Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · GE Energy Power Conversion Naval Systems Inc

GE Energy Power Conversion Naval Systems Inc: $34.5M in DoD and DHS awards

GE Energy Power Conversion Naval Systems Inc holds 16 DoD and DHS prime awards with $34.5M obligated Oct 31, 2023 to May 20, 2026. Largest category: Defense systems R&D at $18.1M; largest buyer: Department of the Navy at $34.7M.

Obligated FY2024+$34.5M
Awards16
FY2024$8.7M
FY2025$24.2M
FY2026 to date$1.6M
Lifetime obligated on these awards$65.1M
Parent company (as reported)GE Energy Power Conversion Naval Systems Inc
First and latest actionOct 31, 2023 · May 20, 2026
By categoryObligated FY2024+
#CategoryObligated FY2024+AwardsShare
1Defense systems R&D$18.1M4 awards52%
2Engineering and technical services$12.1M10 awards35%
3Combat ships and landing vessels$4.6M1 awards13%
4Ship and marine equipment-$200K1 awards-0.6%
By agencyObligated FY2024+
#AgencyObligated FY2024+AwardsShare
1Department of the Navy$34.7M15 awards101%
2Defense Contract Management Agency-$200K1 awards-0.6%
Largest awards50 per page · sorted by obligated
AwardObligated FY2024+WhatAgencyCategoryLatest action
N0001424C1320
definitive contract
$16.2MThe purpose of this effort is to develop, test, and validate an 8mw hybrid modular multilevel converter (hmmc) prototype demonstrator targeted for NAVY / marine propulsion applications.NavyDefense systems R&DJun 30, 2025
DoD 90d
N6449825F4539
delivery order
$6.5MTask order award n6449825f4539 in the amount of $8,269,017.14. period of performance is 15 august 2025 through 14 august 2027.NavyEngineering and technical servicesFeb 25, 2026
DoD 90d
N0002425C4112
definitive contract
$4.6MTactical energy management controllerNavyCombat ships and landing vesselsSep 25, 2025
DoD 90d
N6449823F4100
delivery order
$4.5MEngineering and technical services in support of the electric drive test facilityNavyEngineering and technical servicesAug 14, 2025
DoD 90d
N6449824F4047
delivery order
$1.8MGe to-20NavyEngineering and technical servicesDec 22, 2023
DoD 90d
N0001425C1304
definitive contract
$1.5MThe proposed baseline effort will design and build one cbese module (gen 1) following the feasibility study of the predecessor contract. the proposal also includes two options, if exercised, will validate additional two prototypes gen 2 ...NavyDefense systems R&DMay 8, 2025
DoD 90d
N0001424C1308
definitive contract
$376KFeasibility study of composite battery energy storage enclosure for naval applicationsNavyDefense systems R&DJun 25, 2024
DoD 90d
N0001418C1051
definitive contract
$0Modular and scalable 1 kvdc - 4160 vac pebb converter for shipboard demonstrationNavyDefense systems R&DJul 16, 2024
DoD 90d
N6449819D4005
IDIQ contract
$0Engineering and technical services in support of the energy recirculation system at the naval surface warfare center philadelphia division.NavyEngineering and technical servicesMar 31, 2025
DoD 90d
N6449825D4009
IDIQ contract
$0Award of base idiq contract n6449825d4009 for technical and engineering services in support of the ctf ers.NavyEngineering and technical servicesApr 20, 2026
DoD 90d
N6449819F4054
delivery order
-$400LaborNavyEngineering and technical servicesApr 25, 2024
DoD 90d
N6449822F4178
delivery order
-$31KFunding for clin 0001NavyEngineering and technical servicesMay 19, 2026
DoD 90d
N6449821F4077
delivery order
-$72KOdcsNavyEngineering and technical servicesMar 20, 2025
DoD 90d
N0002412C4208
definitive contract
-$200KEngineering servicesDefense Contract Management AgencyShip and marine equipmentAug 6, 2024
DoD 90d
N6449821F4065
delivery order
-$244KLaborNavyEngineering and technical servicesMay 8, 2025
DoD 90d
N6449822F4197
delivery order
-$401KFunding for clin 0001 laborNavyEngineering and technical servicesMay 20, 2026
DoD 90d

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.

Terminal: filters, alerts and CSV export for this company's awards.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial