AwardTape · Defense awards · Search
Award search results
Page 14: 700 awards and more, largest obligated first.
Results50 per page · sorted by obligated FY2024+
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| N6247325F0653 delivery order | South Bay Edc Inc | $2.0M | Pa5 e-2d electrical infrastructure in accordance with the attached scope of work (parts 2-6) and wage determination in section j. | Navy | Real property maintenance and repair | Oct 8, 2025 DoD 90d |
| W9124822F0198 delivery order | Intec Group LLC | $2.0M | Design-build renovation barrack b-3730 | Army | Real property maintenance and repair | Jan 27, 2025 DoD 90d |
| W9124825FA179 delivery order | Intec Group LLC | $2.0M | Renovate company operation facility (cof), building 3672. | Army | Real property maintenance and repair | Mar 17, 2026 DoD 90d |
| W9124826FA060 delivery order | Gmh-C JV, LLC | $2.0M | Conduct inspection, cleaning, demolition, and installation of various systems and components within the facility. | Army | Real property maintenance and repair | Apr 27, 2026 DoD 90d |
| W9128A23F0052 delivery order | Elite Pacific Construction Inc | $2.0M | Fy23 oma bradshaw ARMY airfield (baaf) repair pavement and electric, pohakuloa training area, island of hawaii, hawaii | Army | Real property maintenance and repair | May 28, 2025 DoD 90d |
| N6945024C0077 definitive contract | Mia General Contracting LLC | $2.0M | Re-roof bldg's 1415/1416/1430 at nas whiting field, milton, fl. | Navy | Real property maintenance and repair | Dec 29, 2025 DoD 90d |
| W912GB25F0148 delivery order | Porr Government Services Italy SRL | $2.0M | Sofa: haz waste and debris removal joc to | Army | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| FA481926C0006 definitive contract | PB Infrastructure General Partnership | $2.0M | Demolition and replacement of the building 220 airfield control tower and repair of heating and air conditioning equipment | Air Force | Real property maintenance and repair | May 13, 2026 DoD 90d |
| FA282324C0013 definitive contract | JBW Group LLC | $2.0M | Replace existing overhead bridge crane building 453 | Air Force | Real property maintenance and repair | Mar 2, 2026 DoD 90d |
| FA570225F0095 delivery order | Astrea Group for Trading and Contracting | $2.0M | Al udeid air base requires the full repair of the exterior enclosure, hvac system, and fire protection system for dorm a9. living quarters for troops assigned to the base to fix the exterior enclosure, hvac system, and fire protection ... | Air Force | Real property maintenance and repair | Sep 18, 2025 DoD 90d |
| N4008025F1306 delivery order | Sustainable Building Solutions, LLC | $2.0M | B2780 replace roof | Navy | Real property maintenance and repair | Sep 23, 2025 DoD 90d |
| FA487725F0249 delivery order | Olgoonik General, LLC | $2.0M | Repair of b1634 492nd sow wrm and 355th mdg | Air Force | Real property maintenance and repair | Jul 31, 2025 DoD 90d |
| W9124826FA057 delivery order | Gmh-C JV, LLC | $2.0M | This project outlines the requirements for the inspection, cleaning, demolition, and installation of various systems and components within the facility. | Army | Real property maintenance and repair | May 12, 2026 DoD 90d |
| FA282325C0029 definitive contract | E.k Management, L.l.c | $2.0M | Project number: ftfa18jr04 repair boundary fence. | Air Force | Real property maintenance and repair | Sep 26, 2025 DoD 90d |
| W911SA24F2004 delivery order | Ac Lopez Construction Inc | $2.0M | Ca012, constuct hazmat and storage bldgs | Army | Real property maintenance and repair | Nov 30, 2023 DoD 90d |
| FA487725F0207 delivery order | Lira Ec JV LLC | $2.0M | A. the multiple award construction contract is designed to provide a flexible, competitive, and responsive contractual capability to perform design-build and bid-build construction work at davis-monthan afb, az and luke afb, az. | Air Force | Real property maintenance and repair | Jun 27, 2025 DoD 90d |
| 70Z08326FCLEV0042 delivery order | Oneill Contractors Inc | $2.0M | D/b repair fuel farm grand haven iaw paragraph 2(d) implementing the president's "department of government efficiency" cost efficiency initiative feb 26, 2025. | U.S. Coast Guard | Real property maintenance and repair | Jul 30, 2026 |
| N0017425F0350 delivery order | Kekolu Contracting, LLC | $2.0M | B2015 replace roof | Navy | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| N0017425F0349 delivery order | Kekolu Contracting, LLC | $2.0M | B2112 and b2155 renovations | Navy | Real property maintenance and repair | Jan 20, 2026 DoD 90d |
| FA860125F0145 delivery order | A & H-Ambica JV LLC | $2.0M | Macc project 23-0815, repair to replace chiller 3, f20145 | Air Force | Real property maintenance and repair | Apr 20, 2026 DoD 90d |
| W90VN825FA043 delivery order | Sam a Construction Co, LTD | $2.0M | Repair deteriorated fire alarm control panels of various building at rlfc and camp casey | Army | Real property maintenance and repair | May 7, 2026 DoD 90d |
| W912PL24F0092 delivery order | MX Construction, Inc | $1.9M | Clin 0001 fy24 nswc b575 electrical mode | Army | Real property maintenance and repair | Mar 30, 2026 DoD 90d |
| FA524024F0053 delivery order | Aleut Construction LLC | $1.9M | Saber idiq for guam | Air Force | Real property maintenance and repair | Jun 10, 2024 DoD 90d |
| FA700026F0045 delivery order | Native American Services Corp | $1.9M | Refurbish/repair 8 elevators to improve interior appearance and increase reliability and operability | Air Force | Real property maintenance and repair | Mar 6, 2026 DoD 90d |
| 70Z08325FCLEV0013 delivery order | Turner Strategic Technologies, LLC | $1.9M | Replace east end fire main piping in accordance with paragraph 2(d) implementing the president's "department of government efficiency" cost efficiency initiative feb 26, 2025 | U.S. Coast Guard | Real property maintenance and repair | Jun 23, 2026 |
| FA820124F0125 delivery order | Kekolu-Rio Vista Joint Venture, LLC | $1.9M | Provide hill afb with a streamlined avenue to execute simplified acquisition of base engineering requirements (saber), which include services such as demolition, plumbing, electrical, mechanical, repairs, maintenance, landscaping, ... | Air Force | Real property maintenance and repair | May 30, 2024 DoD 90d |
| FA440725F0159 delivery order | RB Construction Company | $1.9M | Repair, atfp upgrades replacement of vehicle access gates, bollards, ustc; b1900 | Air Force | Real property maintenance and repair | Sep 25, 2025 DoD 90d |
| N4008526F0581 delivery order | TST Tactical Defense Solutions, Inc | $1.9M | Replace partial roof, gutters, soffit boards and interior common area finishes, bldg 508, dam neck annex | Navy | Real property maintenance and repair | Mar 12, 2026 DoD 90d |
| FA461326F0027 delivery order | Native American Services Corp | $1.9M | Provide site preparation and construction of a relocatable facility for building 1502. | Air Force | Real property maintenance and repair | Mar 19, 2026 DoD 90d |
| N3319124F4416 delivery order | Wolff & Muller Government Services Italia S.r.l | $1.9M | Modernize nas ii fire water system | Navy | Real property maintenance and repair | Sep 30, 2024 DoD 90d |
| W9126G26FA172 delivery order | Sedona-Nasco Jv2, LLC | $1.9M | Bldg 56393 construct new building iaw statement of work (sow) rev dated 21 april 2026 | Army | Real property maintenance and repair | Jun 2, 2026 DoD 90d |
| W911SA26FA145 delivery order | Dewatto Bay Services LLC | $1.9M | The intent of this project is to restore the operational integrity, safety, and serviceability of building 25109 through targeted interior repair, remediation, and restoration activities. | Army | Real property maintenance and repair | Apr 22, 2026 DoD 90d |
| FA461022C0001 definitive contract | Koman Integrated Solutions, LLC | $1.9M | Replace overhead distribution line circuit b6 on vandenberg space force base, california | Air Force | Real property maintenance and repair | Sep 25, 2025 DoD 90d |
| W9126G26FA158 delivery order | Sedona-Nasco Jv2, LLC | $1.9M | Construct new building bldg 56509 iaw statement of work (sow) rev dated 21 april 2026 | Army | Real property maintenance and repair | Jun 4, 2026 DoD 90d |
| FA448624F0022 delivery order | Andre Toste & Joao Paulino, Lda | $1.9M | The contractor shall supply all plant, labor, equipment, supervision, and specified materials to perform all operations required to repair contingency quarters t-131. please see attached technical documents for details. | Air Force | Real property maintenance and repair | Apr 20, 2026 DoD 90d |
| FA440725F0079 delivery order | Litteken Construction Company, LLC | $1.9M | This project seeks to design and install an m30 p1 rated anti-vehicle barrier system on the north and west sides of the facility to sustain required facility standoff of 104 feet around the facility. | Air Force | Real property maintenance and repair | Aug 6, 2025 DoD 90d |
| FA251724F0216 delivery order | G2i Jbi LLC | $1.9M | Bldg 2027 - otti secure space rm 209, 222, 223 | Air Force | Real property maintenance and repair | May 20, 2026 DoD 90d |
| FA820126F0142 delivery order | Kekolu-Rio Vista Joint Venture, LLC | $1.9M | Bldg. 503 construct equipment isolation enclosure | Air Force | Real property maintenance and repair | Apr 14, 2026 DoD 90d |
| N4008426F4162 delivery order | Ohishi Construction Co LTD | $1.9M | Refurbish dog kennels in bldg. 843 and construct isolation kennel nearby bldg. 843 at the sasebo ammo supply point, u.s. fleet activities, sasebo, japan (ep#1781110) | Navy | Real property maintenance and repair | Mar 5, 2026 DoD 90d |
| FA252124F0128 delivery order | De La Hoz Builders, Inc | $1.9M | Repair chillers & air handler units, cif, ascension auxiliary airfield, south atlantic ocean | Air Force | Real property maintenance and repair | Feb 13, 2026 DoD 90d |
| FA440725F0180 delivery order | Hof Construction Inc | $1.9M | This multiple award idiq supports museum/exhibit design, fabrication, transportation, installation, and programming (where applicable) on scott afb | Air Force | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| W911SA26FA184 delivery order | Pure Enviro-Management, LLC | $1.9M | Northwest joc | Army | Real property maintenance and repair | Jun 5, 2026 DoD 90d |
| W9124824F4003 delivery order | Gmh-C JV, LLC | $1.9M | Replace hot water distro, fan coil units | Army | Real property maintenance and repair | Aug 6, 2025 DoD 90d |
| N6945025F1415 delivery order | Core Engineering & Construction, Inc | $1.9M | Repair of building 1771 | Navy | Real property maintenance and repair | Sep 26, 2025 DoD 90d |
| 70Z08326FCLEV0040 delivery order | Saf Inc | $1.9M | Design/build replace oil-water separator, airsta detroit in accordance with paragraph 2(d) implementing the president's "department of government efficiency" cost efficiency initiative feb 26, 2025. | U.S. Coast Guard | Real property maintenance and repair | Jul 1, 2026 |
| FA524025F0046 delivery order | Serrano Construction and Development Corp | $1.9M | Typhoon mawar phase 2 and 3 lrs grouping projects aafb, guam | Air Force | Real property maintenance and repair | Mar 5, 2025 DoD 90d |
| N6945025F1196 delivery order | Folsom, LLC | $1.9M | Jiatf roof replacement and irrigation system replacement | Navy | Real property maintenance and repair | Sep 26, 2025 DoD 90d |
| FA820126F0083 delivery order | Architectural Design West PC | $1.9M | A-e services in support of hill afb 75th ceg/cen requirements and accordance with the sow dated 10 february 2026. | Air Force | Real property maintenance and repair | Apr 13, 2026 DoD 90d |
| W912QR24C0044 definitive contract | Addon Services LLC | $1.9M | Db construction for telecommunications infrastructure repair at the arlington heights arc located in arlington heights, il. | Army | Real property maintenance and repair | Feb 24, 2026 DoD 90d |
| FA500025F0005 delivery order | Teya Frawner JV LLC | $1.9M | Project to renovate work spaces, breakrooms, and bathrooms in building 9480. | Air Force | Real property maintenance and repair | Mar 26, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 12, 2026.
Terminal: filters by company, agency, category and date, with CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial