AwardTape · Defense awards · Red Canyon Perikin JV, LLC
Red Canyon Perikin JV, LLC: $74.8M in DoD and DHS awards
Red Canyon Perikin JV, LLC holds 10 DoD and DHS prime awards with $74.8M obligated Jan 28, 2025 to May 15, 2026. Largest category: Prefabricated structures at $48.5M; largest buyer: Department of the Air Force at $74.8M.
| Obligated FY2024+ | $74.8M |
|---|---|
| Awards | 10 |
| FY2024 | $0 |
| FY2025 | $39.0M |
| FY2026 to date | $35.8M |
| Lifetime obligated on these awards | $75.6M |
| First and latest action | Jan 28, 2025 · May 15, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Prefabricated structures | $48.5M | 3 awards | 65% |
| 2 | Program and management support | $24.1M | 3 awards | 32% |
| 3 | Instruments and lab equipment | $2.2M | 2 awards | 2.9% |
| 4 | Ammunition, other | $1.0K | 2 awards | 0.0% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $74.8M | 10 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA910126FB037 delivery order | $33.6M | Large aircraft maintenance shelters procurement for oconus locations | Air Force | Prefabricated structures | May 15, 2026 DoD 90d |
| FA910125FB036 delivery order | $23.0M | Large aircraft maintenance shelters (lams) initial locations installation | Air Force | Program and management support | May 1, 2026 DoD 90d |
| FA910125FB030 delivery order | $14.9M | Large aircraft maintenance shelters (lams) initial structure procurement | Air Force | Prefabricated structures | Jan 27, 2026 DoD 90d |
| FA910125FB025 delivery order | $2.2M | The primary purpose of the requirement is to obtain a non-intrusive measurement system capable of measuring static pressure, static temperature, velocity, unburned fuel, and mass flow at the direct connect nozzle and freejet nozzle exits. | Air Force | Instruments and lab equipment | Mar 4, 2026 DoD 90d |
| FA910126FB019 delivery order | $1.0M | Lams oconus geotech survey and engineering assessment | Air Force | Program and management support | Jan 28, 2026 DoD 90d |
| FA910125FB012 delivery order | $113K | Large aircraft maintenance shelters (lams) solution | Air Force | Program and management support | Jan 28, 2025 DoD 90d |
| FA865625FB049 delivery order | $1.0K | Fourth on-ramp for eglin wide agile acquisition contract (ewaac) vehicle. | Air Force | Ammunition, other | Apr 9, 2025 DoD 90d |
| FA865625DB065 IDIQ contract | $0 | Fourth on-ramp for eglin wide agile acquisition contract (ewaac) vehicle. | Air Force | Ammunition, other | Jun 13, 2025 DoD 90d |
| FA910125DB005 IDIQ contract | $0 | Large aircraft maintenance shelters (lams) | Air Force | Prefabricated structures | Aug 26, 2025 DoD 90d |
| FA910125DB008 IDIQ contract | $0 | The primary purpose of the requirement is to obtain a non-intrusive measurement system capable of measuring static pressure, static temperature, velocity, unburned fuel, and mass flow at the direct connect nozzle and freejet nozzle exits | Air Force | Instruments and lab equipment | Apr 29, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial