AwardTape · Defense awards · Edl Construction Inc
Edl Construction Inc: $18.7M in DoD and DHS awards
Edl Construction Inc holds 20 DoD and DHS prime awards with $18.7M obligated Oct 13, 2023 to Jun 3, 2026. Largest category: Prefabricated structures at $17.0M; largest buyer: Department of the Air Force at $17.6M.
| Obligated FY2024+ | $18.7M |
|---|---|
| Awards | 20 |
| FY2024 | $18.0M |
| FY2025 | $428K |
| FY2026 to date | $255K |
| Lifetime obligated on these awards | $22.9M |
| First and latest action | Oct 13, 2023 · Jun 3, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Prefabricated structures | $17.0M | 3 awards | 91% |
| 2 | Quality control, testing and inspection | $1.0M | 8 awards | 5.5% |
| 3 | Engineering and technical services | $249K | 1 awards | 1.3% |
| 4 | Real property maintenance and repair | $180K | 5 awards | 1.0% |
| 5 | Aircraft and engine maintenance | $157K | 2 awards | 0.8% |
| 6 | Installation of equipment | $0 | 1 awards | 0.0% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $17.6M | 9 awards | 94% |
| 2 | Department of the Army | $1.1M | 11 awards | 5.6% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA500024F0077 delivery order | $16.7M | Design and assembly of four new, heated pre-engineered buildings iaw the statements of work. | Air Force | Prefabricated structures | Jan 13, 2026 DoD 90d |
| W9124B24P0017 purchase order | $474K | Install of overhang structure | Army | Quality control, testing and inspection | Aug 23, 2024 DoD 90d |
| FA480022P0001 purchase order | $286K | Aircraft metal sunshade inspection, maintenance, and repairs | Air Force | Quality control, testing and inspection | Nov 25, 2025 DoD 90d |
| FA480323F0038 delivery order | $249K | Aircraft sunshade structural inspection | Air Force | Engineering and technical services | May 8, 2026 DoD 90d |
| FA930224F0124 delivery order | $186K | Equipment shelter for 412 ewg testing equipment. | Air Force | Prefabricated structures | Feb 7, 2025 DoD 90d |
| W50S6Y24F0002 delivery order | $129K | 80x40x20 metal sunshade structure to be built on munitions conveyer assembly pad. | Army | Prefabricated structures | Nov 16, 2023 DoD 90d |
| W50SLF24F0007 delivery order | $119K | Inspection services of fifteen each f22 sunshades | Army | Real property maintenance and repair | Jan 20, 2026 DoD 90d |
| W50S6T24FA010 delivery order | $111K | Semiannual inspections of 144fw sunshades (aircraft shelters). | Army | Quality control, testing and inspection | Feb 24, 2026 DoD 90d |
| FA462524F0049 delivery order | $79K | Repair and maintenance of 442nd sun shades. | Air Force | Aircraft and engine maintenance | Aug 8, 2024 DoD 90d |
| FA462525C0017 definitive contract | $79K | Sunshade inspection and recertification. | Air Force | Aircraft and engine maintenance | Sep 10, 2025 DoD 90d |
| W912BU24P0020 purchase order | $61K | Fy24 bml replace storage barn | Army | Real property maintenance and repair | Jun 25, 2024 DoD 90d |
| W50S6Y21P0010 purchase order | $37K | Annual aircraft sunshade inspection | Army | Quality control, testing and inspection | Jul 19, 2024 DoD 90d |
| W50S8525CA001 definitive contract | $36K | Sun shade inspections | Army | Quality control, testing and inspection | Jun 3, 2026 DoD 90d |
| W50S8520P0020 purchase order | $36K | A-10 shelter sun shade inspection | Army | Quality control, testing and inspection | May 23, 2024 DoD 90d |
| W50S7W24PA014 purchase order | $24K | Inspecting all structural supports, the anchoring system, re-torque, lighting, electrical system, re-certifying the sunshades, documentation, make minor repairs as required and re-instate the manufacturers warranty on the entire structure. | Army | Quality control, testing and inspection | Sep 5, 2024 DoD 90d |
| W50S7W25FA005 delivery order | $24K | Preventative maintenance and inspection services for the 122d fw fighter sunshade. | Army | Quality control, testing and inspection | Aug 7, 2025 DoD 90d |
| FA500023F0116 delivery order | $0 | Design and assembly of a pre-engineered building and site prep | Air Force | Real property maintenance and repair | Mar 19, 2024 DoD 90d |
| FA500023F0117 delivery order | $0 | Install pre-engineered building at camp mad bull | Air Force | Real property maintenance and repair | Apr 10, 2024 DoD 90d |
| FA500023F0118 delivery order | $0 | Install pre engineered building camp mad bull #2 | Air Force | Real property maintenance and repair | Apr 10, 2024 DoD 90d |
| W50S6Y23P0009 purchase order | $0 | The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, to design, manage, and construct a communication infrastructure and electrical power project at 125fw, jacksonville, fl. | Army | Installation of equipment | Apr 18, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial