Results50 per page · sorted by obligated FY2024+
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| W9126G25FA025 delivery order | Black & Veatch - Gei JV | $4.8M | Architect-engineer (a-e) services required for the preliminary design of two (2) dam structures, stilling basin, channel, creek expansion, and an optional lock, for the central city project, upper trinity river, fort worth, texas. | Army | Architect-engineering services | Sep 29, 2025 DoD 90d |
| W9127S24F0133 delivery order | Stanley Consultants, Inc | $3.7M | Ae services to completion of final rfp | Army | Architect-engineering services | Apr 15, 2026 DoD 90d |
| W912P625CA012 definitive contract | Architectural Consulting Group of Chicago Inc | $2.4M | Kaukauna right abutment repair (krar) | Army | Architect-engineering services | May 28, 2026 DoD 90d |
| W912EF25CA008 definitive contract | Awalix, LLC | $2.4M | This project is to remove vegetation and rehabilitate the gaco cut-off levee segment on the green river near tukwila per the plans and specifications provided. | Army | Architect-engineering services | May 12, 2026 DoD 90d |
| W912P526FA027 delivery order | Kswa - Aei JV LLC | $1.3M | This requirement is for a firm fixed-price a-e services task order for the center hill embankment and dale hollow abutment, geophysical surveys. | Army | Architect-engineering services | May 18, 2026 DoD 90d |
| W911KB25F0020 delivery order | Tetra Tech Inc | $1.1M | Dta019 jarvis creek flood control project | Army | Architect-engineering services | Aug 27, 2025 DoD 90d |
| W912BV25F0008 delivery order | Gf-Gei Iepr Joint Venture | $793K | Independent cost validation in support of the whittier narrows dam safety modification project. | Army | Architect-engineering services | Feb 26, 2026 DoD 90d |
| N4008524F5780 delivery order | Advanced Engineering Consultants PLLC | $604K | Cnic lake greenwood dam risk analysis and concept design at nsa crane,indiana | Navy | Architect-engineering services | Sep 23, 2024 DoD 90d |
| N4008525F0666 delivery order | Advanced Engineering Consultants PLLC | $505K | Provide design and engineering services to complete a concept design for increasing capacity of greenwood dam to 100% of the probable maximum flood (pmf) | Navy | Architect-engineering services | Aug 21, 2025 DoD 90d |
| W912PM25FA003 delivery order | Athena Engineering & Environmental, LLC | $87K | Safety assurance review for the philpott dam anchors, inclinometers, and instrumentation designs. | Army | Architect-engineering services | Jun 2, 2026 DoD 90d |
| W912EK25FA010 delivery order | Fickett Structural Solutions Inc | $21K | Quality assurance inspections during the fabrication, painting and supply of a 3 wicket bulkhead to be delivered to the illinois waterway project office | Army | Architect-engineering services | Dec 9, 2025 DoD 90d |
| W912P526FA001 delivery order | Kswa - Aei JV LLC | $18K | Watts bar soil sample lab testing | Army | Architect-engineering services | Oct 2, 2025 DoD 90d |
| W912BU22C0051 definitive contract | Uh Services Group LLC | $0 | Beltzville concrete repair | Army | Architect-engineering services | Sep 25, 2025 DoD 90d |
| W9126G21F0385 delivery order | Fni Cowi & CDM Smith JV | -$4.4M | Dfe lamar levee project (base) | Army | Architect-engineering services | May 10, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters by company, agency, category and date, with CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial