AwardTape · Defense awards · Cni Aviation Advantage, a Joint Venture, LLC
Cni Aviation Advantage, a Joint Venture, LLC: $24.0M in DoD and DHS awards
Cni Aviation Advantage, a Joint Venture, LLC holds 60 DoD and DHS prime awards with $24.0M obligated Dec 4, 2023 to May 20, 2026. Largest category: Modification of equipment at $14.7M; largest buyer: Department of the Air Force at $24.0M.
| Obligated FY2024+ | $24.0M |
|---|---|
| Awards | 60 |
| FY2024 | $11.7M |
| FY2025 | $7.4M |
| FY2026 to date | $5.0M |
| Lifetime obligated on these awards | $28.5M |
| First and latest action | Dec 4, 2023 · May 20, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Modification of equipment | $14.7M | 28 awards | 61% |
| 2 | Aircraft components and accessories | $9.3M | 29 awards | 39% |
| 3 | Defense systems R&D | $104K | 3 awards | 0.4% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $24.0M | 60 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA862925FB061 delivery order | $4.9M | Rapid development integration facility support no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Sep 3, 2025 DoD 90d |
| FA862924FB042 delivery order | $4.6M | The contractor shall provide twenty-seven (27) b-52 pllf1-11002-5 vlf kits, ten (10) power boxes, ten (10) s/v modules, and two (2) sets of test cables | Air Force | Modification of equipment | Sep 23, 2024 DoD 90d |
| FA862926FB011 delivery order | $3.9M | The contractor shall provide twenty-eight (28) b-52 pllf1-11002-5 vlf kits fabricated to the drawing package provided by the rdif corrected fpds error in the referenced idv to correct the orders. | Air Force | Aircraft components and accessories | Dec 3, 2025 DoD 90d |
| FA862924F0495 delivery order | $2.1M | Rapid development integration facility | Air Force | Aircraft components and accessories | Apr 9, 2025 DoD 90d |
| FA862924FB036 delivery order | $1.3M | The contractor shall fabricate one (1) evdt installation kit for the hc-130j program office (po) at wpafb, oh. | Air Force | Modification of equipment | Sep 4, 2025 DoD 90d |
| FA862924FB041 delivery order | $1.1M | The contractor shall provide fifty (50) comm suite upgrade kits fabricated to the drawing package provided by the rdif. | Air Force | Modification of equipment | Jun 13, 2025 DoD 90d |
| FA862924F0494 delivery order | $671K | Rapid development integration facility | Air Force | Aircraft components and accessories | Apr 9, 2025 DoD 90d |
| FA862924F0479 delivery order | $648K | Rapid development and integration facility | Air Force | Aircraft components and accessories | Apr 15, 2025 DoD 90d |
| FA862924F0481 delivery order | $448K | Rapid development integration facility support | Air Force | Aircraft components and accessories | Apr 14, 2025 DoD 90d |
| FA862925FB008 delivery order | $309K | The contractor shall provide twenty (20) KC-46 warp adapters fabricated to the drawing package provided by the rdif. no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Oct 22, 2025 DoD 90d |
| FA862925FB041 delivery order | $278K | The contractor shall provide forty-eight (48) ky-75 equipment racks fabricated to the drawing package provided by the rdif no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Apr 22, 2025 DoD 90d |
| FA862926FB013 delivery order | $259K | The contractor shall provide one hundred and eighty (180) mids-jtrs cables fabricated to the drawing package provided by the rdif. | Air Force | Modification of equipment | Feb 5, 2026 DoD 90d |
| FA862924F0488 delivery order | $229K | Rapid development integration facility | Air Force | Aircraft components and accessories | Oct 29, 2025 DoD 90d |
| FA862926FB014 delivery order | $201K | The contractor shall provide one hundred and forty (140) mids-jtrs cables fabricated to the drawing package provided by the rdif. | Air Force | Modification of equipment | Jan 7, 2026 DoD 90d |
| FA862925FB005 delivery order | $185K | (1) electro-optical infrared (eoir) amplifier splitter (pn: 12940-300) and video encoder (pn: s-mx1e-r-v2-28v-sdi1-isr) kit for the hc-130j program office no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Feb 25, 2026 DoD 90d |
| FA862926FB040 delivery order | $185K | The contractor shall provide four (4) b-52 mpat jammer adapter assemblies fabricated to the drawing package provided by the rdif. | Air Force | Aircraft components and accessories | May 20, 2026 DoD 90d |
| FA862924FB038 delivery order | $181K | The contractor shall fabricate eleven (11) cv-22 sams-esa seat plates for the cv-22 program office fabricated to the drawing package provided by the rdif. | Air Force | Modification of equipment | Dec 19, 2025 DoD 90d |
| FA862926FB048 delivery order | $168K | The contractor shall provide forty-three (43) F-15 lau 131 a/a strongback kits fabricated to the drawing package provided by the rdif and three (3) arnold defense lau-131a/a launchers. | Air Force | Aircraft components and accessories | May 20, 2026 DoD 90d |
| FA862925FB053 delivery order | $166K | The contractor shall fabricate one (1) vortex c-band hpa relocation installation kit no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Aug 22, 2025 DoD 90d |
| FA862924FB040 delivery order | $148K | Cni shall provide six hundred -ninety-five (695) F-16 throttle covers and lwa (loose wire assembly) kits fabricated to the drawing provided by the rdif and two (2) additional unfinished F-16 covers for fit checks and first article ... | Air Force | Modification of equipment | Jun 5, 2025 DoD 90d |
| FA862925FB007 delivery order | $142K | The contractor shall provide seven (7) block thirty aesa ngrea radar bracket kits fabricated to the drawing package provided by the rdif. no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Jan 22, 2025 DoD 90d |
| FA862925FB010 delivery order | $139K | Fabricate twenty-four (24) ky-75 equipment racks fabricated to the drawing package provided by the rdif. no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Nov 20, 2024 DoD 90d |
| FA862925FB004 delivery order | $130K | The contractor shall provide six (6) block forty aesa radar bracket mk5 kits fabricated to the drawing package provided by the rdif. no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Jan 22, 2025 DoD 90d |
| FA862925FB047 delivery order | $128K | The contractor shall provide five (5) stiffener kits fabricated to the drawing package provided by the rdif | Air Force | Modification of equipment | Aug 27, 2025 DoD 90d |
| FA862925FB068 delivery order | $123K | The contractor shall secure the materials required for one (1) mobile data center no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Aug 22, 2025 DoD 90d |
| FA862925FB064 delivery order | $120K | The contractor shall fabricate multiple t-7 local manufactured support equipment items no cas waiver received, this is an error due to con-IT migration | Air Force | Aircraft components and accessories | Sep 4, 2025 DoD 90d |
| FA862922F0448 delivery order | $104K | Rapid development intergration facility | Air Force | Defense systems R&D | Jul 2, 2025 DoD 90d |
| FA862924F0485 delivery order | $85K | Rapid development integration facility | Air Force | Aircraft components and accessories | Apr 9, 2025 DoD 90d |
| FA862925FB009 delivery order | $80K | Six (6) t-7 ladders to the t-7 program office. no cas waiver received, this is an error due to con-IT migration | Air Force | Aircraft components and accessories | Apr 2, 2026 DoD 90d |
| FA862926FB044 delivery order | $77K | The contractor shall provide fifteen (15) smp-eds optic cable kits. | Air Force | Aircraft components and accessories | May 18, 2026 DoD 90d |
| FA862924F0491 delivery order | $69K | Rapid development integration facility support | Air Force | Aircraft components and accessories | Apr 9, 2025 DoD 90d |
| FA862926FB041 delivery order | $64K | The contractor shall manufacture and deliver eighteen (18) ac-130j com cord harness assemblies and two (2) aircraft com mod kits for the hc-130j program office (po) at wpafb, oh. | Air Force | Aircraft components and accessories | May 18, 2026 DoD 90d |
| FA862925FB035 delivery order | $58K | The contractor shall provide seven (7) c-130j dynamic re-tasking capability (drc) de-confliction kits no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Apr 22, 2025 DoD 90d |
| FA862924F0498 delivery order | $56K | Rapid development integration facility | Air Force | Aircraft components and accessories | Jul 10, 2025 DoD 90d |
| FA862925FB057 delivery order | $53K | The contractor shall provide one (1) hoist and instrumented wick test system (hawts) fabricated to the drawing package provided by the rdif no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Aug 20, 2025 DoD 90d |
| FA862924F0487 delivery order | $51K | Rapid development and integration faciltiy | Air Force | Aircraft components and accessories | Jun 30, 2025 DoD 90d |
| FA862923F0464 delivery order | $46K | Rapid development integration facility | Air Force | Aircraft components and accessories | Jul 8, 2025 DoD 90d |
| FA862925FB032 delivery order | $46K | Seven (7) mc-130j laircm block 30 group a and b kits iaw the time compliance technical order (tcto) and kit packing list no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Apr 22, 2025 DoD 90d |
| FA862925FB077 delivery order | $45K | The contractor shall provide one hundred and fifty (150) -10 and one hundred (100) -30 connector caps fabricated to the drawing package provided by the rdif. no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Sep 3, 2025 DoD 90d |
| FA862924F0493 delivery order | $45K | Rapid development integration facility | Air Force | Aircraft components and accessories | Apr 29, 2024 DoD 90d |
| FA862923F0482 delivery order | $44K | Rpaid development integration facility | Air Force | Aircraft components and accessories | Feb 4, 2025 DoD 90d |
| FA862925FB040 delivery order | $40K | The contractor shall provide six (6) ky-75 equipment racks fabricated to the drawing package provided by the rdif no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Apr 22, 2025 DoD 90d |
| FA862925FB062 delivery order | $38K | The contractor shall provide eight (8) KC-46 communications relay equipment interface panel (creip)/ roll-on-beyond line-of-sight enhancement (robe) adapter kits no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Jul 31, 2025 DoD 90d |
| FA862924F0484 delivery order | $38K | Rapid development integration facility | Air Force | Aircraft components and accessories | Dec 4, 2023 DoD 90d |
| FA862925FB003 delivery order | $35K | The contractor shall provide twenty (20) seat cushion modification kits fabricated to the drawing package provided by the rdif. no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Oct 2, 2024 DoD 90d |
| FA862926FB025 delivery order | $35K | The contractor shall provide thirteen (13) f-15e ethernet cables and fourteen (14) l-com rj-45 patch panels | Air Force | Aircraft components and accessories | Jan 21, 2026 DoD 90d |
| FA862924F0490 delivery order | $28K | Rapid development integration facility support | Air Force | Aircraft components and accessories | Apr 24, 2024 DoD 90d |
| FA862924F0489 delivery order | $28K | Rapid development integration facility support | Air Force | Aircraft components and accessories | Mar 11, 2024 DoD 90d |
| FA862925FB043 delivery order | $26K | The contractor shall provide ten (10) aces five seat dolly harnesses fabricated to the drawing package provided by the rdif. no cas waiver received, this is an error due to con-IT migration | Air Force | Modification of equipment | Jan 23, 2026 DoD 90d |
| FA862926FB006 delivery order | $24K | The contractor shall provide eighteen (18) F-15 tester kits fabricated to the drawing package provided by the rdif. corrected fpds error in the referenced idv to correct the orders. | Air Force | Aircraft components and accessories | Feb 5, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial