AwardTape · Defense awards · Doyon Management Services, LLC
Doyon Management Services, LLC: $123.7M in DoD and DHS awards
Doyon Management Services, LLC holds 50 DoD and DHS prime awards with $123.7M obligated Oct 31, 2023 to Sep 28, 2026. Largest category: Real property maintenance and repair at $106.1M; largest buyer: Department of the Navy at $63.3M.
| Obligated FY2024+ | $123.7M |
|---|---|
| Awards | 50 |
| FY2024 | $39.8M |
| FY2025 | $48.2M |
| FY2026 to date | $35.6M |
| Lifetime obligated on these awards | $176.0M |
| First and latest action | Oct 31, 2023 · Sep 28, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $106.1M | 36 awards | 86% |
| 2 | New construction | $17.5M | 13 awards | 14% |
| 3 | Installation of equipment | $141K | 1 awards | 0.1% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Navy | $63.3M | 28 awards | 51% |
| 2 | U.S. Coast Guard | $33.0M | 7 awards | 27% |
| 3 | Department of the Army | $21.6M | 9 awards | 17% |
| 4 | Department of the Air Force | $5.7M | 6 awards | 4.6% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| 70Z08725FKODI0001 delivery order | $19.8M | Major repair and renovation building n1 on base kodiak | U.S. Coast Guard | Real property maintenance and repair | Sep 28, 2026 |
| 70Z08724FKODI0002 delivery order | $12.1M | Demo wharf at base kodiak, ak | U.S. Coast Guard | Real property maintenance and repair | Jul 14, 2026 |
| W912DW21C0023 definitive contract | $11.7M | Repair bldg 09175 | Army | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| N4425526F0150 delivery order | $8.9M | This project will refurbish the main dewatering pumps (mdp) #1 and #2 and replace mdp2s associated check and discharge valves and operators in pumpwell 5 (pw5) of drydock 5 (dd5). the mdps pump out seawater to empty the flooded drydock. | Navy | Real property maintenance and repair | May 14, 2026 DoD 90d |
| N4425526F0093 delivery order | $6.2M | This project will replace drainage pump 3, dp3 starter, supporting structure, associated discharge piping and piping components and associated valves in pumpwell 6 of drydock 6. | Navy | Real property maintenance and repair | Mar 10, 2026 DoD 90d |
| N4425526F0031 delivery order | $5.6M | Procure and install relocatable buildings, farragut, b850 | Navy | New construction | Feb 18, 2026 DoD 90d |
| FA820126F0062 delivery order | $5.1M | Bldg 265 replace roof | Air Force | Real property maintenance and repair | Feb 23, 2026 DoD 90d |
| N4425525F4108 delivery order | $4.6M | Replace uh roof, b942 bremerton | Navy | Real property maintenance and repair | Mar 3, 2026 DoD 90d |
| N4425525F0231 delivery order | $4.0M | This project is a firm fixed-price, design-build (db) construction contract to demolish the existing open-circuit cooling towers and heat exchangers and replace them with new closed circuit systems that will service building 6500 bangor. | Navy | Real property maintenance and repair | Sep 11, 2025 DoD 90d |
| N4425525F4012 delivery order | $4.0M | Replace hvac system at icpb, phase 2, building 6589, naval base kitsap, washington | Navy | Real property maintenance and repair | Dec 11, 2024 DoD 90d |
| N4425524F4295 delivery order | $3.6M | No description on the record | Navy | Real property maintenance and repair | Dec 11, 2025 DoD 90d |
| N4425524F4331 delivery order | $3.6M | 15654663, replace all roof sections, b78, psns | Navy | Real property maintenance and repair | Jul 31, 2024 DoD 90d |
| W912DW24F2071 delivery order | $2.8M | Building addition, bldg. 3459 | Army | New construction | Sep 27, 2024 DoD 90d |
| N4425525F0207 delivery order | $2.8M | Renovate cnsgnw offices, b-13910, marysville | Navy | Real property maintenance and repair | Apr 29, 2026 DoD 90d |
| W912DY24F0527 delivery order | $2.7M | Jblm madigan gate installation elect | Army | New construction | Jul 28, 2025 DoD 90d |
| N4425525F4022 delivery order | $2.6M | Firm-fixed-price for all labor, materials, equipment, and associated costs for a design-build project to modernize the control system and electrical components for one 100-ton rated top running bridge type multiple girder electric ... | Navy | New construction | Feb 5, 2026 DoD 90d |
| N4425524F4222 delivery order | $2.6M | Replace hvac system at swfpac icpb building #6589, phase 1 | Navy | Real property maintenance and repair | Sep 12, 2024 DoD 90d |
| N4425526F0096 delivery order | $2.5M | Replace hvac system icpb ph 3 b6589 naval base kitsap bangor, washington | Navy | Real property maintenance and repair | Mar 12, 2026 DoD 90d |
| W912DW24F2053 delivery order | $2.1M | Repair hvac, ddc, and lighting | Army | New construction | Dec 8, 2025 DoD 90d |
| N4425525F0218 delivery order | $2.1M | Demolish the existing ductwork in the cleaning room and system exhaust fan and replace them with ten new exhaust fans that will service separate sink and work bench hoods. | Navy | Real property maintenance and repair | Aug 26, 2025 DoD 90d |
| N4425524F4354 delivery order | $2.1M | 22560355, replace existing roof systems, bldgs. 7415, 7419, 7425, 7428, nbk-bangor | Navy | Real property maintenance and repair | Aug 13, 2024 DoD 90d |
| N4425524F4419 delivery order | $1.9M | Replace roof on uh building 2207 and 2720 bangor plaza, naval base kitsap, bangor, washington | Navy | Real property maintenance and repair | Jan 31, 2025 DoD 90d |
| W912DW24F2065 delivery order | $1.8M | Construction of a playground | Army | Real property maintenance and repair | Dec 8, 2025 DoD 90d |
| N4425524F4351 delivery order | $1.8M | X005 6051388 msr #22159444_1778949 -- (ih-db_22159444) support installation of carousels multiple buildings | Navy | Real property maintenance and repair | May 1, 2026 DoD 90d |
| N4008526F0864 delivery order | $1.1M | Data concentrator shed restoration, naval station norfolk, norfolk, virginia | Navy | New construction | May 5, 2026 DoD 90d |
| 70Z08724FKODI0016 delivery order | $1.1M | Kodiak fender piles repair fy24 | U.S. Coast Guard | Real property maintenance and repair | Feb 3, 2025 |
| N4425525F0022 delivery order | $1.1M | This task order is to replace damaged saltwater pump 8 controls with like-in-kind, replace control cabinet with nema 4x rated, replace vfd motor starter with like-in-kind | Navy | Real property maintenance and repair | Mar 6, 2026 DoD 90d |
| N4425524F4339 delivery order | $846K | 22208162, complete built-up roof replacement b12, nbk manchester | Navy | Real property maintenance and repair | Sep 25, 2025 DoD 90d |
| N4425520C5001 definitive contract | $616K | Electrical improvements and repair to substation 1, naval base kitsap, bangor, washington | Navy | Real property maintenance and repair | Jan 30, 2026 DoD 90d |
| N4425525F0232 delivery order | $468K | Replace gutters and downspouts in building 2026 | Navy | Real property maintenance and repair | Jan 16, 2026 DoD 90d |
| FA820122F0304 delivery order | $429K | Repair east apron b5009 phase d | Air Force | Real property maintenance and repair | Mar 5, 2025 DoD 90d |
| W912DW26FA011 delivery order | $385K | Airfield bridge security device | Army | New construction | Dec 19, 2025 DoD 90d |
| N4425525F4100 delivery order | $260K | 8(a) idiq nse aor | Navy | Real property maintenance and repair | Mar 12, 2025 DoD 90d |
| N4425525F4203 delivery order | $141K | 8(a) idiq nse aor | Navy | Installation of equipment | Mar 19, 2025 DoD 90d |
| FA462624F0045 delivery order | $122K | This requirement consists of running fiber optic cables from building 145 to 1082. | Air Force | Real property maintenance and repair | Apr 11, 2024 DoD 90d |
| FA462623F0036 delivery order | $104K | Upgrade communication cables between building 145 and building 500. | Air Force | Real property maintenance and repair | Aug 28, 2024 DoD 90d |
| 70Z08725FKODI0004 delivery order | $37K | Casrep remove damaged cargo piles from cutter berth | U.S. Coast Guard | Real property maintenance and repair | Nov 15, 2024 |
| N4008524F6712 delivery order | $5.0K | Minimum guarantee doyon management services | Navy | New construction | Sep 26, 2024 DoD 90d |
| N4425524F4402 delivery order | $1.0K | Idiq contract - minimum guarantee | Navy | Real property maintenance and repair | Sep 12, 2024 DoD 90d |
| 70Z08718DPJT24100 IDIQ contract | $0 | Region 17 regional multiple award construction contract (rmacc) award | U.S. Coast Guard | Real property maintenance and repair | Jul 9, 2026 |
| 70Z08724DJUNE0002 IDIQ contract | $0 | Rmacc bridge contract | U.S. Coast Guard | Real property maintenance and repair | Aug 14, 2026 |
| 70Z08724FJUNE0006 delivery order | $0 | Rmacc bridge contract minimum guarantee | U.S. Coast Guard | Real property maintenance and repair | Oct 23, 2024 |
| FA462620D0010 IDIQ contract | $0 | This requirement is for the malmstrom afb multiple award task order contract (matoc) indefinite delivery/indefinite quantity (idiq). the total aggregate maximum amount expendable under the entire matoc lifecycle shall not exceed ... | Air Force | Real property maintenance and repair | May 7, 2025 DoD 90d |
| FA820122D0013 IDIQ contract | $0 | Multiple award construction contract (macc) iv for hill afb, tenant units, and utah air national guard. the task orders issued under the contract will provide various construction services for sustainment, maintenance, and new construction. | Air Force | Real property maintenance and repair | May 28, 2025 DoD 90d |
| N4008524D2504 IDIQ contract | $0 | Macc waterfront con projects - base yr | Navy | New construction | Sep 25, 2025 DoD 90d |
| N4425523D1604 IDIQ contract | $0 | Navfac northwest 8(a) macc | Navy | New construction | Jan 29, 2026 DoD 90d |
| N4425524D7000 IDIQ contract | $0 | 8(a) idiq nse aor | Navy | Real property maintenance and repair | Sep 22, 2024 DoD 90d |
| W912DW19D1003 IDIQ contract | $0 | $175m 8(a) matoc multi-disciplinary maintenance, repair, construction and incidental design work for joint base lewis mcchord (jblm) its sub-installations and other customers supported within the usace seattle district | Army | New construction | Apr 23, 2025 DoD 90d |
| W912DY21D0094 IDIQ contract | $0 | Access control point design build. this is an indefinite delivery indefinite quantity (idiq) multiple award task order contract (matoc). | Army | New construction | Aug 18, 2025 DoD 90d |
| W912DW23C0006 definitive contract | -$1.3K | Agricultural research service (ars)/national clonal germplasm repository is located at the lewis brown research farm in corvallis, oregon. main projects include replace 6 screen houses, construct gutter, renovate green houses 1,2,3 and 4. | Army | New construction | May 14, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial