AwardTape · Categories · Construction · Real property maintenance and repair
Real property maintenance and repair: $41.2B in defense awards
$41.2B obligated across 43,990 DoD and DHS awards to 5,415 companies, Oct 1, 2023 to Oct 7, 2026, 28% of Construction. Barnard Construction Company, Incorporated leads with $1.4B; Department of the Army is the largest buyer at $16.6B.
| Obligated FY2024+ | $41.2B |
|---|---|
| Awards | 43,990 |
| Companies | 5,415 |
| FY2024 | $15.8B |
| FY2025 | $15.7B |
| FY2026 to date | $9.6B |
| Parent category | Construction |
| Award | Company | Obligated FY2024+ | What | Agency | Latest action |
|---|---|---|---|---|---|
| W9127N19C0025 definitive contract | J E Mcamis, Inc | $23.3M | Mouth of the columbia river, (mcr) south jetty rehabilitation | Army | Feb 12, 2025 DoD 90d |
| N6945025F0057 delivery order | RQ Construction, LLC | $23.3M | Demolition of various facilities at nas pensacola, fl | Navy | Sep 25, 2025 DoD 90d |
| FA890324F0108 delivery order | CMS Corporation | $23.3M | The contractor shall provide the necessary effort and management in accordance with the sow entitled, repair tanks 32 (fac#41132) at wake island, identified in section j, attachment 1. | Air Force | May 7, 2026 DoD 90d |
| W9127825CA015 definitive contract | SNC Tallimat, LLC | $23.2M | Operations and maintenance with incidental repair and minor construction of the naval hospital camp pendleton (nhcp) and its designated outlying medical treatment facilities. | Army | May 6, 2026 DoD 90d |
| W912DY25FA196 delivery order | Ses Electrical LLC | $23.1M | Design and repair the existing sterilizations processing department (spd). scope includes all intricate pieces of the spd and its associated systems that reach into the hospital. current spd is located on the 1st floor of david grant ... | Army | Oct 30, 2025 DoD 90d |
| N6945024F0348 delivery order | J&j and Alms Mission Support Solutions, LLC | $23.0M | New recurring to award for option period #1 bos services | Navy | Sep 8, 2025 DoD 90d |
| W912QR26CA011 definitive contract | Benaka, Inc | $23.0M | Design-build - ARMY reserve center maintenance repair ARMY reserve (mrar) - newtown square, pa | Army | Feb 12, 2026 DoD 90d |
| N6247825F4002 delivery order | Nan Inc | $23.0M | Rm20-0230 dry dock no. 1 void repair, siop, phnsy, hi | Navy | Jul 24, 2025 DoD 90d |
| W9127824F0404 delivery order | KGJJ Engineering Solutions, LLC | $23.0M | Repair/renew building 2268, naval hospital pensacola, nas pensacola, fl | Army | Mar 10, 2026 DoD 90d |
| W9127S26CA002 definitive contract | Red Eagle 3 JV | $22.9M | This is a requirement to replace the waterlines on the south side of pine bluff arsenal. | Army | Nov 13, 2025 DoD 90d |
| W912HN23C4005 definitive contract | 4k Global-Acc JV, LLC | $22.8M | Construction - please see clin schedule | Army | Jan 29, 2026 DoD 90d |
| FA301624F0040 delivery order | Lifecycle Construction Services, LLC | $22.8M | Mesquite dining facility (dfac) renovation - jbsa lackland b101 | Air Force | Apr 16, 2026 DoD 90d |
| W912DR26CA002 definitive contract | Curtin Maritime Corp | $22.8M | Fy26 baltimore harbor and channels maintenance dredging, maryland channels, chesapeake bay, md. | Army | May 29, 2026 DoD 90d |
| N6945024F0690 delivery order | Whiting-Turner Contracting Company, the | $22.6M | Hurricane sally repair supp. package 1 nas pensacola, fl | Navy | Jul 30, 2024 DoD 90d |
| N4008525F2544 delivery order | Stampede Ventures, Inc | $22.6M | Design-build (db), w-143 repair/seal exterior walls & windows naval station, norfolk, virginia | Navy | Dec 9, 2024 DoD 90d |
| W912HY24C0009 definitive contract | Orion Marine Construction, Inc | $22.5M | Corpus christi ship channel, texas, inner basin to viola, maintenance dredging. schedule no. 1 consists of dredging approximately 2.5 million cubic yards 3 options total an additional 640,000 cubic yards. | Army | Nov 3, 2025 DoD 90d |
| FA930125F0120 delivery order | Lead Builders Inc | $22.5M | Repair renovate dorms b2425 | Air Force | May 16, 2025 DoD 90d |
| W912DY25FA236 delivery order | Structsure Projects Inc | $22.4M | Replace four (4) of 13 air handlers units (ahus). the project shall include a requirement for a transition space/building to support the phasing of the work per ahu/zone design. | Army | Oct 21, 2025 DoD 90d |
| W51AA124F0297 delivery order | Senate Builders & Construction Managers, Inc | $22.3M | Construction of building 72 at tobyhanna ARMY depot. demolition & removal of interior partitions and reconfigurations of the interior spaces. work includes site/civil, structural, architectural, mechanical, electrical, fire protection, and ... | Army | Feb 25, 2026 DoD 90d |
| W912CH25F0351 delivery order | General Dynamics Land Systems Inc | $22.3M | Year 5 delivery order to contract w56hzv-21-d-0085 | Army | May 27, 2026 DoD 90d |
| N4425525F0230 delivery order | Nova Group, Inc | $22.2M | The work includes the repair and improvement waterfront facilities including but not limited to fender system replacement, concrete rehabilitation, replacement of a floating dock, recoating of steel fixtures, and incidental related work. | Navy | Aug 29, 2025 DoD 90d |
| N4008526F0142 delivery order | Encon Desbuild JV 2 LLC | $22.2M | Repair beq as4212 | Navy | Dec 11, 2025 DoD 90d |
| W912QR22C0002 definitive contract | Korte -River City JV | $22.1M | Renovation of building 1600, headquarters for the air force mobility command at scott air force base, illinois. | Army | May 8, 2026 DoD 90d |
| N3943024F4209 delivery order | WSP USA Environment & Infrastructure Inc | $22.0M | Perform cleaning, inspection, and repairs as well as in-service inspections of pol tanks at defense fuel support point tsurumi, japan | Navy | Oct 17, 2024 DoD 90d |
| FA524024C0005 definitive contract | Fargo Pacific Inc | $21.9M | Renovate passenger terminal b-17002 and provide temporary facility for passenger terminal | Air Force | Jun 17, 2025 DoD 90d |
| N6945025F0056 delivery order | Emr, Inc | $21.9M | Hurricane sally repair supp. package 4, located at naval air station pensacola, fl. | Navy | Apr 16, 2025 DoD 90d |
| N3943024F4208 delivery order | WSP USA Environment & Infrastructure Inc | $21.8M | Clean, inspect and repair tanks at dfsp hakozaki, japan (hak tanks: 63, 64, 65, 117) | Navy | Sep 19, 2024 DoD 90d |
| N6247325F0387 delivery order | Nova Group, Inc | $21.6M | Contract number: n62473-23-d-1414 p-407 aircraft refueling facility on marine corps mountain warfare training center, bridgeport, california | Navy | Jan 23, 2026 DoD 90d |
| W912EP25C0005 definitive contract | The Dutra Group | $21.6M | Canaveral harbor maintenance dredging, brevard county, florida | Army | Apr 21, 2026 DoD 90d |
| 70FBR925D00000001 IDIQ contract | C Martin Co Inc | $21.6M | This single award idiq contract is for the maintenance of alternate temporary transportable housing units, maintenance of group sites, alternative sites, removal, disposal, and deactivation of atthus located on the island of maui in ... | Federal Emergency Management Agency | Sep 24, 2026 |
| N4008424F4766 delivery order | Mvl-Bromgrove JV LLC | $21.6M | Qc1117 - repair JP-5 & f-76 pipelines, f-200062, won1740434 | Navy | Sep 23, 2024 DoD 90d |
| W912EP26CA005 definitive contract | Great Lakes Dredge & Dock Co, LLC | $21.5M | Beach renourishment palm beach midtown palm beach county, florida | Army | May 19, 2026 DoD 90d |
| N0003025C1024 definitive contract | General Dynamics Mission Systems, Inc | $21.5M | Fy25 nirop capital maintenance | Navy | Apr 6, 2026 DoD 90d |
| W912DR24C0032 definitive contract | Marine Diving Solutions, LLC | $21.5M | Dam tunnel & warm water slide gates | Army | Oct 15, 2025 DoD 90d |
| N4008425C6502 definitive contract | Ohishi Construction Co LTD | $21.4M | Maintenance dredging - phase 3 - maebata and hario shima at u.s. fleet activities sasebo (cfas), japan (ep# 1624695). poc: masayo sonodaemail: masayo.sonoda.ln@us.NAVY.mil tel (local): 0956-50-2394tel (from states): 011-81-956-50-2394 | Navy | Mar 24, 2026 DoD 90d |
| W912HY26CA001 definitive contract | Callan Marine Limited | $21.4M | Maintenance dredging and advanced maintenance dredging of channel to port mansfield with beneficial use placement. | Army | Jan 29, 2026 DoD 90d |
| N6945025F0040 delivery order | P & S Construction Inc | $21.4M | Hurricane sally supplemental package 3 | Navy | Apr 17, 2025 DoD 90d |
| N6945018C0905 definitive contract | M a Mortenson Company | $21.4M | Igf::ot::igf clin 0001 base bid repair ehw 1 phase 2 nsb kings bay ga | Navy | Oct 14, 2025 DoD 90d |
| 70B01C24C00000062 definitive contract | Unalakleet-Integriward JV, LLC | $21.3M | Operations and maintenance services for the CBP advanced training center at harpers ferry, wv | U.S. Customs and Border Protection | Sep 21, 2026 |
| 70B01C24F00000659 delivery order | Tactical Infrastructure Maintenance Solutions LLC | $21.3M | Funded task order for unscheduled maintenance for idiq contract 70b01c21d00000023. | U.S. Customs and Border Protection | Aug 27, 2026 |
| FA527025CC002 definitive contract | Kyunan Co, LTD | $21.2M | Lxez201076 repair water lines around airfield, phase ii | Air Force | Oct 8, 2025 DoD 90d |
| N6247324F4562 delivery order | Peter Vander Werff Construction, Inc | $21.2M | X006 db construction macc to pe17122m repair beq 53450 cpen | Navy | Feb 12, 2026 DoD 90d |
| N6945025F1309 delivery order | Korte Construction Company | $21.1M | H1000 roof and hvac replacement | Navy | Sep 11, 2025 DoD 90d |
| W912BV24C0025 definitive contract | Tatitlek Universal Services Inc | $21.1M | Project includes design preparation, demolition, and new construction at b9001 cmxg autoclave. | Army | Mar 6, 2026 DoD 90d |
| W9126G23C0017 definitive contract | Guyco Inc | $21.1M | 9400 block hammerhead barracks renovations (design-build), fort cavazos, texas | Army | Sep 4, 2025 DoD 90d |
| W912DY25FA076 delivery order | Hospital Housekeeping Systems LLC | $20.9M | Travis nto | Army | Apr 21, 2026 DoD 90d |
| W912DY23F0224 delivery order | Facility Services Management, Inc | $20.9M | Travis air force base task order award | Army | Feb 17, 2026 DoD 90d |
| W912DY26CA002 definitive contract | Aptim Federal Services, LLC | $20.9M | This requirement is for maintenance and repair services to sustain fueling capability in support of federal petroleum facilities and petroleum systems. | Army | Mar 24, 2026 DoD 90d |
| N6945026F0125 delivery order | RQ Construction, LLC | $20.9M | Repair 12-inch cross-bay waterline at nsgb, cuba | Navy | Mar 16, 2026 DoD 90d |
| FA487725F0173 delivery order | JM Construction Services Inc | $20.7M | The contractor shall furnish all labor, equipment, appliance, and materials to perform all operations in connection with the convert mc-130j simulator iron/potff b4413 at davis-monthan afb,arizona, iaw the statement of work. | Air Force | May 15, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Sources
Award recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspendingAward recordUSAspending
Related
Barnard Construction Company, IncorporatedGreat Lakes Dredge & Dock Co, LLCWeston Solutions IncJ & J Maintenance IncTpc-Nan a Joint VentureKiewit-Alberici Siop Macc AjvNan IncRQ Construction, LLCDepartment of the ArmyDepartment of the NavyDepartment of the Air ForceU.S. Customs and Border ProtectionU.S. Coast GuardDefense Commissary AgencyWashington Headquarters ServicesU.S. Immigration and Customs Enforcement
Terminal: filters, alerts and CSV export for awards in this category.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial