AwardTape · Defense awards · Nova Group, Inc
Nova Group, Inc: $164.3M in DoD and DHS awards
Nova Group, Inc holds 32 DoD and DHS prime awards with $164.3M obligated Oct 10, 2023 to May 29, 2026. Largest category: Real property maintenance and repair at $94.2M; largest buyer: Department of the Navy at $91.4M.
| Obligated FY2024+ | $164.3M |
|---|---|
| Awards | 32 |
| FY2024 | $31.5M |
| FY2025 | $71.4M |
| FY2026 to date | $61.5M |
| Lifetime obligated on these awards | $403.5M |
| Parent company (as reported) | Nova Group, Inc |
| First and latest action | Oct 10, 2023 · May 29, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $94.2M | 20 awards | 57% |
| 2 | New construction | $70.2M | 12 awards | 43% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Navy | $91.4M | 25 awards | 56% |
| 2 | Department of the Army | $72.9M | 5 awards | 44% |
| 3 | Department of the Air Force | $3.0K | 2 awards | 0.0% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W911KB26CA012 definitive contract | $58.0M | This project will provide petroleum, oil, and lubricant (pol) infrastructure necessary to support the 5th generation f-22 fighter aircraft at (jber), alaska to ensure readiness to support global strike task force and project overall air ... | Army | New construction | Apr 16, 2026 DoD 90d |
| N4425525F0230 delivery order | $22.2M | The work includes the repair and improvement waterfront facilities including but not limited to fender system replacement, concrete rehabilitation, replacement of a floating dock, recoating of steel fixtures, and incidental related work. | Navy | Real property maintenance and repair | Aug 29, 2025 DoD 90d |
| N6247325F0387 delivery order | $21.6M | Contract number: n62473-23-d-1414 p-407 aircraft refueling facility on marine corps mountain warfare training center, bridgeport, california | Navy | Real property maintenance and repair | Jan 23, 2026 DoD 90d |
| N4425524F4296 delivery order | $18.8M | Contingent repairs to ammunition wharf, nmii | Navy | Real property maintenance and repair | Dec 13, 2024 DoD 90d |
| W9128F22C0030 definitive contract | $14.0M | Billy mitchell angb hydrant iii fueling system | Army | Real property maintenance and repair | Aug 11, 2025 DoD 90d |
| N6247325F4225 delivery order | $9.8M | Fuels (pol) macc ii | Navy | New construction | Apr 14, 2026 DoD 90d |
| N4425525F4007 delivery order | $5.7M | Repair support systems, marginal, b-7176 | Navy | Real property maintenance and repair | Dec 23, 2025 DoD 90d |
| N4425524F4172 delivery order | $5.3M | Msr #18313104_1765184 -- (ih-db_18313104) pw6 drainage upgrade (p | Navy | Real property maintenance and repair | May 4, 2026 DoD 90d |
| N4425525F0199 delivery order | $1.7M | This is a design-build contract that includes design and construction activities. the work includes replacement of the existing control systems for the pumpwell 6 drainage pumps at dry dock 6 and incidental related work. | Navy | Real property maintenance and repair | Mar 5, 2026 DoD 90d |
| N4425526F0088 delivery order | $1.7M | Repair conduit, marginal pier fixed fighting position, building 7129 at naval base kitsap, bangor, washington | Navy | Real property maintenance and repair | Mar 9, 2026 DoD 90d |
| N4425524F4043 delivery order | $1.4M | Design build marginal wharf shore power undervoltage relays, building 7176, naval base kitsap, bangor, washington | Navy | Real property maintenance and repair | Feb 26, 2025 DoD 90d |
| W9123823C0017 definitive contract | $894K | Hydrant outlets & aircraft refueling loo | Army | New construction | Jan 13, 2026 DoD 90d |
| N4425526F0155 delivery order | $795K | 57370196 repair feeders f611 and f615, building 7141 bangor | Navy | Real property maintenance and repair | May 15, 2026 DoD 90d |
| N4425525F4077 delivery order | $781K | Align trolly rails on naval base kitsap, silverdale, washington | Navy | Real property maintenance and repair | Feb 24, 2025 DoD 90d |
| N4425520C1002 definitive contract | $763K | P447 dry dock 4 and pier 3 modernization, nbk bremerton, psns, bremerton, wa | Navy | New construction | Jul 28, 2025 DoD 90d |
| N4425523F4222 delivery order | $720K | X004 replace delta pier switching station, b7035, bangor | Navy | New construction | Apr 16, 2026 DoD 90d |
| N4425522F4188 delivery order | $430K | "eo14042" (20383042) rebuild mdp3, b168 psns | Navy | Real property maintenance and repair | Mar 18, 2025 DoD 90d |
| N4425519F4442 delivery order | $351K | B9hxxx replace salt water system risers on pier 5 b/71 | Navy | Real property maintenance and repair | Sep 3, 2024 DoD 90d |
| N4425525F0272 delivery order | $150K | Remove marine growth and prepare surfaces of piles for new coatings or wraps. prime and paint or install protective wrap systems to surfaces of piles in bents 1-6 and pile 12:p. install new anodes on the three six total piles in pile bents ... | Navy | Real property maintenance and repair | Sep 23, 2025 DoD 90d |
| N4425524F4144 delivery order | $90K | Construct brow landing platforms for blocking vessels, bangor, washington. | Navy | Real property maintenance and repair | May 1, 2024 DoD 90d |
| W9128F20C0039 definitive contract | $55K | Ellsworth - milcon type iii hydrant fuel system. | Army | Real property maintenance and repair | Jan 23, 2024 DoD 90d |
| W9123821C0026 definitive contract | $40K | Construction of jet fuel storage tank at beale afb, california | Army | New construction | Feb 15, 2024 DoD 90d |
| N4425516C7005 definitive contract | $30K | Igf::ot::igf p983 land water interface located at nbk bangor, silverdale, wa. | Navy | New construction | Aug 5, 2025 DoD 90d |
| FA890325F0094 delivery order | $3.0K | Post award conference | Air Force | New construction | Mar 26, 2025 DoD 90d |
| FA890325D0048 IDIQ contract | $0 | Indefinite-delivery, indefinite quantity (idiq) multiple award task order contract (matoc) for worldwide department of defense (DOD) petroleum, oil and lubricant (pol) systems construction and repair services - fuels matoc | Air Force | New construction | May 20, 2025 DoD 90d |
| N4425516C7000 definitive contract | $0 | Igf::ot::igf rm09-2608 repair saltwater distribution system | Navy | Real property maintenance and repair | Mar 5, 2026 DoD 90d |
| N4425521D5005 IDIQ contract | $0 | Waterfront multi-award const. contract | Navy | Real property maintenance and repair | Feb 24, 2026 DoD 90d |
| N4425523F4319 delivery order | $0 | Replace cht/sod vent piping, building 7137, naval base kitsap, bangor | Navy | Real property maintenance and repair | Mar 1, 2024 DoD 90d |
| N6247323D1414 IDIQ contract | $0 | Macc/naics 237120/ur/fuels (pol) ii | Navy | New construction | May 19, 2026 DoD 90d |
| N6247822D4010 IDIQ contract | $0 | Design build/design bid build waterfront multiple award construction contract, various locations, state of hawaii and wake island | Navy | New construction | May 29, 2026 DoD 90d |
| N6247323F4778 delivery order | -$5.0K | Minimum guarantee - pol fuels macc ii | Navy | New construction | Feb 25, 2025 DoD 90d |
| N4425516C7002 definitive contract | -$898K | Igf::ot::igf p-431 drydock 6 mod.&util. imprv. | Navy | Real property maintenance and repair | Aug 20, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial