AwardTape · Defense awards · Constructive Building Solutions Inc
Constructive Building Solutions Inc: $2.8M in DoD and DHS awards
Constructive Building Solutions Inc holds 10 DoD and DHS prime awards with $2.8M obligated Nov 21, 2023 to Sep 29, 2026. Largest category: Real property maintenance and repair at $2.1M; largest buyer: U.S. Customs and Border Protection at $2.8M.
| Obligated FY2024+ | $2.8M |
|---|---|
| Awards | 10 |
| FY2024 | $762K |
| FY2025 | $0 |
| FY2026 to date | $2.0M |
| Lifetime obligated on these awards | $3.9M |
| First and latest action | Nov 21, 2023 · Sep 29, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $2.1M | 7 awards | 74% |
| 2 | Equipment maintenance, other | $740K | 2 awards | 26% |
| 3 | Installation of equipment | $0 | 1 awards | 0.0% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | U.S. Customs and Border Protection | $2.8M | 10 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| 70B01C26C00000071 definitive contract | $1.3M | Install two modular buildings at the blythe border patrol station (bps), blythe, ca. | U.S. Customs and Border Protection | Real property maintenance and repair | Jul 13, 2026 |
| 70B01C26P00000525 purchase order | $629K | A 12,000 gallon fuel tank would be adequate to supply fuel demand and minimize the need to fuel out of the station. fuel tank replacement is required to preserve operational safety and ensure uninterrupted mission support capability. | U.S. Customs and Border Protection | Equipment maintenance, other | Sep 29, 2026 |
| 70B01C24C00000101 definitive contract | $527K | This requirement includes various project in blythe ca and um | U.S. Customs and Border Protection | Real property maintenance and repair | Sep 16, 2024 |
| 70B01C24C00000067 definitive contract | $136K | Upgrades to forward operating laboratory, yuma, az | U.S. Customs and Border Protection | Real property maintenance and repair | Dec 27, 2024 |
| 70B01C26P00000117 purchase order | $111K | The maintenance repair of replacing all nineteen (19) overhead heater units at the yuma sector u.s. border patrol vehicle maintenance facility. | U.S. Customs and Border Protection | Equipment maintenance, other | Sep 24, 2026 |
| 70B01C24C00000059 definitive contract | $99K | The sr 78 checkpoint facility improvement requirement | U.S. Customs and Border Protection | Real property maintenance and repair | Sep 20, 2024 |
| 70B01C26C00000026 definitive contract | $13K | Perform camera pole #9 pathway repairs | U.S. Customs and Border Protection | Real property maintenance and repair | Mar 25, 2026 |
| 70B01C23F00000371 delivery order | $0 | To replace obsolete electric panel. | U.S. Customs and Border Protection | Installation of equipment | Nov 21, 2023 |
| 70B01C23F00000403 delivery order | $0 | Replace wellton admin and maintenance facility roofs | U.S. Customs and Border Protection | Real property maintenance and repair | Dec 19, 2023 |
| 70B01C23F00000639 delivery order | $0 | Correct electrical deficiencies in system connection, replace 30kw kohler, diesel generators with 48kw diesel generator to recharge, improve remote site data monitoring capability. | U.S. Customs and Border Protection | Real property maintenance and repair | May 16, 2024 |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial