Sjv2: $12.1M in DoD and DHS awards
Sjv2 holds 41 DoD and DHS prime awards with $12.1M obligated Oct 3, 2023 to May 20, 2026. Largest category: Real property maintenance and repair at $6.2M; largest buyer: Department of the Air Force at $12.1M.
| Obligated FY2024+ | $12.1M |
|---|---|
| Awards | 41 |
| FY2024 | $5.0M |
| FY2025 | $6.2M |
| FY2026 to date | $924K |
| Lifetime obligated on these awards | $20.7M |
| First and latest action | Oct 3, 2023 · May 20, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $6.2M | 37 awards | 51% |
| 2 | New construction | $3.8M | 1 awards | 31% |
| 3 | Installation of equipment | $1.3M | 1 awards | 11% |
| 4 | Electronics and comms maintenance | $799K | 1 awards | 6.6% |
| 5 | Architect-engineering services | $0 | 1 awards | 0.0% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $12.1M | 41 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA706025F0003 delivery order | $3.8M | Replace jbab basewide transformers and switchgears | Air Force | New construction | Apr 7, 2026 DoD 90d |
| FA286025F0078 delivery order | $1.3M | This project shall consist of replacing the leaking 1000kva transformer t3320, installing a feed through -transformer for bldg. 3322 and replacement of primary electric switches sa3-010 and sb7-010. | Air Force | Installation of equipment | Sep 30, 2025 DoD 90d |
| FA462524F0024 delivery order | $966K | Replace heating ventilation and air conditioning equipment at the fitness center. | Air Force | Real property maintenance and repair | Jan 23, 2026 DoD 90d |
| FA706026F0054 delivery order | $799K | B94 repair faulty circuit breaker | Air Force | Electronics and comms maintenance | May 20, 2026 DoD 90d |
| FA462523F0146 delivery order | $708K | Replace heating ventilation air conditioning and doors at building 711. | Air Force | Real property maintenance and repair | Dec 3, 2025 DoD 90d |
| FA462524F0050 delivery order | $617K | Rv storage lot | Air Force | Real property maintenance and repair | Sep 25, 2025 DoD 90d |
| FA706025F0125 delivery order | $498K | The purpose of this contract is to renovate back gate area of b399 in accordance with the sow. | Air Force | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| FA462524F0057 delivery order | $487K | Wsa concrete culvert bridges as stated in sow dated 22 march 2024 | Air Force | Real property maintenance and repair | Aug 4, 2025 DoD 90d |
| FA286025F0084 delivery order | $469K | Provide all plant, labor, equipment, materials, and appliances and perform all operations necessary for the replacement of the chiller, distribution pumps, and pipes in b3465 | Air Force | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| FA462523F0152 delivery order | $366K | Repair joint seals and bricks at multiple facilities, part 1 | Air Force | Real property maintenance and repair | Feb 4, 2026 DoD 90d |
| FA462524F0023 delivery order | $364K | See attachment 1 for full sow. | Air Force | Real property maintenance and repair | Jun 6, 2024 DoD 90d |
| FA462524F0074 delivery order | $335K | The contractor shall supply all labor, materials, transportation, equipment, and supervision to provide a complete, finished product iaw the sow. | Air Force | Real property maintenance and repair | Nov 12, 2025 DoD 90d |
| FA462522F0103 delivery order | $316K | This requirement repairs the damaged foundation at building 2016 and replaces the fixtures. | Air Force | Real property maintenance and repair | Jun 13, 2024 DoD 90d |
| FA462524F0058 delivery order | $310K | Relocated vehicle maintenance in according with sow dated april 2024. | Air Force | Real property maintenance and repair | Feb 28, 2025 DoD 90d |
| FA462524F0079 delivery order | $239K | The contractor shall supply all labor, materials, transportation, equipment, and supervision to install a vehicle barrier. | Air Force | Real property maintenance and repair | Oct 18, 2024 DoD 90d |
| FA706023F0079 delivery order | $178K | Repair sewage lift stations | Air Force | Real property maintenance and repair | May 1, 2024 DoD 90d |
| FA462525F0015 delivery order | $170K | See attachment 1 for full sow. | Air Force | Real property maintenance and repair | Sep 16, 2025 DoD 90d |
| FA462524F0062 delivery order | $57K | Repair water damage at child development center, building 3021, at whiteman air force base, missouri. | Air Force | Real property maintenance and repair | Sep 4, 2024 DoD 90d |
| FA462524F0017 delivery order | $47K | This contract relocates public affairs office from building 59 to building 157. | Air Force | Real property maintenance and repair | Aug 5, 2024 DoD 90d |
| FA462523F0148 delivery order | $44K | Building 7 non-slip floor. | Air Force | Real property maintenance and repair | Oct 18, 2024 DoD 90d |
| FA462524F0020 delivery order | $33K | See attachment 1 for full sow. | Air Force | Real property maintenance and repair | Apr 19, 2024 DoD 90d |
| FA462523F0102 delivery order | $31K | Repair domestic water main. | Air Force | Real property maintenance and repair | Sep 30, 2024 DoD 90d |
| FA462522F0104 delivery order | $19K | This requirement replaces the roof at building 705. | Air Force | Real property maintenance and repair | May 21, 2024 DoD 90d |
| FA462523F0093 delivery order | $3.2K | Renovation of b-21 project integration office. | Air Force | Real property maintenance and repair | May 16, 2024 DoD 90d |
| FA462523F0083 delivery order | $2.1K | Add generator room power to two separate buildings on whiteman air force base. | Air Force | Real property maintenance and repair | Apr 8, 2025 DoD 90d |
| FA462524F0064 delivery order | $600 | Equitable adjustment iaw saber sow c 304.4 as the government and the contractor could not come to an agreement on this project. | Air Force | Real property maintenance and repair | Sep 12, 2024 DoD 90d |
| FA462524F0063 delivery order | $520 | Task order issue to provide equitable adjustment to the contractor for the efforts made in the proposal stage of the acquisition. | Air Force | Real property maintenance and repair | Sep 9, 2024 DoD 90d |
| FA462524F0083 delivery order | $500 | Fy24 design 1144896 remove underground storage tank, b5100 and b5039 | Air Force | Real property maintenance and repair | Sep 27, 2024 DoD 90d |
| FA286021D0029 IDIQ contract | $0 | Multiple award construction contract (macc), in support of jba and jbab, for design-build (db) and construction only services based on general statements of work further defined with each individual task order (to). | Air Force | Architect-engineering services | Apr 23, 2026 DoD 90d |
| FA462520D0002 IDIQ contract | $0 | Simplified acquisition base engineering requirements | Air Force | Real property maintenance and repair | Mar 27, 2025 DoD 90d |
| FA462521F0093 delivery order | $0 | Building 153 suite renovation | Air Force | Real property maintenance and repair | Oct 3, 2023 DoD 90d |
| FA462521F0106 delivery order | $0 | Repair shoppette | Air Force | Real property maintenance and repair | Nov 13, 2023 DoD 90d |
| FA462523F0043 delivery order | $0 | Replace cooling units in building 149 server room. | Air Force | Real property maintenance and repair | May 14, 2024 DoD 90d |
| FA462523F0055 delivery order | $0 | Replacing a generator at building 115, whiteman air force base. | Air Force | Real property maintenance and repair | Jan 17, 2025 DoD 90d |
| FA462523F0061 delivery order | $0 | Install lighting at whiteman air force base | Air Force | Real property maintenance and repair | Sep 5, 2024 DoD 90d |
| FA462523F0087 delivery order | $0 | The contractor shall provide all services, materials, supplies, labor, studies, management, travel, and other resources necessary to remove the 1,000-gallon underground diesel storage tank. | Air Force | Real property maintenance and repair | Nov 14, 2023 DoD 90d |
| FA462523F0088 delivery order | $0 | Installation of transformers and switches at b44 and near b890 | Air Force | Real property maintenance and repair | Mar 27, 2026 DoD 90d |
| FA462523F0116 delivery order | $0 | Install waterlines and power outlets in b38 on wafb, mo. | Air Force | Real property maintenance and repair | Nov 29, 2023 DoD 90d |
| FA462523F0123 delivery order | $0 | Install new fiber optic cable and control units to control the precision approach path indicator lights (papis). | Air Force | Real property maintenance and repair | Oct 22, 2024 DoD 90d |
| FA462523F0142 delivery order | $0 | Construct concrete pad. | Air Force | Real property maintenance and repair | Feb 6, 2024 DoD 90d |
| FA462523F0089 delivery order | -$61K | Remove rubber from the ends of the runway, caused by landing aircraft tires, and to repaint markings. | Air Force | Real property maintenance and repair | Mar 22, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial