AwardTape · Defense awards · Defender Contracting & Construction LLC
Defender Contracting & Construction LLC: $29.7M in DoD and DHS awards
Defender Contracting & Construction LLC holds 95 DoD and DHS prime awards with $29.7M obligated Oct 6, 2023 to Jun 2, 2026. Largest category: Real property maintenance and repair at $23.7M; largest buyer: Department of the Air Force at $29.7M.
| Obligated FY2024+ | $29.7M |
|---|---|
| Awards | 95 |
| FY2024 | $11.1M |
| FY2025 | $11.1M |
| FY2026 to date | $7.5M |
| Lifetime obligated on these awards | $38.7M |
| First and latest action | Oct 6, 2023 · Jun 2, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $23.7M | 82 awards | 80% |
| 2 | Salvage, disposal and demolition | $5.4M | 10 awards | 18% |
| 3 | New construction | $563K | 2 awards | 1.9% |
| 4 | Installation of equipment | $94K | 1 awards | 0.3% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $29.7M | 95 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA441824F0048 delivery order | $2.7M | The purpose of this task order is for dcc to repair afsbns parking lot b756. | Air Force | Real property maintenance and repair | Mar 27, 2025 DoD 90d |
| FA441825F0037 delivery order | $2.3M | Work performed by this task order consists of repair by replacement for the cooling towers, basin water filtration, primary chilled water pumps, condenser water pumps, and equipment motor control center buckets. | Air Force | Real property maintenance and repair | Feb 28, 2025 DoD 90d |
| FA441826F0060 delivery order | $1.7M | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Apr 20, 2026 DoD 90d |
| FA441825F0086 delivery order | $1.4M | The work to be performed by this task order consists of interior repairs patching and painting dry wall, removal and replacement of carpet and matting, and ahu replacement in several units in the bachelor enlisted quarters naval weapons ... | Air Force | Real property maintenance and repair | Apr 21, 2026 DoD 90d |
| FA441826F0025 delivery order | $1.3M | The work consists of hvac/chiller replacement in b318 andb358. contractor is responsible for furnishing all tools, necessary to demolish designated building. the building(s) will be occupied during construction. | Air Force | Real property maintenance and repair | Dec 16, 2025 DoD 90d |
| FA441825F0081 delivery order | $1.1M | The work to be performed by this task order addresses issues at various facilities that are experiencing degradation in multiple types of roofing systems. | Air Force | Real property maintenance and repair | Apr 27, 2026 DoD 90d |
| FA441826F0058 delivery order | $1.1M | Work to be performed by this task order consists of demo permitting, asbestos survey/abatement/disposal, demo, and disposal of b362, building slab/footings, capping off utilities, and landscaping to ensure proper drainage and establish ... | Air Force | Salvage, disposal and demolition | May 28, 2026 DoD 90d |
| FA441825F0082 delivery order | $1.1M | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Nov 18, 2025 DoD 90d |
| FA441824F0179 delivery order | $909K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Sep 28, 2024 DoD 90d |
| FA441825F0085 delivery order | $899K | The work to be performed by this task order consists of minor site development, construction of a concrete footers, installation of pre-engineered shade sail systems. | Air Force | Real property maintenance and repair | Jun 2, 2026 DoD 90d |
| FA441824F0025 delivery order | $890K | Repair roofs various facilities ab and ws | Air Force | Real property maintenance and repair | Apr 2, 2025 DoD 90d |
| FA441825F0029 delivery order | $874K | The work to be performed is asbestos abatement and disposal, demolition, and disposal of one administrative building, building slab/footings, capping off utilities and landscaping to ensure proper drainage and establish ground cover. | Air Force | Salvage, disposal and demolition | Aug 27, 2025 DoD 90d |
| FA441825F0026 delivery order | $842K | The work to be performed is asbestos abatement/disposal, demolition, and disposal of 10 tlf units to include sidewalks, driveways, building slab/footings, capping off utilities and landscaping to ensure proper drainage and establish ground ... | Air Force | Salvage, disposal and demolition | Sep 18, 2025 DoD 90d |
| FA441826F0072 delivery order | $768K | The work to be performed by this task order consists of demolition, and disposal, of seven (7) earth covered ammunition magazine structures and final grading to ensure proper drainage and establish ground cover. | Air Force | Salvage, disposal and demolition | May 27, 2026 DoD 90d |
| FA441825F0094 delivery order | $649K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Feb 2, 2026 DoD 90d |
| FA441825F0130 delivery order | $592K | Work performed by this task order consists of replacing numerous pieces of equipment in the hvac system. | Air Force | Real property maintenance and repair | Dec 4, 2025 DoD 90d |
| FA441824F0103 delivery order | $580K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Apr 21, 2026 DoD 90d |
| FA441824F0080 delivery order | $476K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Apr 30, 2026 DoD 90d |
| FA441824F0081 delivery order | $438K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Mar 18, 2025 DoD 90d |
| FA441824F0168 delivery order | $438K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | May 29, 2025 DoD 90d |
| FA441824F0020 delivery order | $437K | Work performed by this task order consists of replacing existing brig laundry infrastructure for four (4) washers, four (4) dryers and limited work on exiting units. | Air Force | Real property maintenance and repair | May 6, 2026 DoD 90d |
| FA441824F0167 delivery order | $430K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | New construction | Jan 15, 2026 DoD 90d |
| FA441824F0039 delivery order | $416K | Papi light repair | Air Force | Real property maintenance and repair | Jan 6, 2025 DoD 90d |
| FA441826F0071 delivery order | $391K | Work to be performed by this task order consists of demolition, and disposal, of one (1) earth covered ammunition magazine structures. | Air Force | Salvage, disposal and demolition | May 21, 2026 DoD 90d |
| FA441826F0065 delivery order | $367K | The work to be performed by this task order consists of demolition, asbestos survey/abatement and disposal, demolition, and disposal of one bldg, bldg slab /footings, capping and landscaping to ensure proper drainage and establish ground ... | Air Force | Salvage, disposal and demolition | May 22, 2026 DoD 90d |
| FA441825F0028 delivery order | $362K | The work to be performed is asbestos abatement and disposal, demolition, and disposal of one administrative building, building slab /footings, capping off utilities and landscaping to ensure proper drainage and establish ground cover | Air Force | Salvage, disposal and demolition | Mar 25, 2026 DoD 90d |
| FA441824F0101 delivery order | $357K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Salvage, disposal and demolition | Jan 8, 2025 DoD 90d |
| FA441824F0171 delivery order | $334K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Apr 29, 2026 DoD 90d |
| FA441826F0063 delivery order | $319K | The work in this task order consists of asbestos abatement and disposal, demolition and disposal of entire traffic management bldg 36, bldg slab /footings, capping off utilities and landscaping to ensure proper drainage and establish ... | Air Force | Salvage, disposal and demolition | May 22, 2026 DoD 90d |
| FA441826F0068 delivery order | $300K | Work performed by this task order consists of performing repairs and corrective actions on the existing lightning protection systems (lps). | Air Force | Real property maintenance and repair | May 22, 2026 DoD 90d |
| FA441825F0084 delivery order | $271K | The work to be performed by this task order consists of minor site development, construction of a concrete footers, installation of pre-engineered shade sail system. 850 | Air Force | Real property maintenance and repair | Dec 9, 2025 DoD 90d |
| FA441824F0083 delivery order | $266K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Jun 27, 2024 DoD 90d |
| FA441824F0067 delivery order | $265K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Sep 24, 2024 DoD 90d |
| FA441825F0056 delivery order | $261K | The work to be performed by this task order consists of applying a durable, high strength epoxy or polyurethane structural lining to protect the structure from corrosion, leaks, and groundwater infiltration in identified manholes. | Air Force | Real property maintenance and repair | May 29, 2025 DoD 90d |
| FA441825F0120 delivery order | $252K | Work performed by this task order consists of performing repairs and corrective actions on the existing lightning protection systems (lps). | Air Force | Real property maintenance and repair | May 27, 2026 DoD 90d |
| FA441824F0088 delivery order | $230K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Jan 29, 2026 DoD 90d |
| FA441824F0175 delivery order | $194K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Apr 7, 2025 DoD 90d |
| FA441826F0029 delivery order | $188K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Mar 6, 2026 DoD 90d |
| FA441824F0027 delivery order | $185K | Dkgv 1133176 repair roofing and lps | Air Force | Real property maintenance and repair | Apr 12, 2024 DoD 90d |
| FA441824F0024 delivery order | $178K | Dkgv 1122618 repair hvac facilities air base and weapons station. | Air Force | Real property maintenance and repair | Mar 5, 2026 DoD 90d |
| FA441823F0064 delivery order | $178K | Repairs taxiway crossing and culvert area. | Air Force | Real property maintenance and repair | Jul 26, 2024 DoD 90d |
| FA441823F0093 delivery order | $153K | Repairing the existing waterline servicing pier x-ray north via water lancing and installing a modified swing joint assembly under the pier | Air Force | Real property maintenance and repair | Apr 11, 2024 DoD 90d |
| FA441825F0097 delivery order | $150K | Work performed by this task order consists of clearing, grading, framing, and installing concrete pads for the staging in the compressor yard at b-2701, removing bollards at b-2711 and re-configuring the support system trench drain piping. | Air Force | Real property maintenance and repair | Dec 9, 2025 DoD 90d |
| FA441824F0156 delivery order | $147K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Sep 24, 2024 DoD 90d |
| FA441824F0178 delivery order | $136K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Feb 5, 2026 DoD 90d |
| FA441825F0126 delivery order | $133K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | New construction | Dec 10, 2025 DoD 90d |
| FA441824F0149 delivery order | $127K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Mar 18, 2025 DoD 90d |
| FA441825F0061 delivery order | $126K | The work to be performed by this task order rehabilitation and corrosion control protective coatings to prevent the fuel pipe span structure from corrosion. | Air Force | Real property maintenance and repair | Jun 12, 2025 DoD 90d |
| FA441824F0028 delivery order | $116K | Install adequate lightning protection systems (lps) and surge protection to all explosive facilities on the weapons station. | Air Force | Real property maintenance and repair | Jan 8, 2024 DoD 90d |
| FA441824F0157 delivery order | $108K | This requirement is for a single award simplified acquisition of base engineer requirements (saber), firm-fixed-price, indefinite-delivery indefinite-quantity (idiq) contract. | Air Force | Real property maintenance and repair | Mar 18, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial