AwardTape · Defense awards · Within Interior Design, Inc
Within Interior Design, Inc: $20.3M in DoD and DHS awards
Within Interior Design, Inc holds 13 DoD and DHS prime awards with $20.3M obligated Dec 22, 2023 to Jun 4, 2026. Largest category: Equipment maintenance, other at $18.5M; largest buyer: Department of the Navy at $20.3M.
| Obligated FY2024+ | $20.3M |
|---|---|
| Awards | 13 |
| FY2024 | $36K |
| FY2025 | $1.2M |
| FY2026 to date | $19.1M |
| Lifetime obligated on these awards | $36.2M |
| First and latest action | Dec 22, 2023 · Jun 4, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Equipment maintenance, other | $18.5M | 1 awards | 91% |
| 2 | Real property maintenance and repair | $1.7M | 7 awards | 8.6% |
| 3 | New construction | $31K | 5 awards | 0.2% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Navy | $20.3M | 9 awards | 100% |
| 2 | U.S. Coast Guard | $0 | 4 awards | 0.0% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| N4008526F0297 delivery order | $18.5M | Lc-3601 shields halls ueh, replace hvac | Navy | Equipment maintenance, other | Jan 26, 2026 DoD 90d |
| N4008523F6332 delivery order | $1.2M | X008 nnsy building 278 renovations:exterior envelope replacement | Navy | Real property maintenance and repair | Jun 4, 2026 DoD 90d |
| N4008525F1257 delivery order | $568K | Construction of a pre-engineered gear storage building. | Navy | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| N4008521F6451 delivery order | $26K | Mm uem st - nnsy bldg 174 replace cooling tower | Navy | New construction | Dec 22, 2023 DoD 90d |
| N4008523F6690 delivery order | $13K | Cep-156 pre-engineered freezers naval station norfolk, norfolk, virginia | Navy | Real property maintenance and repair | May 15, 2025 DoD 90d |
| N4008524F5962 delivery order | $5.0K | Minimum guarantee for within interior design, inc. | Navy | New construction | Jul 25, 2024 DoD 90d |
| N4008524F6508 delivery order | $5.0K | Minimum guarantee - within interior design dba tazewell | Navy | Real property maintenance and repair | Sep 13, 2024 DoD 90d |
| HSCG4714C3EFK04 definitive contract | $0 | Igf::ot::igf replace roof of taylor hall, building 236, at u.s. coast guard training (tracen) yorktown, yorktown, va | U.S. Coast Guard | New construction | Aug 18, 2025 |
| HSCG5015CPFY046 definitive contract | $0 | Pr: 4314041 ige: $852,662 replace sewage lift station 210 and force main igf::ot::igf | U.S. Coast Guard | New construction | Aug 18, 2025 |
| HSCG8315CPCR023 definitive contract | $0 | Igf::ot::igf p/n 32-c3026 base e-city storm drainage | U.S. Coast Guard | Real property maintenance and repair | Oct 10, 2025 |
| HSCG8315CPCR071 definitive contract | $0 | Igf::ot::igf p/n 5744027, major m&r of fire protection sys in hangar #49 at cg base elizabeth city, elizabeth city, nc | U.S. Coast Guard | Real property maintenance and repair | Oct 10, 2025 |
| N4008524D0069 IDIQ contract | $0 | Base year for hampton roads aor small business macc | Navy | New construction | Apr 30, 2025 DoD 90d |
| N4008524D2512 IDIQ contract | $0 | Base year hvac/mech construction macc | Navy | Real property maintenance and repair | Sep 13, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial