AwardTape · Defense awards · Search
Award search results
Page 2: 100 awards and more, largest obligated first.
Results50 per page · sorted by obligated FY2024+
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| N6945024P0002 purchase order | TW Professional Solutions LLC | $134K | Nask b4728 fiber optic installation | Navy | Installation of equipment | Jan 11, 2024 DoD 90d |
| FA520525P0011 purchase order | Sanwa Engineering Co.,ltd | $128K | Ops-11: communication infrastructure osp/isp installation on misawa ab, japan | Air Force | Installation of equipment | Aug 25, 2025 DoD 90d |
| FA820125F0289 BPA call | Shofar Communications LLC | $124K | Network switch equipment upgrade for buildings 1218 and 1226 | Air Force | Installation of equipment | Aug 20, 2025 DoD 90d |
| FA820125F0115 BPA call | Sorenson Installations LLC | $109K | Wifi gen6 phase 2 installation services, iaw sow | Air Force | Installation of equipment | Aug 18, 2025 DoD 90d |
| FA302225P0029 purchase order | Southpaw Communications, Inc | $104K | Columbus afb has a requirement for the contractor to engineer, furnish, install and test the upgrade of wiring infrastructure to cat-6 for building 1030 iaw with the respective statement of work. | Air Force | Installation of equipment | Sep 25, 2025 DoD 90d |
| FA820125F0396 BPA call | Sorenson Installations LLC | $97K | Athena network expansion bldg. 505, all work in accordance with the soo. | Air Force | Installation of equipment | Mar 16, 2026 DoD 90d |
| W9126G25FA047 delivery order | Govconnection Inc | $96K | Custom hardware service bundle includes all hardware: switching routing cables and av racks in-house engineering onsite implementation configuration systems programming customer coordination communication scheduling and design documentation | Army | Installation of equipment | Sep 4, 2025 DoD 90d |
| FA820125F0079 BPA call | Sorenson Installations LLC | $95K | Communication infrastructure installation b843 hill afb industrial network/athena expansion, premise wiring, backbone fiber cabling, and equipment installation, iaw sow. | Air Force | Installation of equipment | May 29, 2026 DoD 90d |
| 70FBR624P00000083 purchase order | The Blackstar Companies, LLC | $94K | The purpose of this procurement is to replace the frc main circuit breaker which failed during a power surge. the circuit breaker currently in use will be removed, reconditioned, and returned for use as a backup. | Federal Emergency Management Agency | Installation of equipment | Dec 12, 2024 |
| N6247323F4904 delivery order | Speedway Orion JV | $92K | X006 rfp for phibcor 337 replace fire protection system | Navy | Installation of equipment | Mar 31, 2026 DoD 90d |
| FA520925P0074 purchase order | Mitomo Co, LTD | $91K | Premise wiring for building 1505a | Air Force | Installation of equipment | Sep 9, 2025 DoD 90d |
| N3943022F4469 delivery order | Miquin, L.l.c | $89K | Critical power services - 60 mos. | Navy | Installation of equipment | Mar 2, 2026 DoD 90d |
| W50S7X25PA002 purchase order | Jim Jam, Inc | $89K | Bldg 16 hmi repair | Army | Installation of equipment | Mar 3, 2025 DoD 90d |
| W15QKN25CA028 definitive contract | Bamajack, LLC | $89K | No description on the record | Army | Installation of equipment | Jun 27, 2025 DoD 90d |
| FA520924P0115 purchase order | American Engineering Corporation | $80K | Fiber optic cable plant upgrade adr catm, 374 cs/scxp, yokota air base, japan | Air Force | Installation of equipment | May 9, 2025 DoD 90d |
| FA302224P0037 purchase order | Sunrise Network Solutions Inc | $73K | Engineer, furnish, install and test (efi and t) 12-strand single mode (sm) fiber optic cable (foc) from information transfer building (itb) 230 to bldg. 208 at columbus afb, ms. | Air Force | Installation of equipment | Oct 16, 2024 DoD 90d |
| 70Z03626PCHAR0027 purchase order | Diesel Power Solutions LLC | $68K | Removal and disposal of the current emergency generator at air sta savannah bldg 830, and the automatic transfer switch. contractor shall remove old unit, install new diesel generator and secure in place. work to be completed iaw the sow. | U.S. Coast Guard | Installation of equipment | Aug 27, 2026 |
| W519TC24F2052 BPA call | Intersteel Group, LLC | $67K | Lps testing | Army | Installation of equipment | Nov 8, 2023 DoD 90d |
| W519TC25F2036 BPA call | Hepburn Consultants Inc | $66K | Generator r2 truck gate | Army | Installation of equipment | Oct 31, 2024 DoD 90d |
| M6785424P0511 purchase order | Eastern Shawnee Professional Services, LLC | $64K | Tv installation and associated services. | Navy | Installation of equipment | Sep 23, 2024 DoD 90d |
| W912DW25C0026 definitive contract | Collrich, LLC | $61K | Eoc improvement prep activities | Army | Installation of equipment | Aug 19, 2025 DoD 90d |
| FA302225P0023 purchase order | DND Solutions LLC | $60K | Contractor to engineer, furnish, install, and test (efi and t) the upgrade of premise wiring infrastructure to cat-6 for the buildings 218 220 .the contractor shall also be required to remove existing outdated premise wiring in this ... | Air Force | Installation of equipment | Oct 30, 2025 DoD 90d |
| FA302025P0050 purchase order | Potawatomi Training LLC | $59K | Fiber installed at wind creek | Air Force | Installation of equipment | Jun 3, 2025 DoD 90d |
| N3943022F4462 delivery order | Miquin, L.l.c | $59K | Emergency distribution system | Navy | Installation of equipment | Mar 3, 2026 DoD 90d |
| FA520925P0094 purchase order | Mitomo Co, LTD | $58K | Installation of premise wiring at building 1504a on yokota ab | Air Force | Installation of equipment | Sep 9, 2025 DoD 90d |
| FA302224P0035 purchase order | Sunrise Network Solutions Inc | $55K | Engineer, furnish, install and test (efiandt) 12-strand single mode (sm) fiber optic cable (foc) from b151 to hh 510b (b152) and 1x4 inch schedule 40 duct with pull box (pb) at columbus afb, ms. | Air Force | Installation of equipment | Nov 12, 2024 DoD 90d |
| FA486125P0107 purchase order | Wilbur L Anderson, Inc | $55K | The 548th combat training squadron requires the installation of mpu5 antennas on 4 permanent towers in the fort johnson training area. contractor shall provide all labor, material, equipment, management, supervision, coordination, and ... | Air Force | Installation of equipment | Oct 20, 2025 DoD 90d |
| 70FBR124P00000055 purchase order | Brown Point Facility Management Solutions, LLC | $53K | Install an emergency power off system in both IT rooms and upgrade the rack ups system and switches at the federal regional center, maynard ma. | Federal Emergency Management Agency | Installation of equipment | Oct 3, 2024 |
| 70B01C25C00000025 definitive contract | 2r Construction LLC | $49K | Replace gate intercom system, blaine, wa | U.S. Customs and Border Protection | Installation of equipment | May 26, 2025 |
| FA520924P0102 purchase order | Tecc Corporation | $47K | The contractor shall provide all items and services necessary except that specifically identified as government furnished in section 12 to install cat 6 at yokota air force base, japan - (b820). | Air Force | Installation of equipment | Sep 10, 2024 DoD 90d |
| N6470925P0053 purchase order | Pergravis Mission Critical Construction, LLC | $47K | Ups replacement for organization spk10-swflant operations fy: 2025, ams: n64709-25-simacq-spk10-0011 | Navy | Installation of equipment | Nov 26, 2025 DoD 90d |
| N5005424P0193 purchase order | Jo-Kell Inc | $47K | Uss mason esg611436-2 fn 0054lr - recpt berth sku sym 232.1 power wiring, 10 ft 7xw-3 cable cord esg611436-2xlr -fn 0054xlr recpt berth sku, sym 232.1 power wiring, 15 ft 7xw-3 cable cord | Navy | Installation of equipment | Sep 12, 2024 DoD 90d |
| FA251725FG031 BPA call | Tec-Exchange, Inc | $47K | It and telecom-telecommunications and transmission | Air Force | Installation of equipment | Oct 1, 2024 DoD 90d |
| 70Z02926PGALV0105 purchase order | Christway Construction Company, LLC | $43K | Replacing emergency generator at vts texas city | U.S. Coast Guard | Installation of equipment | Sep 16, 2026 |
| FA820125F0358 BPA call | Sorenson Installations LLC | $43K | Athena network expansion bldg. 509 iaw soo. | Air Force | Installation of equipment | Dec 17, 2025 DoD 90d |
| FA820125F0237 BPA call | Shofar Communications LLC | $39K | Communication infrastructure installation in building 2700t, all work performed in accordance with the soo. | Air Force | Installation of equipment | Jul 17, 2025 DoD 90d |
| 70FBR124P00000053 purchase order | Federon Procurement Solutions | $37K | Electrical services to install electrical panel in the doghouse and run a conduit from the doghouse to the parking lot lights at the FEMA r1 frc | Federal Emergency Management Agency | Installation of equipment | Oct 12, 2024 |
| FA302225P0019 purchase order | JL Enterprises, LLC | $37K | This requirement removes existing premise wiring in buildings 1114 and 348, and replaces IT with plenum-rated cat-6 compliant cables. | Air Force | Installation of equipment | Sep 25, 2025 DoD 90d |
| W912WJ24P0172 purchase order | Stacie Lynn Bassett | $35K | Generator installation, townshend lake, townshend, vt | Army | Installation of equipment | Sep 23, 2024 DoD 90d |
| H9227824F0007 delivery order | M C Dean, Inc | $35K | Bldg 2302 3rd floor tr remediation | U.S. Special Operations Command | Installation of equipment | Aug 6, 2024 DoD 90d |
| FA302224P0038 purchase order | Adept Patriot Services LLC | $35K | Requirement to engineer, furnish, install, and test 12-strand single mode fiber optic cable from information transfer building (itb) 230 to b236n iaw with the sow. | Air Force | Installation of equipment | Jan 27, 2025 DoD 90d |
| N3943023F4699 delivery order | Miquin, L.l.c | $34K | Uninterruptible power supply replacement and 2n configuration building 1942 ncts, yokosuka japan. | Navy | Installation of equipment | Aug 21, 2025 DoD 90d |
| FA820125F0350 BPA call | E-Logic, Inc | $33K | Athena network expansion bldg. 205 iaw soo | Air Force | Installation of equipment | Dec 18, 2025 DoD 90d |
| FA820125F0378 BPA call | Shofar Communications LLC | $32K | Infrastructure installation in building 1515 to 1214, all work in accordance with soo. | Air Force | Installation of equipment | Feb 17, 2026 DoD 90d |
| FA486123C0031 definitive contract | Miwok Construction LLC | $32K | Construct allied support for 99ces eod weapon storage | Air Force | Installation of equipment | Nov 6, 2024 DoD 90d |
| W90VN724FA029 delivery order | Seong Bo Const.ind.co.,ltd | $32K | Mlwr24-1035, support construction for us ARMY fran tower, kunsan ab | Army | Installation of equipment | Aug 23, 2024 DoD 90d |
| H9227824F0002 delivery order | M C Dean, Inc | $31K | Defense red switch network installation in soceur hq | U.S. Special Operations Command | Installation of equipment | Jan 17, 2024 DoD 90d |
| FA520924P0075 purchase order | Grooove Co, LTD | $30K | Install outside plant (osp) single mode (sm) fiber optic cable at yokota air force base, japan. | Air Force | Installation of equipment | Aug 7, 2024 DoD 90d |
| FA820125F0067 BPA call | Sorenson Installations LLC | $30K | Communication infrastructure installation uttr to trailer from bldg. 4-0021 iaw sow. | Air Force | Installation of equipment | Feb 10, 2025 DoD 90d |
| FA486124P0073 purchase order | Tele/data Contractors, Inc | $29K | M7 long range thermal camera install | Air Force | Installation of equipment | May 13, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters by company, agency, category and date, with CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial