AwardTape · Defense awards · Arrow Indian Contractors, Inc
Arrow Indian Contractors, Inc: $11.0M in DoD and DHS awards
Arrow Indian Contractors, Inc holds 28 DoD and DHS prime awards with $11.0M obligated Oct 30, 2023 to Jun 4, 2026. Largest category: Real property maintenance and repair at $10.9M; largest buyer: Department of the Air Force at $10.7M.
| Obligated FY2024+ | $11.0M |
|---|---|
| Awards | 28 |
| FY2024 | $2.5M |
| FY2025 | $8.4M |
| FY2026 to date | $120K |
| Lifetime obligated on these awards | $17.6M |
| Parent company (as reported) | Arrow Indian Contractors, Inc |
| First and latest action | Oct 30, 2023 · Jun 4, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $10.9M | 23 awards | 99% |
| 2 | New construction | $88K | 3 awards | 0.8% |
| 3 | Installation of equipment | $25K | 1 awards | 0.2% |
| 4 | Equipment maintenance, other | $0 | 1 awards | 0.0% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Air Force | $10.7M | 24 awards | 97% |
| 2 | Department of the Army | $293K | 1 awards | 2.7% |
| 3 | U.S. Customs and Border Protection | $0 | 3 awards | 0.0% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| FA487725F0325 delivery order | $1.5M | Runway rubber accumulation be removed within landing zones as skid risk reduction mitigation. asphalt cement concrete pavement to be surface treated with gilsonite modified asphalt emulsion seal coat. airfield paint marking restored. | Air Force | Real property maintenance and repair | Jun 4, 2026 DoD 90d |
| FA487724F0126 delivery order | $1.4M | Contractor shall perform all ops associated with airfield/street/parking lot mx and repair including demo, utility work, sub-grade prep, concrete curb, base course, asphalt surface, sidewalk, striping, drainage, etc. on davis-monthan afb, ... | Air Force | Real property maintenance and repair | May 10, 2024 DoD 90d |
| FA487725F0305 delivery order | $1.0M | Primary and secondary service roads at dmafb require sustainment maintenance and repair. conduct sustainment maintenance and repair work of surface cleaning, crack seal, surface treatments, and painting and striping. | Air Force | Real property maintenance and repair | Jan 9, 2026 DoD 90d |
| FA487725F0178 delivery order | $952K | Airfield/street/parking lot maintenance and repair including demolition, utility work, sub-grade preparation, concrete curb, base course, asphalt surface, sidewalk, striping, drainage, etc. on davis-monthan afb and amarg iaw sow. | Air Force | Real property maintenance and repair | Jun 25, 2025 DoD 90d |
| FA487725F0257 delivery order | $948K | The principal roads for 309th amarg complex have deteriorated, and sustainment maintenance and repair are required to extend service life. sustainment maintenance is surface treatments, crack-fill, and restoration of existing pavement ... | Air Force | Real property maintenance and repair | Jan 9, 2026 DoD 90d |
| FA487725F0302 delivery order | $866K | Parking lots and roads along 5th street have deteriorated to where sustainment, maintenance and repair are required. nature of sustainment maintenance and repair are surface treatments, crack filling, and restoration of existing pavement ... | Air Force | Real property maintenance and repair | Jan 9, 2026 DoD 90d |
| FA487725F0304 delivery order | $861K | Craycroft road cracks need to be sealed adequately to prevent accelerated deterioration. seal the longitudinal and transvers cracking and arrest the light to medium weathering of the acc surface to extend its service life. | Air Force | Real property maintenance and repair | Jan 9, 2026 DoD 90d |
| FA487725F0070 delivery order | $707K | Amarg taxiway and aprons phase 3 airfield/street/parking lot maintenance and repair including demolition, utility work, sub-grade preparation, concrete curb, base course, asphalt surface, sidewalk, striping, drainage, etc. on davis-monthan ... | Air Force | Real property maintenance and repair | Jan 17, 2025 DoD 90d |
| FA487725F0303 delivery order | $555K | Primary and secondary service roads at dmafb require sustainment maintenance and repair. conduct sustainment maintenance and repair work in the general nature of surface cleaning, crack seal, surface treatments, and painting and striping. | Air Force | Real property maintenance and repair | Jan 9, 2026 DoD 90d |
| FA487725F0315 delivery order | $420K | 309th amarg maintenance dock and administration building parking lots require sustainment maintenance and repair. complete replacement of acc pavement surface. repair of underground electrical wiring. | Air Force | Real property maintenance and repair | Mar 13, 2026 DoD 90d |
| FA487724F0266 delivery order | $370K | Repairing fifth street on davis-monthan afb, an acc pavement with transverse block cracking and minor settling. project aims to arrest damage and extend service life to maximum extent possible. | Air Force | Real property maintenance and repair | Feb 6, 2025 DoD 90d |
| W912PL23C0029 definitive contract | $293K | Repair & replace sewer & water mains | Army | Real property maintenance and repair | Jul 8, 2025 DoD 90d |
| FA487725F0217 delivery order | $174K | The parking lots for the 355th mxg, b5500, require sustainment maintenance and repair to extend service life iaw sow. general nature of the sustainment maintenance are surface treatments, crack fill, and restoration of existing pavement ... | Air Force | Real property maintenance and repair | Jul 10, 2025 DoD 90d |
| FA487724F0269 delivery order | $168K | Contractor shall perform all operations associated with the removal of the existing gravel, scarifying the top clay soil, and installing base course and asphalt wearing surface to accommodate typical vehicular traffic for a parking surface. | Air Force | Real property maintenance and repair | Sep 28, 2024 DoD 90d |
| FA487724F0203 delivery order | $160K | Chapel road repair | Air Force | Real property maintenance and repair | Jul 31, 2024 DoD 90d |
| FA487724F0191 delivery order | $159K | Eight sections of parking lots have weathered and now maintenance is required. sustainment includes surface treatments, crack fill, and restoration of existing pavement markings. additional information is in the attached sow dated 20 may ... | Air Force | Real property maintenance and repair | Oct 1, 2024 DoD 90d |
| FA487725F0224 delivery order | $159K | The parking lot for the 355th sfs, b1358, require sustainment maintenance and repair to extend service life iaw sow. general nature of the sustainment maintenance are surface treatments, crack fill, and restoration of existing pavement ... | Air Force | Real property maintenance and repair | Jul 15, 2025 DoD 90d |
| FA487725F0260 delivery order | $86K | 55th rgs utilizes parking lots pa1540 04, pa1740 01, these lots deteriorated and require sustainment maintenance repair. general nature of the sustainment are surface treatments, crack filling, and restoration of existing pavement markings. | Air Force | Real property maintenance and repair | Jan 9, 2026 DoD 90d |
| FA487724F0172 delivery order | $82K | Sweep work area, repair cracks, and re-stripe from line of demarcation at the golf links rd. and craycroft rd. intersection to the intersection at arizola rd. and craycroft rd. | Air Force | Real property maintenance and repair | Jul 11, 2024 DoD 90d |
| FA487724F0068 delivery order | $46K | Construction of concrete pad and sidewalks for benko gym rescue requirement | Air Force | New construction | Jan 19, 2024 DoD 90d |
| FA488723C0009 definitive contract | $42K | Munitions trailer | Air Force | New construction | Apr 18, 2024 DoD 90d |
| FA487724F0204 delivery order | $25K | This work element consists of the performance of all work necessary to place bollards in front of the entrance of the bx in accordance with the statement of work. | Air Force | Installation of equipment | Sep 30, 2024 DoD 90d |
| FA487723F0129 delivery order | $24K | Repair cracks, apply surface sealant, and repaint markings on pavement shoulders at multiple locations on the airfield at davis-monthan air force base. | Air Force | Real property maintenance and repair | May 6, 2024 DoD 90d |
| 70B01C22F00001040 delivery order | $0 | Ajo station french drains and gates installation | U.S. Customs and Border Protection | Real property maintenance and repair | Apr 7, 2026 |
| 70B01C22F00001353 delivery order | $0 | No description on the record | U.S. Customs and Border Protection | Equipment maintenance, other | Oct 31, 2023 |
| 70B01C23F00001231 delivery order | $0 | Tucson border patrol headquarters parking lot repairs. | U.S. Customs and Border Protection | New construction | Jun 11, 2024 |
| FA487721D0008 IDIQ contract | $0 | Contractor shall perform all operations associated with airfield/street/parking lot maintenance and repair including demolition, utility work, sub-grade preparation, concrete curb, base course, asphalt surface, sidewalk on davis-monthan ... | Air Force | Real property maintenance and repair | Sep 15, 2025 DoD 90d |
| FA487724F0271 delivery order | $0 | This requirement is for a 60ft by 60ft concrete pad for the washing and storage of boats. the current location is dirt which ruts during washing and rain events. the location of the pad is to be adjacent to building 4868. | Air Force | Real property maintenance and repair | Feb 6, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial