AwardTape · Defense awards · Gf-D Design Partners JV
Gf-D Design Partners JV: $23.8M in DoD and DHS awards
Gf-D Design Partners JV holds 21 DoD and DHS prime awards with $23.8M obligated Nov 28, 2023 to Mar 31, 2026. Largest category: Architect-engineering services at $23.8M; largest buyer: Department of the Army at $23.8M.
| Obligated FY2024+ | $23.8M |
|---|---|
| Awards | 21 |
| FY2024 | $12.6M |
| FY2025 | $8.1M |
| FY2026 to date | $3.1M |
| Lifetime obligated on these awards | $33.4M |
| First and latest action | Nov 28, 2023 · Mar 31, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Architect-engineering services | $23.8M | 21 awards | 100% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Army | $23.8M | 21 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W912DR25F0189 delivery order | $4.3M | Susquehanna microgrid and power generation defense distribution center architect - engineer services | Army | Architect-engineering services | Mar 12, 2026 DoD 90d |
| W912DR24F0223 delivery order | $2.6M | Project management support | Army | Architect-engineering services | Jul 23, 2025 DoD 90d |
| W912DR22F0272 delivery order | $2.5M | Task 3: concept (35%) design | Army | Architect-engineering services | Feb 21, 2025 DoD 90d |
| W912DR24F0086 delivery order | $2.3M | Architect-engineer (a/e) services preparation of complete design documents for the design-bid-build (dbb) of venona road widening project, fort meade, md | Army | Architect-engineering services | Jan 29, 2026 DoD 90d |
| W912DR24F0423 delivery order | $2.1M | Jba east paving pcr ii | Army | Architect-engineering services | Oct 31, 2025 DoD 90d |
| W912DR24F0341 delivery order | $1.6M | Repair dormitory building 417, joint base anacostia-bolling, washington dc, fy26 | Army | Architect-engineering services | Sep 25, 2025 DoD 90d |
| W912DR24F0088 delivery order | $1.6M | Electrical engineering svc, buckley afb, co | Army | Architect-engineering services | Jan 15, 2026 DoD 90d |
| W912DR25FA030 delivery order | $1.4M | Field investigations, surveying, analysis, and design for shoreline restoration of reaches i and ii at the blossom point research facility in charles county, md. | Army | Architect-engineering services | Jul 28, 2025 DoD 90d |
| W912DR23F0232 delivery order | $1.0M | Sr. pm services (base year 1) | Army | Architect-engineering services | May 20, 2025 DoD 90d |
| W912DR23F0149 delivery order | $925K | Design-bid-build (dbb) acquisition of jmmf & access control point | Army | Architect-engineering services | Sep 29, 2025 DoD 90d |
| W912DR24F0389 delivery order | $844K | Barc building assessments task order | Army | Architect-engineering services | Jun 25, 2025 DoD 90d |
| W912DR25F0151 delivery order | $631K | Naval research laboratory roof replacements buildings 30, 52, 54, 60, 226 | Army | Architect-engineering services | Mar 31, 2026 DoD 90d |
| W912DR24F0329 delivery order | $622K | Potable water distribution letterkenny ARMY depot, pa fy25, ummca | Army | Architect-engineering services | Feb 27, 2026 DoD 90d |
| W912DR22F0175 delivery order | $606K | Qa support at tcc | Army | Architect-engineering services | Jul 29, 2025 DoD 90d |
| W912DR24F0385 delivery order | $570K | Microgrid unspecified minor military construction ARMY (ummca), letterkenny ARMY depot, pa | Army | Architect-engineering services | Sep 27, 2024 DoD 90d |
| W912DR25FA049 delivery order | $438K | In general terms, the project consists of preparing design-bid-build contract documents in accordance with dd form 1391 and design directive dated 24 jan 2025. | Army | Architect-engineering services | Sep 26, 2025 DoD 90d |
| W912DR22F0051 delivery order | $32K | Mcmillian north clearwell replacement | Army | Architect-engineering services | Mar 31, 2026 DoD 90d |
| W912DR20D0003 IDIQ contract | $0 | Multi-discipline architect-engineer design multiple award single award task order contract (satoc) | Army | Architect-engineering services | Sep 17, 2025 DoD 90d |
| W912DR20F0431 delivery order | -$37K | Preparation of a request for proposal (rfp) for the design-build (db) acquisition of building 59 hvac and fire alarm upgrades | Army | Architect-engineering services | Jan 8, 2024 DoD 90d |
| W912DR22F0328 delivery order | -$112K | Task 3 - charrette report & dd1391 | Army | Architect-engineering services | Aug 21, 2025 DoD 90d |
| W912DR23F0240 delivery order | -$262K | Odni ncr real estate support services | Army | Architect-engineering services | Sep 6, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial