Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Baker Engineering and Risk Consultants, Inc

Baker Engineering and Risk Consultants, Inc: $1.4M in DoD and DHS awards

Baker Engineering and Risk Consultants, Inc holds 3 DoD and DHS prime awards with $1.4M obligated Jan 16, 2024 to Jan 16, 2026. Largest category: Science and technology R&D at $766K; largest buyer: Department of the Navy at $766K.

Obligated FY2024+$1.4M
Awards3
FY2024$804K
FY2025$522K
FY2026 to date$114K
Lifetime obligated on these awards$2.2M
Parent company (as reported)Baker Engineering and Risk Consultants, Inc
First and latest actionJan 16, 2024 · Jan 16, 2026
By categoryObligated FY2024+
#CategoryObligated FY2024+AwardsShare
1Science and technology R&D$766K2 awards53%
2Defense systems R&D$675K1 awards47%
By agencyObligated FY2024+
#AgencyObligated FY2024+AwardsShare
1Department of the Navy$766K2 awards53%
2Department of the Air Force$675K1 awards47%
Largest awards50 per page · sorted by obligated
AwardObligated FY2024+WhatAgencyCategoryLatest action
FA865122CA007
definitive contract
$675KModeling tools and techniques for modern ordnance technologiesAir ForceDefense systems R&DDec 22, 2025
DoD 90d
N3943024C2011
definitive contract
$395KEcm door improvement testingNavyScience and technology R&DMar 21, 2024
DoD 90d
N3943025C0005
definitive contract
$370KFabrication and testing of one-way pre-cast concrete panels utilizing a shock-tube test set-up to simulate panel response to blast loads for validation of pre-cast concrete construction in use in future NAVY earth-covered magazine ...NavyScience and technology R&DJan 16, 2026
DoD 90d

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.

Terminal: filters, alerts and CSV export for this company's awards.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial