Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Bert Construction Inc

Bert Construction Inc: $3.4M in DoD and DHS awards

Bert Construction Inc holds 15 DoD and DHS prime awards with $3.4M obligated Jul 3, 2024 to Mar 24, 2026. Largest category: Real property maintenance and repair at $1.4M; largest buyer: Department of the Air Force at $3.4M.

Obligated FY2024+$3.4M
Awards15
FY2024$1.1M
FY2025$2.1M
FY2026 to date$210K
Lifetime obligated on these awards$3.4M
First and latest actionJul 3, 2024 · Mar 24, 2026
By categoryObligated FY2024+
#CategoryObligated FY2024+AwardsShare
1Real property maintenance and repair$1.4M7 awards43%
2Equipment maintenance, other$991K4 awards29%
3Prefabricated structures$745K1 awards22%
4New construction$206K2 awards6.1%
5Electronic components$5.9K1 awards0.2%
By agencyObligated FY2024+
#AgencyObligated FY2024+AwardsShare
1Department of the Air Force$3.4M15 awards100%
Largest awards50 per page · sorted by obligated
AwardObligated FY2024+WhatAgencyCategoryLatest action
FA330025C0053
definitive contract
$745KOts training site conex repair: bert construction proposal dated 11 september 2025 is hereby incorporated by reference.Air ForcePrefabricated structuresSep 18, 2025
DoD 90d
FA330025C0038
definitive contract
$555KThe contractor shall furnish all necessary plant, labor, equipment, and materials, and perform all work required for pnqs 25-1844 traffic light repairs.Air ForceEquipment maintenance, otherSep 25, 2025
DoD 90d
FA330024C0062
definitive contract
$497KAflcmc has a requirement to purchase and install carpet, as well as to renovate both building 892 suite 110 and the auditorium.Air ForceReal property maintenance and repairFeb 18, 2025
DoD 90d
FA330024C0054
definitive contract
$361KFurnish all plant, labor, equipment, and materials to remove carpet and finish concrete floor in the bldg. 800 basement at maxwell afb iaw specifications, drawings, and contract terms.Air ForceReal property maintenance and repairSep 24, 2024
DoD 90d
FA330025C0037
definitive contract
$235KThe contractor shall furnish all necessary plant, labor, equipment, and materials, and perform all work required for jubj 25-1847 repair gunter-annex traffic lights.Air ForceEquipment maintenance, otherSep 25, 2025
DoD 90d
FA330024C0025
definitive contract
$227KProject title: fy 24 pnqs 24-3706 repair sewer linesAir ForceReal property maintenance and repairJan 29, 2025
DoD 90d
FA330025C0060
definitive contract
$198KRepair interior floor bldg 1431 in accordance with the summary of work (sow) and subject to the terms and conditions of the contract.Air ForceReal property maintenance and repairSep 26, 2025
DoD 90d
FA330026C0007
definitive contract
$140KFy26 pnqs 26-3190 -sewer line repair bldg 155Air ForceEquipment maintenance, otherMar 24, 2026
DoD 90d
FA330024C0029
definitive contract
$136KFy24 pnqs 24-3992 replace localizer pad, bldg. 2076Air ForceNew constructionNov 5, 2024
DoD 90d
FA330025C0041
definitive contract
$94KFurnish all plant, labor, materials and equipment necessary to perform all work in connection with minor interior refresh, bldg 800 rm 254 in accordance with (iaw) pnqs 24-5297 specifications and drawings.Air ForceReal property maintenance and repairSep 3, 2025
DoD 90d
FA330026C0008
definitive contract
$70KPnqs 269256 -repair drain line bldg 1403Air ForceNew constructionMar 24, 2026
DoD 90d
FA330025C0052
definitive contract
$62KFurnish all plant, labor, materials and equipment necessary to perform all work in connection with building 1403 (max) plumbing - sewer pipe restrictions, maxwell afb.Air ForceEquipment maintenance, otherSep 16, 2025
DoD 90d
FA330024C0055
definitive contract
$52KThe work covered by these specifications consists of furnishing all plant, labor, equipment and materials and performing all operations in connection with the security upgrades of building 84 at maxwell afb/building 802 gunter annex of ...Air ForceReal property maintenance and repairFeb 18, 2025
DoD 90d
FA330025C0056
definitive contract
$20KContractor shall provide all necessary labor, materials, equipment, and supervision to complete the paint and refinishing of faith chapel (bldg 155) in accordance with (iaw) the specifications (specs) wo 101552055 and b155 site map.Air ForceReal property maintenance and repairSep 19, 2025
DoD 90d
FA330025C0023
definitive contract
$5.9KInstall 3 power lines and 4 electrical outlets in building 714, maxwell afb in accordance with the attached statement of work (sow).Air ForceElectronic componentsJun 12, 2025
DoD 90d

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.

Terminal: filters, alerts and CSV export for this company's awards.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial