AwardTape · Defense awards · Defense Systems and Solutions
Defense Systems and Solutions: $1.6B in DoD and DHS awards
Defense Systems and Solutions holds 293 DoD and DHS prime awards with $1.6B obligated Oct 3, 2023 to Jun 4, 2026. Largest category: Rotary wing aircraft at $1.3B; largest buyer: Department of the Army at $1.6B.
| Obligated FY2024+ | $1.6B |
|---|---|
| Awards | 293 |
| FY2024 | $546.5M |
| FY2025 | $673.1M |
| FY2026 to date | $341.1M |
| Lifetime obligated on these awards | $3.0B |
| First and latest action | Oct 3, 2023 · Jun 4, 2026 |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W58RGZ26F0007 delivery order | $10.1M | Contractor and engineering and technical (cets) support to rsaf at dhahran, tabuk, taif, riyadh and khamis in the ksa, for assessing and addressing logistics and maintenance services to assist the rsaf in repair and sustainment of f-15sa ... | Army | Rotary wing aircraft | Mar 26, 2026 DoD 90d |
| W58RGZ24F0225 delivery order | $10.0M | The personnel, materials, facilities, services, and support required to design, modify, verify, and document system performance and airworthiness to deliver utility helicopter (uh)-60m aircraft in the unique configuration for the slovak ... | Army | Rotary wing aircraft | Jun 4, 2026 DoD 90d |
| W58RGZ24F0087 delivery order | $9.9M | Ch-47 engine enhancement program. | Army | Rotary wing aircraft | May 30, 2026 DoD 90d |
| W58RGZ22F0212 delivery order | $9.4M | Personnel, materials, facilities, and services required to modify, verify, document, and deliver uh-60m aircraft in the unique republic of lithuania configuration. | Army | Rotary wing aircraft | Apr 23, 2026 DoD 90d |
| W58RGZ23F0128 delivery order | $8.4M | This sow defines the requirement for engineering and technical support for the h-60m federated advanced navigational system (fans). | Army | Rotary wing aircraft | Apr 21, 2026 DoD 90d |
| W58RGZ26F0092 delivery order | $8.3M | Next generation (nextgen) agricultural global positioning system (ag-gps) and the paratroop door & power modification | Army | Rotary wing aircraft | Jan 6, 2026 DoD 90d |
| W58RGZ24F0302 delivery order | $8.2M | Corpus christi ARMY depot (ccad) engine test cell (etc) 6 and 12 upgrade | Army | Rotary wing aircraft | May 9, 2024 DoD 90d |
| W58RGZ25F0244 delivery order | $8.1M | Effort required for the procurement, manufacturing, integration, kitting, and delivery of aircraft survivability product improvement (aspi) kits, common missile warning system (cmws) kits, and mission essential packages (mep) for apache ... | Army | Rotary wing aircraft | Jul 24, 2025 DoD 90d |
| W58RGZ22F0362 delivery order | $7.4M | Common fire control system (cfcs) multi-sport tester (cmst) | Army | Guided missiles | Mar 3, 2026 DoD 90d |
| W58RGZ25F0152 delivery order | $7.3M | Mid-range capability (mrc) system upgrades. | Army | Rotary wing aircraft | Jul 28, 2025 DoD 90d |
| W58RGZ24F0234 delivery order | $7.0M | Establish a temporary facility, on government leased land in poland, in conjunction with the tardis program, to aide in armament integration, end user training, and deployment activities. ukraine | Army | Rotary wing aircraft | Jul 23, 2025 DoD 90d |
| W58RGZ23F0135 delivery order | $6.7M | Uh60a dos epmi and mod program | Army | Rotary wing aircraft | May 6, 2026 DoD 90d |
| W58RGZ24F0101 delivery order | $6.5M | Apache helicopters program. | Army | Rotary wing aircraft | Mar 31, 2026 DoD 90d |
| W58RGZ24F0402 delivery order | $6.5M | H-60 universal software loader verifier kits | Army | Rotary wing aircraft | Feb 11, 2026 DoD 90d |
| W58RGZ20F0492 delivery order | $6.4M | One (1) ch-53e aircraft. reset activities will improve the material condition of the aircraft and return the h-53 to an operational status. | Army | Rotary wing aircraft | Mar 6, 2025 DoD 90d |
| W58RGZ25F0089 delivery order | $5.8M | Osprey silent knight radar kit. | Army | Rotary wing aircraft | Apr 1, 2026 DoD 90d |
| W58RGZ23F0093 delivery order | $5.7M | Ch-47f new equipment training (net) and technical support. | Army | Aircraft and engine maintenance | Nov 13, 2024 DoD 90d |
| W58RGZ26F0103 delivery order | $5.7M | Berthing shelters. | Army | Rotary wing aircraft | Mar 17, 2026 DoD 90d |
| W58RGZ25F0075 delivery order | $5.6M | Ch-47f new equipment training (net) and technical support | Army | Rotary wing aircraft | Apr 1, 2026 DoD 90d |
| W58RGZ22F0250 delivery order | $5.6M | Engineering, production drawing package, and harness kit fabrication. | Army | Modification of equipment | Apr 1, 2026 DoD 90d |
| W58RGZ24F0096 delivery order | $5.5M | H-60m electronic standby instrument system (esis) adapter kits | Army | Rotary wing aircraft | Dec 13, 2023 DoD 90d |
| W58RGZ25F0253 delivery order | $5.3M | Provide technical services to support the consolidation of items, to include a/d/e common, pll and bench stock items for verification prior to shipment to the facility in poland. | Army | Rotary wing aircraft | Jun 9, 2025 DoD 90d |
| W58RGZ24F0348 delivery order | $5.2M | Consolidated automated support system (cass) family of testers (fots) support. | Army | Rotary wing aircraft | Apr 15, 2026 DoD 90d |
| W58RGZ25F0190 delivery order | $5.2M | Procurement and modification of missile loader and lowboys systems. | Army | Rotary wing aircraft | May 27, 2026 DoD 90d |
| W58RGZ25F0145 delivery order | $4.9M | New equipment training (net) to u.s. ARMY and allied nation organizations receiving ch-47f aircraft or new aircraft modifications that imparts the skills and knowledge target audiences need to operate and maintain the ch-47f cargo ... | Army | Rotary wing aircraft | May 27, 2026 DoD 90d |
| W58RGZ26F0073 delivery order | $4.9M | Fy 25 h-60m initial fielding package | Army | Rotary wing aircraft | Mar 10, 2026 DoD 90d |
| W58RGZ23F0382 delivery order | $4.7M | The purpose of this statement of work (sow) is to integrate the spike nlos (non line-of-sight) missile system onto the ah-64e v6 platform. | Army | Rotary wing aircraft | Mar 24, 2026 DoD 90d |
| W58RGZ20F0159 delivery order | $4.0M | Required for the design, engineering, integration, and tests associated with the air ground networking radio (agnr) integration to the uh/hh 60m helicopter | Army | Rotary wing aircraft | Feb 17, 2026 DoD 90d |
| W58RGZ26F0254 delivery order | $4.0M | Ah-64e ghost shield fielding | Army | Rotary wing aircraft | May 7, 2026 DoD 90d |
| W58RGZ25F0353 delivery order | $3.9M | W58rgz25f0353 new order | Army | Rotary wing aircraft | Apr 27, 2026 DoD 90d |
| W58RGZ24F0261 delivery order | $3.9M | Multiple launch rocket system family of munitions launch unit (mlu) phase ii support | Army | Aircraft and engine maintenance | May 12, 2026 DoD 90d |
| W58RGZ24F0382 delivery order | $3.8M | United states air force countermeasures dispenser tester alm-288 repair | Army | Rotary wing aircraft | Jan 14, 2026 DoD 90d |
| W58RGZ25F0324 delivery order | $3.8M | Operational support for marine rotation-darwin (opsmar-d). | Army | Rotary wing aircraft | May 12, 2026 DoD 90d |
| W58RGZ25F0187 delivery order | $3.7M | Support the international apache office - israel with ah-64d maintenance provisioning requirements. | Army | Rotary wing aircraft | Jun 4, 2025 DoD 90d |
| W58RGZ25F0312 delivery order | $3.7M | The purpose of this effort is to conduct logistics, inspection, and repair activities on hawk missile system major end items (meis), equipment, components, and parts, to equip partner nations with air defense capabilities. | Army | Rotary wing aircraft | Nov 20, 2025 DoD 90d |
| W58RGZ24F0307 delivery order | $3.7M | Degraded visual environment pilotage (dvep) kits for CH-47 block ii aircraft. | Army | Rotary wing aircraft | Dec 11, 2025 DoD 90d |
| W58RGZ24F0086 delivery order | $3.6M | Foreign military sales uh-60m aircraft support equipment | Army | Rotary wing aircraft | Nov 20, 2025 DoD 90d |
| W58RGZ25F0362 delivery order | $3.6M | Scout attack md530f kenya | Army | Rotary wing aircraft | Sep 23, 2025 DoD 90d |
| W58RGZ22F0341 delivery order | $3.6M | This sow defines the effort required to provide six (6) himars mk-3164 installation kits for pm storm (pfrms). | Army | Rotary wing aircraft | Nov 25, 2025 DoD 90d |
| W58RGZ25F0263 delivery order | $3.5M | Ch-47f aircraft staging site | Army | Aircraft and engine maintenance | Sep 11, 2025 DoD 90d |
| W58RGZ25F0328 delivery order | $3.3M | H-60l/v crashworthy external fuel system (cefs) auxiliary fuel management panel (afmp) ii | Army | Rotary wing aircraft | Nov 20, 2025 DoD 90d |
| W58RGZ25F0092 delivery order | $3.2M | H-60m generator b-kits | Army | Rotary wing aircraft | Feb 26, 2025 DoD 90d |
| W58RGZ23F0138 delivery order | $3.1M | Communication modernization project support himars | Army | Aircraft and engine maintenance | Dec 17, 2025 DoD 90d |
| W58RGZ24F0181 delivery order | $3.1M | Apache mobile team material kitting and mobile asset logistics and sustainment | Army | Rotary wing aircraft | May 15, 2025 DoD 90d |
| W58RGZ23F0295 delivery order | $3.0M | Attack reconnaissance battalion (arb) ah-64e special tools and test equipment kits | Army | Rotary wing aircraft | May 7, 2026 DoD 90d |
| W58RGZ24F0314 delivery order | $2.9M | Engine test instrument replacement system. | Army | Rotary wing aircraft | Apr 1, 2026 DoD 90d |
| W58RGZ26F0113 delivery order | $2.9M | Navair pma-209 ch-53 gpws/radalt test kit. | Army | Rotary wing aircraft | Mar 5, 2026 DoD 90d |
| W58RGZ23F0217 delivery order | $2.9M | This is an aircraft survivability product improvement common warning system for apache helicopters. | Army | Rotary wing aircraft | Apr 21, 2026 DoD 90d |
| W58RGZ25F0086 delivery order | $2.8M | Flexible engine diagnostic system moody air force base. | Army | Rotary wing aircraft | Jan 30, 2025 DoD 90d |
| W58RGZ23F0486 delivery order | $2.8M | Luh jettison door sb | Army | Rotary wing aircraft | Mar 18, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 12, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial