AwardTape · Defense awards · Tehama-Llc and HDR Joint Venture LP
Tehama-Llc and HDR Joint Venture LP: -$336K in DoD and DHS awards
Tehama-Llc and HDR Joint Venture LP holds 33 DoD and DHS prime awards with -$336K obligated Mar 11, 2024 to Oct 23, 2025. Largest category: Architect-engineering services at -$336K; largest buyer: Department of the Air Force at -$336K.
| Obligated FY2024+ | -$336K |
|---|---|
| Awards | 33 |
| FY2024 | -$150K |
| FY2025 | -$55K |
| FY2026 to date | -$131K |
| Lifetime obligated on these awards | $20.4M |
| First and latest action | Mar 11, 2024 · Oct 23, 2025 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Architect-engineering services | -$336K | 33 awards | 100% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | -$336K | 33 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA813722F0041 delivery order | $138K | Incorporate concept (sow) design, 100% design, and preliminary 35% design | Air Force | Architect-engineering services | Jun 10, 2024 DoD 90d |
| FA813721F0101 delivery order | -$393 | Repair lightning protection, b3234 | Air Force | Architect-engineering services | Mar 21, 2025 DoD 90d |
| FA813721F0100 delivery order | -$1.5K | Concept (sow) design, b-52 allied suppt for temp 2- dock hangar, alc ramp | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0102 delivery order | -$1.5K | Concept (sow) design project install new fa & mns, post h54, b9001 | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0110 delivery order | -$1.5K | Concept design (sow) repair roof section 164, b9001. | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0112 delivery order | -$1.5K | Concept design (sow) repair roof section 163, b9001. | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0120 delivery order | -$1.5K | Concept (sow) design project, repair fire alarm system, b9001 posts x29, x31, s31, & s29. | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0132 delivery order | -$1.5K | Concept design (sow), renovate area for DLA/552 admin, b3001 post n47 | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0142 delivery order | -$1.5K | Concept (sow) design project: repair fire alarm system, b3001 posts i-67 and 2i-67 | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813722F0012 delivery order | -$1.5K | Concept (sow) design replace roof lean to #11,12,13,14,16, b3001 | Air Force | Architect-engineering services | Oct 23, 2025 DoD 90d |
| FA813722F0014 delivery order | -$1.5K | Renovate area to react lab, b9001 post dd-23 | Air Force | Architect-engineering services | Oct 23, 2025 DoD 90d |
| FA813722F0019 delivery order | -$1.5K | Renovate white houses, post p-43, b3001. | Air Force | Architect-engineering services | Oct 23, 2025 DoD 90d |
| FA813722F0028 delivery order | -$1.5K | Preliminary 35% design (saber or macc) repair utility connections, b9001 post h48 | Air Force | Architect-engineering services | Oct 23, 2025 DoD 90d |
| FA813721F0094 delivery order | -$1.8K | Preliminary 35% design (saber or macc): repair electrical gear room, bldg 1055 | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0096 delivery order | -$1.8K | Preliminary 35% design (saber or macc) emergency repair dormitory, b5931 | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0098 delivery order | -$1.8K | Preliminary 35% design (saber or macc) repair hvac diffusers and ductwork, b3001 post x57 | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813721F0114 delivery order | -$1.8K | Preliminary 35% design (saber or macc) construct aircraft parking spots 0-1 and 0-2. | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813722F0010 delivery order | -$1.8K | Preliminary 35% design (saber or macc) project repair crac unit, b3220 room 208. | Air Force | Architect-engineering services | Oct 23, 2025 DoD 90d |
| FA813722F0034 delivery order | -$1.8K | Preliminary 35% design (saber or macc) project repair depaint dock trench, b2122. | Air Force | Architect-engineering services | Oct 23, 2025 DoD 90d |
| FA813722F0036 delivery order | -$1.8K | Renovate office, b3001 post 2ag76a. | Air Force | Architect-engineering services | Oct 23, 2025 DoD 90d |
| FA813721F0106 delivery order | -$1.8K | A&e design requirements and design management project, evaluate existing hvac systems, b3708 | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813720F0029 delivery order | -$1.9K | Full contract&construction: maintain cooling tower concrete basin, b3311 | Air Force | Architect-engineering services | Mar 11, 2024 DoD 90d |
| FA813721F0145 delivery order | -$5.4K | 100% design, renovate restrooms at 2ah65a, b3001 | Air Force | Architect-engineering services | Apr 25, 2025 DoD 90d |
| FA813721F0141 delivery order | -$7.9K | 100% design, repair ventilation system, afsc pzim area, b3001 | Air Force | Architect-engineering services | Apr 25, 2025 DoD 90d |
| FA813720F0059 delivery order | -$15K | Concept (sow) design, wwyk150084/wo55583, repair transformer vault 7, b9001 | Air Force | Architect-engineering services | Jan 29, 2025 DoD 90d |
| FA813721F0136 delivery order | -$19K | 100% design >$2,000,000 install lightning protection, b214. | Air Force | Architect-engineering services | Oct 22, 2025 DoD 90d |
| FA813720F0057 delivery order | -$22K | A&e design requirements and design management - engineering study, tac, b9001 | Air Force | Architect-engineering services | Mar 11, 2024 DoD 90d |
| 0018 delivery order | -$27K | Igf::cl,ct::igf full contract&construction mgmt | Air Force | Architect-engineering services | Feb 11, 2025 DoD 90d |
| FA813722F0029 delivery order | -$42K | Fy22 tehama-llc and hdr joint venture lp(thdr) eng. svs. option year 4 - srm funding (1jan22-28feb22) | Air Force | Architect-engineering services | Mar 11, 2024 DoD 90d |
| FA813721F0104 delivery order | -$58K | Fy21 thdr eng svs option year 4 - srm funding (1jul21-30sep21) | Air Force | Architect-engineering services | Mar 11, 2024 DoD 90d |
| FA813722F0051 delivery order | -$67K | Thdr csag m&r, determine corrective action from airflow study, b3225 | Air Force | Architect-engineering services | Jul 30, 2024 DoD 90d |
| FA813722F0001 delivery order | -$82K | Fy22 thdr eng svs option year 4 - srm funding (1oct21-31dec21) | Air Force | Architect-engineering services | Oct 23, 2025 DoD 90d |
| FA813721F0074 delivery order | -$97K | Thdr csag - option year 4 funding (01apr2021-31mar2022) | Air Force | Architect-engineering services | Mar 11, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial