AwardTape · Defense awards · Verdis Takisaki II
Verdis Takisaki II: $6.6M in DoD and DHS awards
Verdis Takisaki II holds 13 DoD and DHS prime awards with $6.6M obligated Feb 21, 2024 to Apr 13, 2026. Largest category: Real property maintenance and repair at $6.6M; largest buyer: Department of the Air Force at $6.6M.
| Obligated FY2024+ | $6.6M |
|---|---|
| Awards | 13 |
| FY2024 | $2.7M |
| FY2025 | $2.1M |
| FY2026 to date | $1.8M |
| Lifetime obligated on these awards | $6.6M |
| First and latest action | Feb 21, 2024 · Apr 13, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $6.6M | 13 awards | 100% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $6.6M | 13 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA462024F0097 delivery order | $1.1M | See section c | Air Force | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| FA462025F0067 delivery order | $850K | Install water main utility vaults at insertion tap locations and provide a condition study and report for the watermain piping from the geiger water facility to the extraction point. | Air Force | Real property maintenance and repair | Apr 13, 2026 DoD 90d |
| FA462025F0032 delivery order | $694K | See section c | Air Force | Real property maintenance and repair | May 28, 2025 DoD 90d |
| FA462026F0027 delivery order | $644K | This is a 35% design build, defined as a specific work element no. 2 (design-build effort required with provided partial design) proposed task order as specified in the basic matoc contract requirements, section 01000, paragraph 1.2. | Air Force | Real property maintenance and repair | Dec 18, 2025 DoD 90d |
| FA462024F0109 delivery order | $632K | See section c. | Air Force | Real property maintenance and repair | Apr 30, 2025 DoD 90d |
| FA462024F0057 delivery order | $602K | See section c | Air Force | Real property maintenance and repair | Jan 2, 2025 DoD 90d |
| FA462026F0038 delivery order | $582K | All labor, materials and equipment necessary to perform repair dorm skylights including but not limited to the design, material submittal process hazardous materials survey demolition, replacement and construction associated with the ... | Air Force | Real property maintenance and repair | Mar 18, 2026 DoD 90d |
| FA462026F0028 delivery order | $547K | Design services consisting of 65% design (15% government concept design is provided) work and all testing and inspection for repair for building 2465 to meet the requirements of the attached statement of work. | Air Force | Real property maintenance and repair | Dec 19, 2025 DoD 90d |
| FA462024F0060 delivery order | $488K | Fa462024f0060 - repair mechanical room and boiler, b1255 | Air Force | Real property maintenance and repair | Aug 29, 2024 DoD 90d |
| FA462025F0054 delivery order | $248K | Remove existing electric fire pump and associated fire pump infrastructure, install post indicator valve on fire water main and include tamper switch; modify emcs to reflect fire pump system control changes; acm abatement | Air Force | Real property maintenance and repair | Nov 21, 2025 DoD 90d |
| FA462025F0075 delivery order | $242K | 35% design, install automated identification scanning system complete to provide a complete automated identification base access system at the main entry control facility at fairchild afb. | Air Force | Real property maintenance and repair | Jul 25, 2025 DoD 90d |
| FA462024F0043 delivery order | $500 | Fy24 matoc orientation seminar | Air Force | Real property maintenance and repair | Feb 22, 2024 DoD 90d |
| FA462024D0004 IDIQ contract | $0 | Verdis takisaki ii: fy24 matoc idiq - basic contract: 5 year ordering period. | Air Force | Real property maintenance and repair | Feb 20, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial