AwardTape · Defense awards · Search
Award search results
Page 7: 350 awards and more, largest obligated first.
Results50 per page · sorted by obligated FY2024+
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| W9126G22F0085 delivery order | LGC Global, Inc | $1.9M | Design and construction charlie pump station | Army | New construction | Mar 18, 2026 DoD 90d |
| W9128F24F0226 delivery order | Bristol Construction Services, LLC | $1.9M | Demolish hangar 104 | Army | New construction | Apr 28, 2026 DoD 90d |
| W912DQ24C4040 definitive contract | Highpoint Partners LLC | $1.9M | Loc-b improvements ta-250 | Army | New construction | Aug 6, 2025 DoD 90d |
| W911XK25CA032 definitive contract | Michels Construction, Inc | $1.8M | Keweenaw upper breakwater repairs | Army | New construction | Sep 2, 2025 DoD 90d |
| W9123724F0285 delivery order | Massillon Construction and Supply LLC | $1.8M | The general description of the work is to furnish all materials, equipment, labor, layouts of work features, and supervision needed to accomplish work related to the stp and waterline replacement at frl. | Army | New construction | Sep 8, 2025 DoD 90d |
| W9123823C0006 definitive contract | Granite Construction Company | $1.8M | Hcr rods replacement | Army | New construction | May 27, 2026 DoD 90d |
| W912P426FA013 delivery order | Morrish-Wallace Construction, Inc | $1.8M | W81eu660992416 | Army | New construction | Apr 28, 2026 DoD 90d |
| W912EQ25FA028 delivery order | Innovative Performance Construction Co LLC | $1.8M | The work consists of furnishing all plant, labor, and materials and any incidental related work according to the plans and specifications for repairing a total of 9 levee slides throughout new madrid county. | Army | New construction | Feb 19, 2026 DoD 90d |
| W912P725CA019 definitive contract | S.e.a Construction LLC | $1.7M | 8(a) negotiated santa cruz jetty repairs estimated cost range is between $1,000,000 and $5,000,000. | Army | New construction | Oct 2, 2025 DoD 90d |
| W912P924C0014 definitive contract | Youngs General Contracting Inc | $1.7M | Wood river pump station modifications | Army | New construction | Jun 1, 2026 DoD 90d |
| W912BV25C0013 definitive contract | Ses Constructors LLC | $1.7M | Repair of erosion at charles page floodwall | Army | New construction | Apr 9, 2026 DoD 90d |
| W912DW25C0013 definitive contract | Duwamish Services LLC | $1.7M | Fy25 everett hydraulic dredging, everett - washington | Army | New construction | May 1, 2026 DoD 90d |
| W912P425FA031 delivery order | Marco Federal Services LLC | $1.7M | Presque isle beach nourishment | Army | New construction | Nov 13, 2025 DoD 90d |
| W912EE24C0018 definitive contract | Istre Engineering Services, Inc | $1.7M | Construct five (5) riser pipe grade control structures for panola county, ms, mdhp, rp-17-03, fc/mr&t, yazoo river basin, long creek watershed. | Army | New construction | Nov 13, 2025 DoD 90d |
| W912P726CA002 definitive contract | S.e.a Construction LLC | $1.7M | 8(a) negotiated santa cruz jetty repairsestimated cost range is between $1,000,000 and $5,000,000. | Army | New construction | Mar 23, 2026 DoD 90d |
| FA542225C0018 definitive contract | Prime Projects International (construction ) Limited | $1.7M | In accordance with the attached sow, build 7-lane firing range, chabelley airfield, djibouti. incl: demo, apron (115x50m), berm, concrete lanes, 14ft bay, rso building. contractor responsible for design, materials, ufc compliance, permits, ... | Air Force | New construction | Oct 21, 2025 DoD 90d |
| W912EE24C0014 definitive contract | Eclipse Companies, LLC | $1.7M | Mdhp rp-18-03, construction of five riser pipe grade control structures. | Army | New construction | Nov 13, 2025 DoD 90d |
| W9123725FA121 delivery order | Brannon Contracting & Maintenance Services, LLC | $1.6M | The contractor shall furnish all materials, equipment, labor, layouts of work features, and supervision needed to accomplish work related to the toe drain replacement. | Army | New construction | Sep 18, 2025 DoD 90d |
| W912P624C0013 definitive contract | Syte Corporation | $1.6M | Gary airport sanitary sewer improvements | Army | New construction | Jul 7, 2025 DoD 90d |
| N4008025F1133 delivery order | Aleut Construction LLC | $1.6M | Contract n4008022d1114 to#n40017325pr01644 cbd: repair erosion west field north fence, pw 6405 | Navy | New construction | Mar 2, 2026 DoD 90d |
| W9123724F0185 delivery order | Amherst Madison, Inc | $1.6M | Big sandy river dredge under regional dredging matoc huntington district usace | Army | New construction | Dec 4, 2024 DoD 90d |
| W912P826CA015 definitive contract | Vast Industries, LLC | $1.6M | Sela 72.1c general de gaulle greenspace phase 1 | Army | New construction | Apr 28, 2026 DoD 90d |
| N6247326F0405 delivery order | Cape-Weston Jv3 LLC | $1.6M | N6274222d1800 x018 non time-critical removal action at installation restoration site 19 at marine corps air station miramar san diego, ca | Navy | New construction | Jun 4, 2026 DoD 90d |
| W912P425CA009 definitive contract | Geo Gradel Co | $1.6M | The ashtabula harbor maintenance dredging project consists of, but not limited to, furnishing all labor, materials, and equipment necessary to dredge the federal channel of ashtabula, ohio on lake erie, as more specifically described ... | Army | New construction | Jul 24, 2025 DoD 90d |
| N4019224F4231 delivery order | Modern International Inc | $1.6M | Won 1768417, fy24 aafb tarague conservation ungulate fence 3 | Navy | New construction | Aug 30, 2024 DoD 90d |
| FA542225C0021 definitive contract | Gecoba | $1.6M | Lsa atfp perimeter upgrade | Air Force | New construction | Oct 20, 2025 DoD 90d |
| W912P823C0059 definitive contract | Five-S Group, L.l.c | $1.6M | Channel riprap r-90 | Army | New construction | Jun 4, 2026 DoD 90d |
| W912P624C0004 definitive contract | Grimmer Construction Inc | $1.5M | Portage phase ii | Army | New construction | Mar 18, 2025 DoD 90d |
| 70LCHE26FPFB00058 delivery order | Belt Built Contracting, LLC | $1.5M | Various asphalt repairs at fletc cheltenham md. | Federal Law Enforcement Training Center | New construction | Sep 23, 2026 |
| N3943017F4120 delivery order | Gilbane Federal | $1.5M | Igf::ot::igf cir sasa valley | Navy | New construction | Jun 7, 2024 DoD 90d |
| W912DS21C0019 definitive contract | Intercontinental Construction Contracting Inc | $1.5M | St. albans columbarium | Army | New construction | Apr 16, 2026 DoD 90d |
| W912P825F0099 delivery order | Pine Bluff Sand and Gravel Company | $1.5M | Stone placement task order # 4 | Army | New construction | Sep 22, 2025 DoD 90d |
| W912P624C0007 definitive contract | Schwartz Excavating Inc | $1.4M | Repair of sheetpile at levee | Army | New construction | Mar 5, 2024 DoD 90d |
| W912P924C0004 definitive contract | Kamex, Inc | $1.4M | A6330-fy24 umrr crains phase 2 construct | Army | New construction | Nov 29, 2024 DoD 90d |
| W912EQ24C0004 definitive contract | Graylee Construction LLC | $1.4M | Dd17 inlet channel cleanout | Army | New construction | Nov 20, 2024 DoD 90d |
| FA480325C0022 definitive contract | Associates Roofing & Construction Inc | $1.4M | Construction contract to establish (2) remote radar threat emitter site and (1) personnel trailer at georgetown airport on the leased locations per attachment 1, statement of work. | Air Force | New construction | Feb 24, 2026 DoD 90d |
| W9123724C0007 definitive contract | Mi-De-Con Inc | $1.4M | Contract-main office & intake structure security rehab | Army | New construction | Apr 2, 2026 DoD 90d |
| N4019226F0059 delivery order | Techni-Con, Inc | $1.4M | This is a design-build (db) project under the small business db multiple award construction contract intended to provide and install a security fence, approximately 3,500 l.f. long, along the roads and bunker clusters, zone 5, naval ... | Navy | New construction | Mar 6, 2026 DoD 90d |
| N0017825C2204 definitive contract | Bowhead Base Operations LLC | $1.4M | Explosive experimental area (eea) boring, and fiber installation, as well as conduit repair at dahlgren, va. | Navy | New construction | Feb 13, 2026 DoD 90d |
| H9227624C0001 definitive contract | Peg Services Sal Offshore | $1.4M | Construct skills house | U.S. Special Operations Command | New construction | Feb 14, 2024 DoD 90d |
| W912QR19C0039 definitive contract | P & R JV | $1.3M | Construction of digital air/ ground integration range, ft. knox, ky. | Army | New construction | Sep 2, 2025 DoD 90d |
| W9126G25F0246 delivery order | Sedona-Nasco Jv2, LLC | $1.3M | B30015a tactical vehicle maintenance structure | Army | New construction | Oct 27, 2025 DoD 90d |
| W9126G25F0247 delivery order | Sedona-Nasco Jv2, LLC | $1.3M | B30033a tactical vehicle maintenance structure | Army | New construction | Oct 27, 2025 DoD 90d |
| N6274223F9935 delivery order | Black Construction-Tutor Perini JV | $1.3M | Fy23 p-187 brown tree snake (bts) exclusion barrier south, us navsuppact mcb guam | Navy | New construction | Mar 14, 2026 DoD 90d |
| W912HV23C0013 definitive contract | Kashiwabara Corporation | $1.3M | Hardened transportable terminal-mda (htt-m) facility infrastructure, shariki, japan | Army | New construction | Jun 5, 2025 DoD 90d |
| N3319126F0023 delivery order | Impresa Pizzarotti & C S.p.a | $1.3M | Design-bid-build project for the restoration and stabilization of the embankment through the use of mechanically stabilized earth structures, to ensure long-term slope stability, and maintenance of the existing yard to ensure surface water ... | Navy | New construction | Jan 13, 2026 DoD 90d |
| W9124724F0181 delivery order | Chavis' Inc | $1.3M | Fz-20029-17 repair cwwf retention pond | Army | New construction | May 6, 2026 DoD 90d |
| N6247325F0456 delivery order | Souza Construction, Inc | $1.3M | Replace generator set 1, building 001, at naval air station lemoore, ca | Navy | New construction | Aug 13, 2025 DoD 90d |
| N6247325F4280 delivery order | Cape-Weston Jv3 LLC | $1.3M | Clin 0001 | Navy | New construction | Apr 3, 2025 DoD 90d |
| W9123725FA126 delivery order | Geiger Brothers, Inc | $1.3M | W81f8e52599057 | Army | New construction | Sep 24, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters by company, agency, category and date, with CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial