AwardTape · Defense awards · Olgoonik General, LLC
Olgoonik General, LLC: $30.0M in DoD and DHS awards (this registration)
This registration, Olgoonik General, LLC, holds 42 DoD and DHS prime awards with $30.0M obligated Apr 5, 2024 to Sep 4, 2026. Largest category: Real property maintenance and repair at $19.1M; largest buyer: Department of the Army at $17.5M.
| Obligated FY2024+ | $30.0M |
|---|---|
| Awards | 42 |
| FY2024 | $11.2M |
| FY2025 | $13.7M |
| FY2026 to date | $5.0M |
| Lifetime obligated on these awards | $30.0M |
| Parent company | Olgoonik General: $30.3M in DoD and DHS awards since FY2024 across 2 registrations |
| First and latest action | Apr 5, 2024 · Sep 4, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $19.1M | 21 awards | 64% |
| 2 | New construction | $7.7M | 14 awards | 26% |
| 3 | Electronics and comms maintenance | $2.2M | 1 awards | 7.4% |
| 4 | Environmental and natural resources services | $847K | 4 awards | 2.8% |
| 5 | IT products: platform | $143K | 1 awards | 0.5% |
| 6 | Special industry machinery | $0 | 1 awards | 0.0% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Army | $17.5M | 28 awards | 58% |
| 2 | Department of the Air Force | $12.3M | 13 awards | 41% |
| 3 | Federal Emergency Management Agency | $143K | 1 awards | 0.5% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA487725F0250 delivery order | $4.6M | Renovate b1550 for wbs for 34 wps 88 tes 355 amxs beddown | Air Force | Real property maintenance and repair | Jul 31, 2025 DoD 90d |
| W912DQ24C4019 definitive contract | $2.2M | Replace hvac controls specker barracks | Army | Electronics and comms maintenance | Aug 8, 2025 DoD 90d |
| FA487725F0249 delivery order | $2.0M | Repair of b1634 492nd sow wrm and 355th mdg | Air Force | Real property maintenance and repair | Jul 31, 2025 DoD 90d |
| FA255024C0008 definitive contract | $1.8M | Glen 24-1004 rpr/rpl elect transformers (ta1/ta2), b400 | Air Force | Real property maintenance and repair | Mar 24, 2026 DoD 90d |
| W912DQ24C4016 definitive contract | $1.7M | Construct new offices bld 2130 | Army | Real property maintenance and repair | Oct 30, 2025 DoD 90d |
| W9127S26FA045 delivery order | $1.4M | Site preparation for temporary building, ucic-mcx compound, taney county, missouri. all shall be complete within sixty (60) calendar days of receipt of notice to proceed. | Army | New construction | Mar 23, 2026 DoD 90d |
| W912DQ26CA005 definitive contract | $894K | No description on the record | Army | Real property maintenance and repair | Nov 24, 2025 DoD 90d |
| W912DQ26CA006 definitive contract | $879K | This project consists of providing all labor, equipment, and material to repair metal of pt building 767, ta 108, located on fort leonard wood, mo. | Army | Real property maintenance and repair | Nov 24, 2025 DoD 90d |
| FA487725F0152 delivery order | $875K | No description on the record | Air Force | Real property maintenance and repair | Mar 24, 2026 DoD 90d |
| W912DQ25CA023 definitive contract | $847K | Construct physical training (pt) pit #815 | Army | New construction | Sep 26, 2025 DoD 90d |
| W912DQ25CA019 definitive contract | $837K | Construct pt pit building 757 | Army | New construction | Sep 22, 2025 DoD 90d |
| W912DQ25CA017 definitive contract | $792K | Construct physical training (pt) pit #819 | Army | New construction | Feb 26, 2026 DoD 90d |
| W912DQ24C4013 definitive contract | $777K | Repair bldg. 889 and bldg. 889a on fort leonard wood, mo | Army | Real property maintenance and repair | Sep 18, 2024 DoD 90d |
| FA487725F0277 delivery order | $773K | No description on the record | Air Force | Real property maintenance and repair | Aug 21, 2025 DoD 90d |
| W912DQ24C4024 definitive contract | $761K | No description on the record | Army | New construction | Jan 8, 2026 DoD 90d |
| W912DQ24C4049 definitive contract | $748K | Repair metal buidling | Army | Real property maintenance and repair | Sep 27, 2024 DoD 90d |
| W912DQ25CA011 definitive contract | $622K | Provide all labor, equipment, and material to procure and renovate building 826 swift gym at fort leonard wood, missouri. | Army | New construction | Jul 31, 2025 DoD 90d |
| W912DQ25CA012 definitive contract | $597K | Renovate building #746 cunningham gym - flwmo | Army | New construction | Jul 31, 2025 DoD 90d |
| W912DQ24C4045 definitive contract | $592K | Removal and installation of concrete | Army | Real property maintenance and repair | Sep 27, 2024 DoD 90d |
| W912DQ24C4046 definitive contract | $589K | Removal and installation of concrete | Army | Real property maintenance and repair | Sep 27, 2024 DoD 90d |
| W912DQ24C4011 definitive contract | $571K | Renovate shea gym bldg 640. | Army | Real property maintenance and repair | Mar 4, 2025 DoD 90d |
| W912DQ25CA015 definitive contract | $544K | This project consists of providing all design, labor, equipment, and material to enclose cage area, replace hvac, and controls for building 781 and install new exhaust blower in building772 at fort leonard wood, missouri. | Army | New construction | Sep 18, 2025 DoD 90d |
| FA487725F0251 delivery order | $517K | This project will consist of the field investigation, design, plans, specifications, installation, and testing in connection with the replace fire alarm panels project in bldg 12 at davis-monthan afb, arizona. | Air Force | Real property maintenance and repair | Jul 31, 2025 DoD 90d |
| W9127S26FA053 delivery order | $506K | Satoc #1, electrical upgrades gamaliel campground, norfork lake. all work shall be complete within one-hundred and eighty (180) calendar days. | Army | New construction | Mar 26, 2026 DoD 90d |
| FA487725F0230 delivery order | $499K | A. the macc is designed to provide a flexible, competitive, and responsive contractual capability to perform design-build and bid-build construction work at davis-monthan afb, az. and luke afb. | Air Force | Real property maintenance and repair | Mar 17, 2026 DoD 90d |
| W911S724C0003 definitive contract | $472K | Replace boilers | Army | New construction | Apr 5, 2024 DoD 90d |
| FA254324C0008 definitive contract | $454K | Bldg 419 gate replacement. see statement of work (sow) dated 20 september 2024 for complete details. | Air Force | Real property maintenance and repair | Sep 24, 2025 DoD 90d |
| W9124M24F0119 delivery order | $444K | 1001 option year 1 tng land sustainment | Army | Environmental and natural resources services | Apr 29, 2026 DoD 90d |
| FA487726F0135 delivery order | $423K | Eol sprinkler replacement bldgs: 4224, 3750, 5029, 304, 4824, and 79 . | Air Force | Real property maintenance and repair | Apr 22, 2026 DoD 90d |
| FA487726F0140 delivery order | $421K | To repair/replace multiple fire hydrants at davis monthan afb | Air Force | Real property maintenance and repair | Apr 28, 2026 DoD 90d |
| W9124M24F0157 delivery order | $179K | 1001 option year 1 tng land sustainment | Army | Environmental and natural resources services | Feb 26, 2025 DoD 90d |
| W9127S26FA047 delivery order | $154K | Stairwell wall tile demolition, norfork powerhouse in baxter county, arkansas. work shall be completed within twenty-five (25) days of task order award. | Army | New construction | Mar 10, 2026 DoD 90d |
| 70FBR826P00000020 purchase order | $143K | Region 8 fiber line from building 710 to building 53 | Federal Emergency Management Agency | IT products: platform | Sep 4, 2026 |
| W9124M24F0120 delivery order | $121K | 1001 option year 1 tng land sustainment | Army | Environmental and natural resources services | Sep 13, 2024 DoD 90d |
| W912DQ25CA006 definitive contract | $121K | This project consists of providing all labor, equipment, and material to design and install an ICE machine enclosure in building 2130 at fort leonard wood, missouri. | Army | New construction | Jul 10, 2025 DoD 90d |
| W9124M24F0160 delivery order | $103K | 1001 option year 1 tng land sustainment | Army | Environmental and natural resources services | Feb 21, 2025 DoD 90d |
| W911S724C0004 definitive contract | $82K | 8a set aside freeze repair at bldg. 319 | Army | New construction | Apr 19, 2024 DoD 90d |
| FA251725P0094 purchase order | $31K | Installation of signage along running routes on peterson. | Air Force | Real property maintenance and repair | Feb 23, 2026 DoD 90d |
| FA487724F0231 delivery order | $250 | Task order to satisfy the minimum dollar amount required for the base multiple award construction contract contract. | Air Force | Real property maintenance and repair | Sep 10, 2024 DoD 90d |
| FA487724D0013 IDIQ contract | $0 | A. the macc is designed to provide a flexible, competitive, and responsive contractual capability to perform design-build and bid-build construction work at davis-monthan afb, az. and luke afb. | Air Force | Real property maintenance and repair | Feb 13, 2026 DoD 90d |
| W9124M22D0002 IDIQ contract | $0 | 0001 base year training land sustainment | Army | Special industry machinery | Jun 3, 2026 DoD 90d |
| W9127S25DA004 IDIQ contract | $0 | Idiq satoc for swl minor construction projects (cw and mil). 5-year base ordering period with no optional periods. | Army | New construction | Sep 8, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial