AwardTape · Defense awards · Head, LLC
Head, LLC: $35.4M in DoD and DHS awards
Head, LLC holds 11 DoD and DHS prime awards with $35.4M obligated Nov 24, 2023 to May 29, 2026. Largest category: New construction at $24.8M; largest buyer: Department of the Army at $35.3M.
| Obligated FY2024+ | $35.4M |
|---|---|
| Awards | 11 |
| FY2024 | $13.2M |
| FY2025 | $17.8M |
| FY2026 to date | $4.3M |
| Lifetime obligated on these awards | $49.7M |
| First and latest action | Nov 24, 2023 · May 29, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | New construction | $24.8M | 7 awards | 70% |
| 2 | Real property maintenance and repair | $10.6M | 4 awards | 30% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Army | $35.3M | 10 awards | 100% |
| 2 | Department of the Air Force | $70K | 1 awards | 0.2% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W50S9525C0001 definitive contract | $9.8M | Repair & widen taxiway phase ii | Army | Real property maintenance and repair | Apr 17, 2026 DoD 90d |
| W50S9524C0001 definitive contract | $9.7M | Pste 159098 construct hazardous cargo pad on mcentire jngb, eastover south carolina. construction includes grading, compaction, site preparation, base coarse installation, asphalt installation, painting, and limited electrical work. | Army | New construction | May 15, 2025 DoD 90d |
| W9128F25FA194 delivery order | $6.5M | Repair hardstands around buildings 2792, 2992, 3092, and 3292 at fort carson, co | Army | New construction | May 1, 2026 DoD 90d |
| W9128F24F0003 delivery order | $3.2M | Maslr | Army | New construction | Aug 14, 2025 DoD 90d |
| W9128F25FA029 delivery order | $2.6M | This project will repair the existing asphalt pavement by crack sealing and selective mill/overlay. taxiway a will be milled and overlaid with 2-inches of acc. | Army | New construction | May 9, 2025 DoD 90d |
| W9128F25FA180 delivery order | $1.8M | Currently installed airfield lighting includes halogen and incandescent airfield lighting fixtures at locations on the heliport, they will be removed and replaced with new led fixtures. | Army | New construction | May 29, 2026 DoD 90d |
| W9128F25FA165 delivery order | $1.0M | Repair parking lots at building 2355, building 2357, and building 2359 to include full depth replacement of asphalt as well as allowances for curb and gutter repair ft. carson co. w59xqg52470330 | Army | New construction | Oct 22, 2025 DoD 90d |
| W912QG23C0002 definitive contract | $617K | Repair and widen primary taxiway. remove existing substandard concrete and asphaltic pavement on taxiway a, starting between taxiways e and f and ending at south edge of runway on taxiway h. | Army | Real property maintenance and repair | Jan 15, 2025 DoD 90d |
| FA309923C0006 definitive contract | $70K | This project is for repair by mill and overlay several sections of the overruns on the center runway to include edge lighting to bring IT up to current standards | Air Force | Real property maintenance and repair | Jan 21, 2025 DoD 90d |
| W50S9525CA001 definitive contract | $61K | The 169th fighter wing requires a contractor to seal cracks and joints on airfield pavement. contractor will furnish all necessary material, equipment, labor, msdss, tools, and transportation needed to accomplish this work at mcentire jngb. | Army | Real property maintenance and repair | May 8, 2025 DoD 90d |
| W9128F23D0009 IDIQ contract | $0 | Base period - afp sb matoc (4 years) | Army | New construction | May 6, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial