AwardTape · Defense awards · Mem Contracting, Inc
Mem Contracting, Inc: $25.6M in DoD and DHS awards
Mem Contracting, Inc holds 54 DoD and DHS prime awards with $25.6M obligated Oct 11, 2023 to Jun 3, 2026. Largest category: New construction at $23.5M; largest buyer: Department of the Army at $25.6M.
| Obligated FY2024+ | $25.6M |
|---|---|
| Awards | 54 |
| FY2024 | $11.7M |
| FY2025 | $12.2M |
| FY2026 to date | $1.7M |
| Lifetime obligated on these awards | $39.2M |
| Parent company (as reported) | Mem Contracting, Inc |
| First and latest action | Oct 11, 2023 · Jun 3, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | New construction | $23.5M | 41 awards | 92% |
| 2 | Real property maintenance and repair | $2.0M | 10 awards | 7.9% |
| 3 | Engineering and technical services | $80K | 1 awards | 0.3% |
| 4 | Installation of equipment | $0 | 1 awards | 0.0% |
| 5 | Weapons and missile maintenance | -$4.5K | 1 awards | -0.0% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Army | $25.6M | 54 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W56ZTN24F0057 delivery order | $2.8M | The purpose of this task order is to provide funding for wr#im0001c3j - building 311 repair water infiltration | Army | New construction | Jun 10, 2025 DoD 90d |
| W56ZTN24F0109 delivery order | $2.3M | The purpose of this task order is to provide funding for wr# naf000073j, naf000083j, naf000093j, naf000063j and naf0000a3j - remove/replace playground pip surface. the pop date for this project is 04/11/2025. | Army | New construction | Feb 20, 2026 DoD 90d |
| W56ZTN25FA047 delivery order | $2.0M | Renovate the existing cooling and heating system within building 4403. | Army | New construction | May 26, 2026 DoD 90d |
| W56ZTN25FA061 delivery order | $1.9M | This requirement funds the renovation the existing cooling and heating system within building 2401at aberdeen proving ground, maryland. | Army | New construction | Sep 12, 2025 DoD 90d |
| W56ZTN25FA063 delivery order | $1.6M | Upgrade hvac bldg. 112 | Army | New construction | Sep 15, 2025 DoD 90d |
| W56ZTN24F0036 delivery order | $1.4M | This task order funds the replacement of 33 fan coil units on the 3rd floor of building 4401 at aberdeen proving ground md, wr# ck000029j-02 | Army | New construction | Feb 18, 2026 DoD 90d |
| W91CRB22F0298 delivery order | $1.4M | New task order | Army | Real property maintenance and repair | Jan 23, 2026 DoD 90d |
| W56ZTN25FA036 delivery order | $1.2M | The purpose of this project is to remove the existing air-cooled chiller, and two air-handlings units located in two separate roof top penthouses and replace the units with new. | Army | New construction | Jul 30, 2025 DoD 90d |
| W56ZTN23F0086 delivery order | $1.0M | Funding to repair water damage at top of the bay, building 30 on aberdeen proving ground, wr# mwb000023j. | Army | New construction | May 20, 2026 DoD 90d |
| W56ZTN25FA039 delivery order | $871K | This requirement is for the twelfth phase of life-cycle replacement for the replacement or removal of various above ground storage tanks at aberdeen proving ground, maryland. | Army | New construction | Aug 12, 2025 DoD 90d |
| W56ZTN24F0023 delivery order | $838K | This task order funds the repair of the chiller at building 4304 at aberdeen proving ground, md. wr# ie000043j | Army | New construction | Jan 16, 2025 DoD 90d |
| W56ZTN25FA053 delivery order | $715K | Replace steam/heating water system replacement for building 315 at the intersection of civil rd and gillon st in the aberdeen area of aberdeen proving ground (apg), maryland. | Army | New construction | Mar 12, 2026 DoD 90d |
| W56ZTN25F0084 delivery order | $699K | Roof repair for building 6007, aberdeen proving ground. | Army | New construction | May 13, 2025 DoD 90d |
| W56ZTN24F0158 delivery order | $687K | This project replaces the inside and outside heating, ventilation, and air conditioning systems for building 3074 on aberdeen proving ground. | Army | New construction | Apr 11, 2025 DoD 90d |
| W56ZTN25FA054 delivery order | $645K | This requirement funds the replacement of the fire alarm transmitting system at adelphi laboratory center installation. | Army | New construction | Sep 8, 2025 DoD 90d |
| W56ZTN25FA027 delivery order | $496K | Repair air handler unit (ahu), air cooled chiller, and centrifugal pumps. | Army | New construction | Jan 5, 2026 DoD 90d |
| W56ZTN23F0100 delivery order | $477K | This task order funds the correction to aberdeen area cemetery oip repeat findings, wr# im000023j. | Army | New construction | Jun 24, 2025 DoD 90d |
| W91CRB23F0169 delivery order | $454K | Maintenance activities | Army | Real property maintenance and repair | May 5, 2025 DoD 90d |
| W56ZTN26FA077 delivery order | $426K | Repair re-heat coil bldg. e4110 | Army | New construction | May 15, 2026 DoD 90d |
| W56ZTN24F0046 delivery order | $404K | This task order funds for wr# am000060j - repair building envelope a4502 | Army | New construction | Dec 18, 2024 DoD 90d |
| W56ZTN24F0167 delivery order | $364K | The purpose of this task order is to provide funding for wr# mt000113j - b5014 repair hvac system. the total funded amount for this project is $364,088.36. the pop date is 04/16/2025. | Army | New construction | Jan 8, 2026 DoD 90d |
| W56ZTN25FA072 delivery order | $308K | Reline approximately 600 - 1200 lf of 21-inch sewer pipe from to this is a gravity sewer with 3-5 manholes. | Army | New construction | Feb 18, 2026 DoD 90d |
| W56ZTN26FA052 delivery order | $306K | The scope of this project consists of providing all plant, labor, materials and equipment to perform all work necessary to repair/renovate building 743 to repair the doors, walls and loading dock. this is a design build project | Army | New construction | Apr 29, 2026 DoD 90d |
| W56ZTN24F0009 delivery order | $302K | This task order funds the chiller replacement at building 1100f at aberdeen proving ground, wr# ie000011j. | Army | New construction | Apr 11, 2025 DoD 90d |
| W56ZTN24F0054 delivery order | $286K | The purpose of this task order is to providing funding for wr# im000079j - replace the generator located behind the building, and the automatic transfer switch (ats) dedicated for the edgewood area child development center area e1901 | Army | New construction | Feb 10, 2026 DoD 90d |
| W56ZTN24F0123 delivery order | $275K | This task order funds wr# im0001e8j - installation of generator at the cdc in apg building e1902. | Army | New construction | Feb 18, 2026 DoD 90d |
| W56ZTN19C0002 definitive contract | $270K | Maintenance and repairs for aberdeen proving ground north&south pools. | Army | Real property maintenance and repair | Sep 24, 2025 DoD 90d |
| W56ZTN24F0191 delivery order | $254K | This project is to design and replace the sewer lift station located near building 4056 on edgewood area aberdeen proving ground. this station has reached the end of its life-span and needs to be replaced for normal, safe operations to ... | Army | New construction | Sep 24, 2024 DoD 90d |
| W56ZTN23F0099 delivery order | $248K | Funding for wr# im000033j | Army | New construction | Jun 24, 2025 DoD 90d |
| W56ZTN26FA028 delivery order | $191K | Heat exchanger/tank building 4507 | Army | New construction | Jun 3, 2026 DoD 90d |
| W56ZTN25F0034 delivery order | $108K | This task order funds the replacement of the air-cooled condensing unit at building 4401, wr# ck000029j- 03. | Army | New construction | Mar 21, 2025 DoD 90d |
| W56ZTN24F0190 delivery order | $101K | The project replaces older generation electrical panels for the first and second floor of building 5101 on edgewood area aberdeen proving ground. | Army | New construction | Dec 17, 2024 DoD 90d |
| W91QV121P0022 purchase order | $80K | Fire alarm monitoring at fort detrick | Army | Engineering and technical services | Dec 4, 2025 DoD 90d |
| W56ZTN24F0155 delivery order | $77K | This project replaces an overhead door at building 2401 on aberdeen proving ground for safe and normal operations. | Army | New construction | Jul 30, 2024 DoD 90d |
| W56ZTN25FA031 delivery order | $75K | Repair n-field bunker building e1454 aberdeen proving ground, maryland | Army | New construction | Mar 16, 2026 DoD 90d |
| W911QX21F0136 delivery order | $38K | L1272/3 big magnet installation - construction task order | Army | Real property maintenance and repair | Sep 12, 2025 DoD 90d |
| W56ZTN24F0029 delivery order | $36K | This task order funds the repair overhang at building e5100 at aberdeen proving ground, maryland -wr# as0000119j | Army | New construction | Sep 25, 2024 DoD 90d |
| W56ZTN23F0039 delivery order | $15K | Funding for wr# am000051j | Army | New construction | Oct 23, 2024 DoD 90d |
| W56ZTN24F0094 delivery order | $6.2K | This task order is to provide funds for bond overrun on bonding of $1m. | Army | New construction | May 14, 2024 DoD 90d |
| W56ZTN22D0001 IDIQ contract | $0 | Multiple award task order contract for building renovation, construction, modernization, etc. | Army | New construction | Mar 31, 2026 DoD 90d |
| W56ZTN23F0024 delivery order | $0 | The purpose of this task order is to replace doah-1 and 32 fan coil units on 2nd floor of building 4401 at aberdeen proving ground, md. | Army | New construction | Mar 12, 2024 DoD 90d |
| W56ZTN23F0094 delivery order | $0 | The purpose of this contract is to re-stripe the existing running track lines and numbers for best visibility and function. | Army | New construction | Jan 9, 2024 DoD 90d |
| W56ZTN23F0103 delivery order | $0 | Funding to repair n-field bunker lights design, provide and install a new site light system at the edgewood area e1454 n-field magazine. wr# as0000z2j | Army | New construction | Aug 22, 2024 DoD 90d |
| W56ZTN23F0129 delivery order | $0 | This project is for the ninth phase of life-cycle replacement for the replacement or removal of various above ground storage tanks that have reached the end of their life cycle on aberdeen proving ground and edgewood area apg. | Army | New construction | Jun 27, 2024 DoD 90d |
| W56ZTN23F0143 delivery order | $0 | This project funds needed repairs to the boiler in the central heating plant building 345 at aberdeen proving ground. the boiler requires a new blowdown system and repairs to the deaerator tank. | Army | New construction | Nov 5, 2024 DoD 90d |
| W56ZTN24F0095 delivery order | $0 | The period of performance is 14 marck 2025.this task order is to fund wr#ar0000n3j repair/replace chiller #2 b4600. | Army | New construction | Jul 10, 2024 DoD 90d |
| W911QX20D0005 IDIQ contract | $0 | Satocc minor construction | Army | Real property maintenance and repair | May 12, 2025 DoD 90d |
| W911QX22F0005 delivery order | $0 | Vtef project bldg 4603 - construction task order | Army | Installation of equipment | Oct 26, 2023 DoD 90d |
| W911QX22F0009 delivery order | $0 | B328 ups replacement at apg, md. | Army | Real property maintenance and repair | Oct 30, 2023 DoD 90d |
| W911QX22F0080 delivery order | $0 | Reconnect busway electrical feed at b4600 located at apg, md. | Army | Real property maintenance and repair | Nov 30, 2023 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial