Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Garco Construction, Inc

Garco Construction, Inc: $143.2M in DoD and DHS awards

Garco Construction, Inc holds 7 DoD and DHS prime awards with $143.2M obligated Nov 1, 2023 to May 15, 2026. Largest category: New construction at $120.8M; largest buyer: Department of the Army at $89.7M.

Obligated FY2024+$143.2M
Awards7
FY2024$137.9M
FY2025$3.5M
FY2026 to date$1.8M
Lifetime obligated on these awards$244.5M
Parent company (as reported)Garco Construction, Inc
First and latest actionNov 1, 2023 · May 15, 2026
By categoryObligated FY2024+
#CategoryObligated FY2024+AwardsShare
1New construction$120.8M4 awards84%
2Facility operations$20.0M1 awards14%
3Architect-engineering services$1.7M1 awards1.2%
4Real property maintenance and repair$657K1 awards0.5%
By agencyObligated FY2024+
#AgencyObligated FY2024+AwardsShare
1Department of the Army$89.7M5 awards63%
2Department of the Navy$53.4M2 awards37%
Largest awards50 per page · sorted by obligated
AwardObligated FY2024+WhatAgencyCategoryLatest action
N4425524C6000
definitive contract
$51.7MMcon p2002 construction of tank farm improvements, flcps manchester, manchester, washingtonNavyNew constructionAug 19, 2025
DoD 90d
W912DW24C0021
definitive contract
$50.8MConstruct consolidated total force integration (tfi) base operations facility, fairchild air force base, spokane, wa.ArmyNew constructionMay 15, 2026
DoD 90d
W912QR24C0005
definitive contract
$20.0MD/b/b yakima equipment concentration site warehouseArmyFacility operationsMay 7, 2026
DoD 90d
W912DW21C0007
definitive contract
$18.3MFuel hydrant repair services, fairchild, waArmyNew constructionAug 5, 2025
DoD 90d
N4425521C1006
definitive contract
$1.7MConstruction of p856 manchester tank farm improvements, manchester, waNavyArchitect-engineering servicesAug 14, 2025
DoD 90d
W912QR21C0019
definitive contract
$657KWpafb DLA fuel hydrant system replacement - base and all options are accepted. at this time, the base and options 4 and 5 being funded.ArmyReal property maintenance and repairMay 27, 2025
DoD 90d
W912DW23C0021
definitive contract
$0Cjd ph passenger and freight elevator replacement.ArmyNew constructionNov 30, 2023
DoD 90d

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.

Terminal: filters, alerts and CSV export for this company's awards.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial