AwardTape · Defense awards · Leisnoi Professional Services LLC
Leisnoi Professional Services LLC: $16.6M in DoD and DHS awards
Leisnoi Professional Services LLC holds 19 DoD and DHS prime awards with $16.6M obligated Apr 5, 2024 to Jun 5, 2026. Largest category: Real property maintenance and repair at $9.4M; largest buyer: Department of the Air Force at $15.4M.
| Obligated FY2024+ | $16.6M |
|---|---|
| Awards | 19 |
| FY2024 | $2.8M |
| FY2025 | $13.2M |
| FY2026 to date | $551K |
| Lifetime obligated on these awards | $37.4M |
| First and latest action | Apr 5, 2024 · Jun 5, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $9.4M | 15 awards | 57% |
| 2 | Equipment maintenance, other | $5.0M | 1 awards | 30% |
| 3 | Engineering and technical services | $1.4M | 1 awards | 8.5% |
| 4 | Installation of equipment | $405K | 1 awards | 2.5% |
| 5 | Utilities | $265K | 1 awards | 1.6% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $15.4M | 17 awards | 93% |
| 2 | Department of the Army | $1.0M | 1 awards | 6.3% |
| 3 | U.S. Coast Guard | $87K | 1 awards | 0.5% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA460025F0132 delivery order | $5.0M | Provide all labor, materials, tools, equipment, architect-engineer (ae) services, and db services necessary for design and construction of the modernizing the power supervisory control and data acquisition (scada) system in b518. | Air Force | Equipment maintenance, other | Jan 8, 2026 DoD 90d |
| FA303025F0029 delivery order | $3.0M | Design-build (db) task order to perform design and repair work as described in the statement of work (sow) dated 7 may 2025 and associated project documents, and in accordance with all applicable codes, regulations, standards and criteria. | Air Force | Real property maintenance and repair | Jan 7, 2026 DoD 90d |
| FA301625F0276 delivery order | $2.3M | Base defense operations center (bdoc) b2244, 100% design and build (db) at jbsa-ft sam houston, tx. | Air Force | Real property maintenance and repair | Mar 23, 2026 DoD 90d |
| FA460024F0187 delivery order | $1.4M | To provide for all labor, equipment, and materials to provide power flow analysis, cross connect capability evaluation, short circuit study, protective device coordination, infrared inspections, and arc flash hazard analysis at b1000. | Air Force | Engineering and technical services | Sep 26, 2024 DoD 90d |
| W9128F23C0036 definitive contract | $1.0M | Bldg 504- design and construction repair | Army | Real property maintenance and repair | Jun 5, 2026 DoD 90d |
| FA301625F0376 delivery order | $994K | Design build project that will have a 65, 95 design review and ifc sets with the governments approval. the project is to renovate the interior and exterior of the toc at camp anderson-peters which is on jbsa-camp bullis. | Air Force | Real property maintenance and repair | Dec 30, 2025 DoD 90d |
| FA301623F0363 delivery order | $659K | Project mpyj235443 b133 repair replace cooling tower and structure | Air Force | Real property maintenance and repair | Dec 5, 2025 DoD 90d |
| FA301625F0358 delivery order | $559K | This design-build project involves expanding and upgrading a classified open storage vault in building 990 at jbsa-randolph afb. | Air Force | Real property maintenance and repair | Dec 29, 2025 DoD 90d |
| FA460024F0130 delivery order | $405K | Replace air handling unit and ac condenser, b73 | Air Force | Installation of equipment | Mar 12, 2026 DoD 90d |
| FA301625F0361 delivery order | $368K | This is a design-build requirement to construct concrete t-pad for t-1a aircraft display. work shall be accomplished in accordance with the statement of work dated 31 jul 25. | Air Force | Real property maintenance and repair | Sep 3, 2025 DoD 90d |
| FA460026F0035 delivery order | $272K | To restore the electrical and domestic water utilities to operational conditions. | Air Force | Real property maintenance and repair | Apr 27, 2026 DoD 90d |
| FA460024F0184 delivery order | $265K | General construction idiq | Air Force | Utilities | Jul 8, 2025 DoD 90d |
| FA460024F0060 delivery order | $122K | General construction idiq | Air Force | Real property maintenance and repair | Sep 24, 2024 DoD 90d |
| 70Z02825CMIAM0113 definitive contract | $87K | Contractor to remove 8 existing exterior doors and replace with new storm rated doors at cg sta lake worth inlet | U.S. Coast Guard | Real property maintenance and repair | Sep 22, 2025 |
| FA460025F0078 delivery order | $1.0K | This requirement is for the offutt afb, ne macc indefinite delivery /indefinite quantity (idiq). this requirement will be used to satisfy a diverse group of construction and design-build projects. | Air Force | Real property maintenance and repair | Aug 8, 2025 DoD 90d |
| FA301622D0019 IDIQ contract | $0 | This requirement is for the multiple award construction contract (macc), indefinite-quantity indefinite-quantity (idiq) for joint base san antonio, (jbsa) this includes decentralized task order services for laughlin afb and goodfellow afb. | Air Force | Real property maintenance and repair | May 11, 2026 DoD 90d |
| FA460024D0002 IDIQ contract | $0 | General construction idiq | Air Force | Real property maintenance and repair | Apr 17, 2025 DoD 90d |
| FA460025D0009 IDIQ contract | $0 | This requirement is for the offutt afb, ne macc indefinite delivery /indefinite quantity (idiq). this requirement will be used to satisfy a diverse group of construction and design-build projects. | Air Force | Real property maintenance and repair | Aug 8, 2025 DoD 90d |
| FA301623F0366 delivery order | -$597 | This is a design-build project, and the intent of this project is to repair the fire suppression system of building 903 on jbsa-randolph and remedy the fire safety deficiency (fsd) | Air Force | Real property maintenance and repair | Feb 5, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial