Air Force | New construction | May 17, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial