Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Jaxon Engineering and Maintenance LLC

Jaxon Engineering and Maintenance LLC: $3.5M in DoD and DHS awards

Jaxon Engineering and Maintenance LLC holds 5 DoD and DHS prime awards with $3.5M obligated Apr 18, 2024 to Oct 30, 2025. Largest category: Engineering and technical services at $1.7M; largest buyer: Department of the Army at $1.8M.

Obligated FY2024+$3.5M
Awards5
FY2024$1.8M
FY2025$1.7M
FY2026 to date$0
Lifetime obligated on these awards$3.9M
First and latest actionApr 18, 2024 · Oct 30, 2025
By categoryObligated FY2024+
#CategoryObligated FY2024+AwardsShare
1Engineering and technical services$1.7M2 awards49%
2Power generation and distribution$1.7M1 awards48%
3Architect-engineering services$104K2 awards3.0%
By agencyObligated FY2024+
#AgencyObligated FY2024+AwardsShare
1Department of the Army$1.8M3 awards51%
2Department of the Air Force$1.7M2 awards49%
Largest awards50 per page · sorted by obligated
AwardObligated FY2024+WhatAgencyCategoryLatest action
W911QX25PA088
purchase order
$1.7MHigh altitude electromagnetic pulse (hemp) generator shelterArmyPower generation and distributionSep 15, 2025
DoD 90d
FA251824F0051
delivery order
$1.3MHemp re-verification testing for schriever sfb and conus siteAir ForceEngineering and technical servicesOct 30, 2025
DoD 90d
FA251824F0019
delivery order
$457KPerform verification/re-verification testing (v-testing) and hardness sustainment of the site/systems at cheyenne mountain space force station (cmsfs) usstratcom hemp re-certification.Air ForceEngineering and technical servicesSep 4, 2024
DoD 90d
W911KB24F0061
delivery order
$280KClr033aa lrdr campus hemp bridge, clear space force station, alaskaArmyArchitect-engineering servicesMay 2, 2024
DoD 90d
W911KB23F0134
delivery order
-$176KClr033aa lrdr campus hemp hardness maintenance/surveillance (hm/hs) clear space force station, alaska task 1 & 2ArmyArchitect-engineering servicesApr 18, 2024
DoD 90d

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.

Terminal: filters, alerts and CSV export for this company's awards.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial