AwardTape · Defense awards · Kekolu Contracting, LLC
Kekolu Contracting, LLC: $125.0M in DoD and DHS awards
Kekolu Contracting, LLC holds 395 DoD and DHS prime awards with $125.0M obligated Oct 2, 2023 to Jun 4, 2026. Largest category: Real property maintenance and repair at $117.7M; largest buyer: Department of the Navy at $64.3M.
| Obligated FY2024+ | $125.0M |
|---|---|
| Awards | 395 |
| FY2024 | $41.9M |
| FY2025 | $71.4M |
| FY2026 to date | $11.6M |
| Lifetime obligated on these awards | $151.3M |
| First and latest action | Oct 2, 2023 · Jun 4, 2026 |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA706025F0096 delivery order | $215K | Pkb - b64lh cool or ventilate 18 classrooms and av closets iaw attached sow. | Air Force | Real property maintenance and repair | Jan 8, 2026 DoD 90d |
| FA282326F0029 delivery order | $212K | Renovate 3rd floor - building 11, eglin air force base | Air Force | Real property maintenance and repair | Feb 18, 2026 DoD 90d |
| FA286024F0074 delivery order | $211K | Renovating atc alternate tower cab (snow cab) iaw simplified acquisition of base engineer requirements (saber) statement of work, attached sow, and contractor proposal | Air Force | Real property maintenance and repair | May 15, 2025 DoD 90d |
| N4008024F4613 delivery order | $206K | Uem, bldg. 3163 repair deaerator tank. | Navy | Real property maintenance and repair | Aug 21, 2024 DoD 90d |
| FA706026F0048 delivery order | $203K | Pkb - repaint exterior trim b10, b11, b13, b15 and b41 iaw attached sow. | Air Force | Real property maintenance and repair | Apr 17, 2026 DoD 90d |
| FA706025F0080 delivery order | $202K | The upgrade of main electrical panels for building 417. | Air Force | Architect-engineering services | Mar 31, 2026 DoD 90d |
| FA282326F0045 delivery order | $202K | Repair earth covered bunker, building 9469, site c-80b | Air Force | Real property maintenance and repair | Mar 26, 2026 DoD 90d |
| FA706023F0029 delivery order | $201K | B93 life health safety repairs to egress | Air Force | New construction | Mar 27, 2025 DoD 90d |
| FA286024F0023 delivery order | $200K | In accordance with far 15.406-3(a)(1), the purpose of this negotiation is to reach a fair and reasonable price for saber project ajxf 24-2539 repair west side deluge piping leak and megalug tee. | Air Force | Real property maintenance and repair | Jun 4, 2024 DoD 90d |
| FA282325F0079 delivery order | $195K | Pziocc / ftfa 24-vh70 rpr - renovate room 107 into office/admin space b2398 | Air Force | Real property maintenance and repair | Dec 1, 2025 DoD 90d |
| N4008025F0321 delivery order | $195K | B103 replace fire side hvac units | Navy | Real property maintenance and repair | Aug 29, 2025 DoD 90d |
| N4008025F0348 delivery order | $191K | Replace one paint booth humidifier located on top of paint booth #1 in b2805. | Navy | Real property maintenance and repair | Sep 9, 2025 DoD 90d |
| FA282325F0316 delivery order | $190K | Replace outdoor playing court site c6 - 20th space control squadron | Air Force | Real property maintenance and repair | Jun 4, 2026 DoD 90d |
| FA282325F0252 delivery order | $188K | Install heating, ventilation, and air conditioning system for room 301 in building 1 | Air Force | Real property maintenance and repair | Aug 21, 2025 DoD 90d |
| N4008025F0414 delivery order | $185K | Fwf bldg 3 replace ats | Navy | Real property maintenance and repair | Sep 17, 2025 DoD 90d |
| FA286024F0043 delivery order | $178K | Remove and replace vehicle exhaust extraction system in b3355. this work includes installation of a exterior roof access ladder for maintenance. | Air Force | Real property maintenance and repair | Aug 1, 2024 DoD 90d |
| FA286022F0041 delivery order | $177K | Ajxf 22-3873 replace generator at airfield lighting vault b1207 | Air Force | Real property maintenance and repair | Sep 8, 2025 DoD 90d |
| FA286025F0085 delivery order | $176K | Removal and replacement of carpet in b3501 dining area renovation in b3501 flooring refurbishment in b3501 comsec modernization in b3500 work shall be completed iaw with the sow dated 5 sep 25 and kekolus proposal dated 26 sep 25 | Air Force | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| FA286025F0016 delivery order | $173K | Ajxf 24-7980 repair pipe wrapping ncr b3282 | Air Force | Real property maintenance and repair | Mar 10, 2025 DoD 90d |
| FA706024F0046 delivery order | $171K | Pkb - b398 hmx-1 repair roof membrane at jbab. | Air Force | Real property maintenance and repair | Apr 17, 2024 DoD 90d |
| FA282325F0050 delivery order | $170K | Repair - replace two heating, ventilation, and air conditioning package units, building 4335 | Air Force | Real property maintenance and repair | Mar 5, 2025 DoD 90d |
| FA706026F0050 delivery order | $170K | Pkb - b94 mailroom overhang removal iaw sow. | Air Force | New construction | May 13, 2026 DoD 90d |
| FA282325F0280 delivery order | $169K | Major construction - expand rv storage lot duke field | Air Force | Real property maintenance and repair | Sep 5, 2025 DoD 90d |
| N4008024F4273 delivery order | $165K | Bldg 900 replace unit #8 | Navy | Real property maintenance and repair | May 3, 2024 DoD 90d |
| FA706025F0087 delivery order | $164K | Pbk - b62 and b64 stairwell painting iaw attached sow. | Air Force | Real property maintenance and repair | Aug 13, 2025 DoD 90d |
| FA706026F0022 delivery order | $163K | Pkb - b54 hvac motor and fan replacement in accordance with the attached statement of work. | Air Force | Real property maintenance and repair | Feb 17, 2026 DoD 90d |
| FA706024F0118 delivery order | $162K | Pkb - b64lh corridor painting and bumpers with stairwell and handrail painting iaw attached sows. | Air Force | Real property maintenance and repair | Feb 13, 2025 DoD 90d |
| FA286024F0022 delivery order | $161K | The objective of the project is to remove a total of twelve (12) inches of material from the existing bldg 3807. this will be replaced with 6 inches of compacted base coarse, 4 inches of base mix asphalt followed by 2 inches of wear coarse ... | Air Force | Real property maintenance and repair | May 29, 2024 DoD 90d |
| FA706024F0125 delivery order | $161K | Pkb - b5683 replace hvac drain pan and fix area iaw attached sows. | Air Force | New construction | Sep 25, 2024 DoD 90d |
| N4008024F5046 delivery order | $160K | Building 443 replace ahu 1 | Navy | Real property maintenance and repair | Sep 19, 2024 DoD 90d |
| FA282325F0239 delivery order | $160K | Ftfa 20-ds14 install 10 ton package unit building 1245 | Air Force | Real property maintenance and repair | Aug 15, 2025 DoD 90d |
| N4008024F4382 delivery order | $159K | Option yr 2 - mech / hvac idiq | Navy | Real property maintenance and repair | Jun 20, 2024 DoD 90d |
| FA706025F0037 delivery order | $159K | Pkb - b5 urgent pipe repairs iaw attached sows. | Air Force | Real property maintenance and repair | Aug 22, 2025 DoD 90d |
| FA706022F0145 delivery order | $159K | B362 mezzanine demo and repair | Air Force | New construction | Aug 1, 2024 DoD 90d |
| FA706024F0120 delivery order | $157K | Pkb - air force memorial replace generator and fence deck replacement iaw attached sows. | Air Force | Installation of equipment | Sep 19, 2024 DoD 90d |
| FA282325F0116 delivery order | $157K | Ftfa 24-fp29 install 600 amp exterior panel shore power receptacles | Air Force | Real property maintenance and repair | Sep 5, 2025 DoD 90d |
| FA282325F0297 delivery order | $151K | Ftfa 25-cb35 bldg 858 chiller replacement | Air Force | Real property maintenance and repair | Sep 9, 2025 DoD 90d |
| FA286024F0019 delivery order | $149K | Ajxf 24-1325-replace fuel exhaust ventilation system b3629. kekolus exclusions on the third page of their proposal in attachment 4 applies to this requirement. | Air Force | Real property maintenance and repair | Mar 28, 2025 DoD 90d |
| FA286026F0003 delivery order | $145K | Replace and repair the middle stairwell in building 1624. | Air Force | Real property maintenance and repair | Feb 11, 2026 DoD 90d |
| FA286025F0083 delivery order | $137K | The contractor shall perform remediation of the interior mold, damaged ceiling tiles, piping insulation and fcu component. all work to be performed at building 1602 at joint base andrews, maryland. | Air Force | Real property maintenance and repair | Mar 2, 2026 DoD 90d |
| FA286024F0071 delivery order | $136K | This requirement is to install the infrastructure for two (2) charging stations for electric vehicle (ev) tugs located at building 3640. | Air Force | Real property maintenance and repair | Sep 27, 2024 DoD 90d |
| FA286024F0058 delivery order | $135K | This requirement is to upgrade hvac systems in building 3188. | Air Force | Real property maintenance and repair | Mar 12, 2025 DoD 90d |
| FA282326F0033 delivery order | $132K | Ftfa25cb69 replace tail door corrosion b72 | Air Force | Real property maintenance and repair | Mar 16, 2026 DoD 90d |
| FA286022F0036 delivery order | $128K | Repair/ replace papi lights | Air Force | Real property maintenance and repair | Mar 18, 2025 DoD 90d |
| N0017424F0290 delivery order | $128K | Facility modifications | Navy | Real property maintenance and repair | Mar 13, 2025 DoD 90d |
| N0017425F0024 delivery order | $127K | 1467 air compressor installation at the nswc indian head division, md. in accordance with (iaw) the request forproposal the contractor shall provide all necessary labor, equipment, material, and supervision to complete this project. | Navy | Real property maintenance and repair | Aug 8, 2025 DoD 90d |
| N4008025F0068 delivery order | $126K | Repair & refufbish n0.1 heating converte | Navy | Real property maintenance and repair | Jul 9, 2025 DoD 90d |
| FA286025F0031 delivery order | $124K | Mold remediation at bldg 1417, presidential airlift group/sere training center. work is to be completed iaw the saber sow, task order sow, and ktr proposal. | Air Force | Real property maintenance and repair | May 27, 2025 DoD 90d |
| FA286025F0062 delivery order | $124K | The purpose of this award is to certify and reactivate the existing clean agent system in room 13 in building 1558. all assumptions, clarifications, and exclusions in kekolus proposal are accepted. | Air Force | Real property maintenance and repair | Mar 24, 2026 DoD 90d |
| FA282325F0335 delivery order | $121K | Upgrade transformer connections building 9628 | Air Force | Real property maintenance and repair | Sep 19, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial