Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Yeajin E&c Co.,ltd

Yeajin E&c Co.,ltd: $50.5M in DoD and DHS awards

Yeajin E&c Co.,ltd holds 99 DoD and DHS prime awards with $50.5M obligated Oct 20, 2023 to May 28, 2026. Largest category: Real property maintenance and repair at $49.7M; largest buyer: Department of the Army at $50.5M.

Obligated FY2024+$50.5M
Awards99
FY2024$29.2M
FY2025$14.4M
FY2026 to date$6.9M
Lifetime obligated on these awards$51.3M
Parent company (as reported)Yeajin E&c Co.,ltd
First and latest actionOct 20, 2023 · May 28, 2026
By categoryObligated FY2024+
#CategoryObligated FY2024+AwardsShare
1Real property maintenance and repair$49.7M91 awards98%
2Equipment maintenance, other$374K4 awards0.7%
3Housekeeping and base services$331K2 awards0.7%
4Salvage, disposal and demolition$107K1 awards0.2%
5Administrative support$23K1 awards0.0%
By agencyObligated FY2024+
#AgencyObligated FY2024+AwardsShare
1Department of the Army$50.5M99 awards100%
Largest awards50 per page · sorted by obligated
AwardObligated FY2024+WhatAgencyCategoryLatest action
W90VN924F0175
delivery order
$6.1MRepair by replacement chiller and hvac system in marfork warfighting headquarters, bldg. no. 1115, camp mujukArmyReal property maintenance and repairAug 20, 2025
DoD 90d
W90VN725FA063
delivery order
$6.0MMlwr15-1006, renovate dormitory, bldg342, kunsan abArmyReal property maintenance and repairApr 16, 2026
DoD 90d
W90VN924F0119
delivery order
$4.3MRepair barracks, bldg. #262 at camp carrollArmyReal property maintenance and repairFeb 25, 2026
DoD 90d
W91QVN26FA396
delivery order
$3.8MConstruction, matoc fy26 / va-300000321363, replace boilers and chiller system for p-731 and p-737 usag humphreys.ArmyReal property maintenance and repairApr 27, 2026
DoD 90d
W90VN924F0140
delivery order
$3.6MMaximum contract amount - k workArmyReal property maintenance and repairMay 28, 2026
DoD 90d
W90VN825F0019
delivery order
$2.2MMaximum contract amount - k workArmyReal property maintenance and repairMay 20, 2026
DoD 90d
W91QVN24F0409
delivery order
$1.8M(k) replace variable air volume system bldg. p-6002, usag humphreysArmyReal property maintenance and repairJul 29, 2024
DoD 90d
W91QVN24F0348
delivery order
$1.8M(k) replace vav system (va-3-5-286087)ArmyReal property maintenance and repairSep 8, 2025
DoD 90d
W91QVN24F0363
delivery order
$1.8MRepair vav system at p-6006ArmyReal property maintenance and repairDec 17, 2025
DoD 90d
W91QVN24F0371
delivery order
$1.8MReplace variable air volume (vav) system p-6001, usag humphreysArmyReal property maintenance and repairDec 8, 2025
DoD 90d
W91QVN24F0378
delivery order
$1.8MReplace variable air volume (vav) system p-6004, usag humphreysArmyReal property maintenance and repairDec 28, 2025
DoD 90d
W91QVN24F0496
delivery order
$1.8MReplkace vav system at p-6005ArmyReal property maintenance and repairOct 16, 2025
DoD 90d
W90VN924F0149
delivery order
$879KRepair fitness center b135 at camp carrollArmyReal property maintenance and repairApr 3, 2025
DoD 90d
W90VN926FA080
delivery order
$835KRepave concrete at bldg 938, camp carrollArmyReal property maintenance and repairMar 31, 2026
DoD 90d
W90VN924F0132
delivery order
$692KMaximum contract amount - k workArmyReal property maintenance and repairFeb 19, 2025
DoD 90d
W90VN725FA069
delivery order
$659KFy25 f18pf 374421 ces planning fm 9 mlwr22-1020b, repair airfield pavement markings, kunsan ab.ArmyReal property maintenance and repairMay 14, 2026
DoD 90d
W91QVN24F0361
delivery order
$601KRepair mov actuator water plant, repair level metering system, repaint water storage tanks, install chemical feeding control system - multi project in bldg. p-12301, usag humphreysArmyReal property maintenance and repairMay 7, 2025
DoD 90d
W90VN725FA014
delivery order
$563KMlwr25-1012, repair runway pavement markings michael a. weatherford, 1st lt, USAF(782-5688) park, kwang eun(782-1062)ArmyReal property maintenance and repairJan 9, 2026
DoD 90d
W90VN926FA099
delivery order
$562KRepair failing exterior of b2650, pier#8 (work plan)ArmyReal property maintenance and repairApr 15, 2026
DoD 90d
W90VN725FA017
delivery order
$558KLcs cy25 mlwr24-1009, repair taxiway and apron pavement marking, remove and dispose existing entire taxiway and apron markings with waterjet blasting removal equipment. install new joint sealant at the ac shoulder/pcc slab interface on ...ArmyReal property maintenance and repairJan 9, 2026
DoD 90d
W90VN925FA106
delivery order
$462K(matoc) repair failed or failing b1385, bsfArmyReal property maintenance and repairJun 2, 2025
DoD 90d
W90VN924F0145
delivery order
$439KRepair deteriorated bldg s-1650 at camp henryArmyReal property maintenance and repairNov 24, 2024
DoD 90d
W90VN924F0181
delivery order
$422KOperation & maintenance at foc, ccArmyEquipment maintenance, otherAug 19, 2024
DoD 90d
W90VN926FA129
delivery order
$383K[matoc] repair leaking roof, wall and floor at b354, camp carroll [project# hs-00064-5j]ArmyReal property maintenance and repairMay 13, 2026
DoD 90d
W90VN925F0001
delivery order
$367KReplace existing deteriorated light fixtures at various facilities at cfa chinhae and cnfk hq busanArmyReal property maintenance and repairOct 16, 2025
DoD 90d
W90VN926FA086
delivery order
$331KOperation and maintenance, inspection, management and repair service of water treatment plant, wastewater treatment plant, heating ventilation air conditioning systems, facilities and utilities lines at forward operation site, camp carrollArmyHousekeeping and base servicesMar 31, 2026
DoD 90d
W90VN924F0134
delivery order
$313KRepair b s1621, camp henryArmyReal property maintenance and repairJan 16, 2025
DoD 90d
W90VN925FA047
delivery order
$279KReplace water lines and install dehumidifiers at b142 and b143, camp carrollArmyReal property maintenance and repairApr 14, 2025
DoD 90d
W90VN925FA052
delivery order
$272KRepair failing pavement and rearrange parking area around b706, camp walkerArmyReal property maintenance and repairApr 21, 2025
DoD 90d
W90VN925FA097
delivery order
$264K(matoc) remove failed underground hot water line with asbestos contained material, camp carrollArmyReal property maintenance and repairMay 28, 2025
DoD 90d
W90VN925FA070
delivery order
$262KRepair failing break room and shower room at b468, camp walker (project no. j1-00062-4j)ArmyReal property maintenance and repairSep 21, 2025
DoD 90d
W90VN925FA095
delivery order
$259K(matoc) replace leaking water pipelines for hvac system, camp walkerArmyReal property maintenance and repairMay 29, 2025
DoD 90d
W90VN924F0214
delivery order
$227KRepair kitchen at carroll fosArmyReal property maintenance and repairAug 21, 2024
DoD 90d
W91QVN25FA686
delivery order
$225KReplace sewage lift station s-1090ArmyReal property maintenance and repairSep 10, 2025
DoD 90d
W90VN924F0155
delivery order
$202KRepair well#3 at thaad siteArmyReal property maintenance and repairJul 2, 2024
DoD 90d
W90VN924F0125
delivery order
$186KK - replace carbon filters b344, cwArmyReal property maintenance and repairDec 13, 2024
DoD 90d
W90VN926FA065
delivery order
$182KRepair multiple failing fire hydrants, camp carrollArmyReal property maintenance and repairMar 5, 2026
DoD 90d
W90VN925FA107
delivery order
$181KRepair failed or failing elevated water tank at pier #8ArmyReal property maintenance and repairJun 4, 2025
DoD 90d
W90VN926FA096
delivery order
$160KRepair failed or failing fire deficiencies in b#800, 810, 820, camp walkerArmyReal property maintenance and repairApr 9, 2026
DoD 90d
W90VN625FA078
delivery order
$157KRepair fire alarm, detection and mns system, b995 at osan ab (project# smyu25-1011)ArmyReal property maintenance and repairAug 7, 2025
DoD 90d
W90VN924F0055
delivery order
$139KMaximum contract amount - k workArmyReal property maintenance and repairApr 1, 2024
DoD 90d
W90VN924F0071
delivery order
$132KInstall backflow prevention system for area ivArmyReal property maintenance and repairFeb 17, 2025
DoD 90d
W90VN926FA082
delivery order
$128KFewr no. j1-00089-5j, replace carbon filter media with new at b344, water treatment plant in camp walkerArmyReal property maintenance and repairMar 31, 2026
DoD 90d
W90VN925FA073
delivery order
$126KRenovate command conference room, msc-k hq bldg. 388, camp carroll (project no. ha-00001-3j)ArmyReal property maintenance and repairMar 6, 2026
DoD 90d
W90VN924F0105
delivery order
$116KWater proofing on roof, b265, camp walkerArmyReal property maintenance and repairOct 29, 2024
DoD 90d
W90VN925FA169
delivery order
$112KOperation and maintenance services for camp carroll fos, usag daeguArmyReal property maintenance and repairAug 11, 2025
DoD 90d
W90VN625FA049
delivery order
$107KDemo storm damaged golf equipment storage, b1357, b1358 osan air baseArmySalvage, disposal and demolitionMar 2, 2026
DoD 90d
W90VN925FA184
delivery order
$107KUnaccompanied housing common area and day room renovation daegu/gwangju abArmyReal property maintenance and repairAug 27, 2025
DoD 90d
W90VN925FA160
delivery order
$101KRepair failed and malfunctioning helipad lighting control system and broken field lights at camp walkerArmyReal property maintenance and repairNov 25, 2025
DoD 90d
W90VN925FA210
delivery order
$88KInstall platforms at bldg. 139, camp carroll and bldg. 1501, camp henryArmyReal property maintenance and repairSep 23, 2025
DoD 90d

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.

Terminal: filters, alerts and CSV export for this company's awards.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial