AwardTape · Defense awards · Bert Construction Inc
Bert Construction Inc: $3.4M in DoD and DHS awards
Bert Construction Inc holds 15 DoD and DHS prime awards with $3.4M obligated Jul 3, 2024 to Mar 24, 2026. Largest category: Real property maintenance and repair at $1.4M; largest buyer: Department of the Air Force at $3.4M.
| Obligated FY2024+ | $3.4M |
|---|---|
| Awards | 15 |
| FY2024 | $1.1M |
| FY2025 | $2.1M |
| FY2026 to date | $210K |
| Lifetime obligated on these awards | $3.4M |
| First and latest action | Jul 3, 2024 · Mar 24, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $1.4M | 7 awards | 43% |
| 2 | Equipment maintenance, other | $991K | 4 awards | 29% |
| 3 | Prefabricated structures | $745K | 1 awards | 22% |
| 4 | New construction | $206K | 2 awards | 6.1% |
| 5 | Electronic components | $5.9K | 1 awards | 0.2% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $3.4M | 15 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA330025C0053 definitive contract | $745K | Ots training site conex repair: bert construction proposal dated 11 september 2025 is hereby incorporated by reference. | Air Force | Prefabricated structures | Sep 18, 2025 DoD 90d |
| FA330025C0038 definitive contract | $555K | The contractor shall furnish all necessary plant, labor, equipment, and materials, and perform all work required for pnqs 25-1844 traffic light repairs. | Air Force | Equipment maintenance, other | Sep 25, 2025 DoD 90d |
| FA330024C0062 definitive contract | $497K | Aflcmc has a requirement to purchase and install carpet, as well as to renovate both building 892 suite 110 and the auditorium. | Air Force | Real property maintenance and repair | Feb 18, 2025 DoD 90d |
| FA330024C0054 definitive contract | $361K | Furnish all plant, labor, equipment, and materials to remove carpet and finish concrete floor in the bldg. 800 basement at maxwell afb iaw specifications, drawings, and contract terms. | Air Force | Real property maintenance and repair | Sep 24, 2024 DoD 90d |
| FA330025C0037 definitive contract | $235K | The contractor shall furnish all necessary plant, labor, equipment, and materials, and perform all work required for jubj 25-1847 repair gunter-annex traffic lights. | Air Force | Equipment maintenance, other | Sep 25, 2025 DoD 90d |
| FA330024C0025 definitive contract | $227K | Project title: fy 24 pnqs 24-3706 repair sewer lines | Air Force | Real property maintenance and repair | Jan 29, 2025 DoD 90d |
| FA330025C0060 definitive contract | $198K | Repair interior floor bldg 1431 in accordance with the summary of work (sow) and subject to the terms and conditions of the contract. | Air Force | Real property maintenance and repair | Sep 26, 2025 DoD 90d |
| FA330026C0007 definitive contract | $140K | Fy26 pnqs 26-3190 -sewer line repair bldg 155 | Air Force | Equipment maintenance, other | Mar 24, 2026 DoD 90d |
| FA330024C0029 definitive contract | $136K | Fy24 pnqs 24-3992 replace localizer pad, bldg. 2076 | Air Force | New construction | Nov 5, 2024 DoD 90d |
| FA330025C0041 definitive contract | $94K | Furnish all plant, labor, materials and equipment necessary to perform all work in connection with minor interior refresh, bldg 800 rm 254 in accordance with (iaw) pnqs 24-5297 specifications and drawings. | Air Force | Real property maintenance and repair | Sep 3, 2025 DoD 90d |
| FA330026C0008 definitive contract | $70K | Pnqs 269256 -repair drain line bldg 1403 | Air Force | New construction | Mar 24, 2026 DoD 90d |
| FA330025C0052 definitive contract | $62K | Furnish all plant, labor, materials and equipment necessary to perform all work in connection with building 1403 (max) plumbing - sewer pipe restrictions, maxwell afb. | Air Force | Equipment maintenance, other | Sep 16, 2025 DoD 90d |
| FA330024C0055 definitive contract | $52K | The work covered by these specifications consists of furnishing all plant, labor, equipment and materials and performing all operations in connection with the security upgrades of building 84 at maxwell afb/building 802 gunter annex of ... | Air Force | Real property maintenance and repair | Feb 18, 2025 DoD 90d |
| FA330025C0056 definitive contract | $20K | Contractor shall provide all necessary labor, materials, equipment, and supervision to complete the paint and refinishing of faith chapel (bldg 155) in accordance with (iaw) the specifications (specs) wo 101552055 and b155 site map. | Air Force | Real property maintenance and repair | Sep 19, 2025 DoD 90d |
| FA330025C0023 definitive contract | $5.9K | Install 3 power lines and 4 electrical outlets in building 714, maxwell afb in accordance with the attached statement of work (sow). | Air Force | Electronic components | Jun 12, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial