AwardTape · Defense awards · Mn-Bmcd ML Joint Venture
Mn-Bmcd ML Joint Venture: $23.3M in DoD and DHS awards
Mn-Bmcd ML Joint Venture holds 14 DoD and DHS prime awards with $23.3M obligated Mar 28, 2024 to Apr 8, 2026. Largest category: Architect-engineering services at $23.3M; largest buyer: Department of the Navy at $23.3M.
| Obligated FY2024+ | $23.3M |
|---|---|
| Awards | 14 |
| FY2024 | $8.9M |
| FY2025 | $12.0M |
| FY2026 to date | $2.4M |
| Lifetime obligated on these awards | $34.4M |
| First and latest action | Mar 28, 2024 · Apr 8, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Architect-engineering services | $23.3M | 14 awards | 100% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Navy | $23.3M | 14 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| N6247024F4169 delivery order | $11.9M | Fy26 milcon project p-732 nnsy | Navy | Architect-engineering services | Sep 19, 2025 DoD 90d |
| N4008525F4984 delivery order | $3.5M | Rm22-0555 ammo pier 4 electrical upgrade | Navy | Architect-engineering services | Mar 26, 2025 DoD 90d |
| N6247026F0005 delivery order | $2.2M | P1062 dry dock 3 modernization: post construction award services | Navy | Architect-engineering services | Jan 20, 2026 DoD 90d |
| N4008524F6601 delivery order | $1.5M | Pier 14 CVN-78 cap. study | Navy | Architect-engineering services | Sep 19, 2024 DoD 90d |
| N3943024F4172 delivery order | $1.4M | Lindsay elecsys connect services for cathodic protection rectifier remote monitoring units | Navy | Architect-engineering services | Dec 10, 2025 DoD 90d |
| N6247024F4063 delivery order | $974K | Cost schedule risk analysis dry dock 8 | Navy | Architect-engineering services | Apr 8, 2026 DoD 90d |
| N4008524F6220 delivery order | $539K | X001 nnsy - dry dock structural control inspections | Navy | Architect-engineering services | Dec 29, 2025 DoD 90d |
| N6247025F0018 delivery order | $446K | Dry dock 3 modernization - utility bridge design see section j for saes and attachments. | Navy | Architect-engineering services | Nov 24, 2025 DoD 90d |
| N4008524F6658 delivery order | $250K | Pcas for v-47 breakwater pier, naval station norfolk, norfolk, virginia | Navy | Architect-engineering services | Sep 27, 2024 DoD 90d |
| N3943024F4135 delivery order | $234K | Workshop on resilience of NAVY waterfront facilities in a changing climate part ii | Navy | Architect-engineering services | Jul 17, 2024 DoD 90d |
| N4008524F5890 delivery order | $229K | Uplift study for dd2 | Navy | Architect-engineering services | Sep 11, 2024 DoD 90d |
| N4008526F0521 delivery order | $59K | Perform a new seismic analysis of the complex geometry of the section s1.3 dock slice (including the deeper trench and non-continuous longitudinal slab), in order to analytically resolve the concern noted by navsea letter ser 04q/171. | Navy | Architect-engineering services | Mar 27, 2026 DoD 90d |
| N4008522D0047 IDIQ contract | $0 | Architect and engineering services for waterfront projects primarily in hampton roads | Navy | Architect-engineering services | May 6, 2025 DoD 90d |
| N6247023F4180 delivery order | $0 | Preliminary design of p-732 electrical | Navy | Architect-engineering services | Jan 31, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial