| FA865022C5292 | $47.8M | definitive contract | Department of the Air Force | Defense systems R&D | Rapid assessment, maturation, prototyping, and transition of emerging structural technologies | Jun 4, 2026 |
| FA239124FB001 | $16.1M | delivery order | Department of the Air Force | Defense systems R&D | Technology research and development | May 28, 2026 |
| FA239424FB006 | $5.6M | delivery order | Department of the Air Force | Defense systems R&D | Materials integrated nano-/opto-electronic structures (minos) | Jan 29, 2026 |
| FA239424CB052 | $4.3M | definitive contract | Department of the Air Force | Defense systems R&D | The objective of this effort is to advance the technology readiness of the ibr welded patch repair process and demonstrate the capability to perform the patch repair process on real or representative ibr blades of the f119 and f135 engines. | Apr 22, 2025 |
| FA865021F2019 | $4.0M | delivery order | Department of the Air Force | Science and technology R&D | High speed research and development | Mar 25, 2026 |
| FA239621F0001 | $4.0M | delivery order | Department of the Air Force | Engineering and technical services | Education outreach support service | Jul 15, 2025 |
| FA865019F5626 | $2.1M | delivery order | Department of the Air Force | Defense systems R&D | Nde to1 quick reaction nondestructive evaluation | Jul 10, 2025 |
| FA239425FB004 | $1.0M | delivery order | Department of the Air Force | Defense systems R&D | Advanced computing for advanced composites (acac) | Feb 4, 2026 |
| FA865021F2204 | $998K | delivery order | Department of the Air Force | Defense systems R&D | Systems modeling of effectiveness | Apr 8, 2026 |
| FA252124F0273 | $869K | delivery order | Department of the Air Force | Engineering and technical services | Sharp ii fy24-25 task order for sustainment support (clin 4001 - clin 4002). the safety hazard analysis and risk processing (sharp) ii contract provides technical support for the space launch delta (sld) 45 sharp program. | Jun 28, 2024 |
| FA865021F2016 | $530K | delivery order | Department of the Air Force | Science and technology R&D | Systems analysis research and development | Feb 23, 2024 |
| FA865018F5573 | $486K | delivery order | Department of the Air Force | Defense systems R&D | Manufacturing of ordinance task order- for mits effort b | Mar 9, 2026 |
| FA252126F0055 | $478K | delivery order | Department of the Air Force | Space R&D | Sharp support iii is the designation for the hardware, software, and procedures used to perform flight analysis and risk analysis by sld 45 safety office analysts in support of space launch missions at the eastern range (er). | May 26, 2026 |
| FA252125F0218 | $435K | delivery order | Department of the Air Force | Engineering and technical services | Sharp is the designation for the hardware, software, and procedures used to perform flight analysis and risk analysis by 45 sw/sel analysts in support of space launch at the eastern range (er). | Jun 4, 2025 |
| FA461025F0204 | $249K | delivery order | Department of the Air Force | Professional services, other | Risk analysis support | Sep 25, 2025 |
| FA252124F0408 | $248K | delivery order | Department of the Air Force | Engineering and technical services | Integrate a standalone file converter tool with the flight analyses workstation to allow direct use of input files. this will reduce time to produce mission data load files required for afss launch missions and reduce risk model ... | Jun 13, 2025 |
| FA461024F0214 | $244K | delivery order | Department of the Air Force | Professional services, other | Launch risk analysis services | Sep 29, 2025 |
| FA252124F0332 | $229K | delivery order | Department of the Air Force | Engineering and technical services | Sld 45/sew will use the risk-based model in lieu of/in conjunction with dods quantity-distance (qd) separation approach which can negatively impact neighboring ops and result in significant mission limitations. | Jun 23, 2025 |
| FA252124F0380 | $225K | delivery order | Department of the Air Force | Engineering and technical services | Iv/v will allow use of the hazx tool to produce safe distance arcs that are significantly smaller than empirical safe distance arcs. smaller arcs allow ground processing at ccsfs of new launch vehicles w/ high quantities of liquid ... | Jun 25, 2025 |
| FA252124F0338 | $210K | delivery order | Department of the Air Force | Engineering and technical services | Aats to include 30/45 sld/sew will use the hazx risk-based model in lieu of dods quantity-distance separation approach which can negatively impact neighboring operations and result in significant mission limitations. | Jun 30, 2025 |
| FA252124F0410 | $202K | delivery order | Department of the Air Force | Engineering and technical services | Update faws to produce bulk afss simulations. bulk afss simulations will reduce sensor data errors and significantly reduce time required to produce mission data load files for afss launch missions. | Jun 25, 2025 |
| FA252124F0374 | $199K | delivery order | Department of the Air Force | Engineering and technical services | Fy24 eoy ufr-dba support sharp ii - convergent grids in range risk assessment tool (rrat). | Jun 20, 2025 |
| FA248624CB008 | $167K | definitive contract | Department of the Air Force | Engineering and technical services | Real-time risk analysis tool (rrat) support | Dec 6, 2024 |
| FA252124F0415 | $166K | delivery order | Department of the Air Force | Engineering and technical services | Modify ttks software architecture to allow parallel processing on multiple compute nodes instead of a single compute node to achieve a 50 percent reduction in runtime. | Jun 25, 2025 |
| FA252124F0412 | $163K | delivery order | Department of the Air Force | Engineering and technical services | Fy24 task order for sharp ii eoy task, accelerate distant focusing overpressure (dfo) analysis. | Jun 25, 2025 |
| FA252124F0389 | $146K | delivery order | Department of the Air Force | Engineering and technical services | Upgrade cape population database application to reduce time required to produce input files for risk assessment tools and flight controlled area (fca) roadblock access letters. | Jun 20, 2025 |
| FA239126CB019 | $144K | definitive contract | Department of the Air Force | Defense systems R&D | Arctos d-fast white paper | May 15, 2026 |
| FA252124F0336 | $139K | delivery order | Department of the Air Force | Engineering and technical services | The safety hazard analysis and risk processing (sharp) support ii contract provides technical support for the 45th space wings (45 sw) sharp program. sharp is the designation for the hardware, software, and procedures used to perform ... | Jun 20, 2025 |
| FA252124F0416 | $136K | delivery order | Department of the Air Force | Engineering and technical services | Fy24 task order for sharp ii eoy task, meta-trajectory tool kit (ttk) improvements. | Jun 25, 2025 |
| FA252124F0335 | $134K | delivery order | Department of the Air Force | Engineering and technical services | The safety hazard analysis and risk processing sharp ii will be to support hardware, software, and procedures used to perform flight analysis and risk analysis by 45 sw/sel analysts in support of space launch missions at the eastern range ... | Jun 20, 2025 |
| FA252126F0061 | $92K | delivery order | Department of the Air Force | Space R&D | Sharp is the designation for the hardware, software, and procedures used to perform flight analysis and risk analysis by sld 45/sel analysts in support of space launch missions at the eastern range (er). | Nov 26, 2025 |
| FA865021F2015 | $84K | delivery order | Department of the Air Force | Science and technology R&D | Structures research and development | Dec 19, 2023 |
| FA252125F0345 | $78K | delivery order | Department of the Air Force | Engineering and technical services | Update all 3 versions of the flight analyst workstation (faws) to preserve comments and standardize formatting and order in range safety operations markup language (rsoml) files allowing analysts/the range to easily compare differences ... | Sep 18, 2025 |
| FA461025P0063 | $78K | purchase order | Department of the Air Force | Engineering and technical services | 2025-0057602 | Jul 24, 2025 |
| FA252125F0279 | $56K | delivery order | Department of the Air Force | Space R&D | Arctos will provide software updates, testing, update of user documentation and submittal of a final report for distance focused overpressure (dfo) model update in gwin. | Jan 29, 2026 |
| FA252125F0335 | $52K | delivery order | Department of the Air Force | Space R&D | Aats to include 30/45 sld/sew will use the hazx risk-based model in lieu of dods quantity-distance separation approach which can negatively impact neighboring operations and result in significant mission limitations. | Sep 19, 2025 |
| FA865015D5231 0001 | $51K | delivery order | Department of the Air Force | Defense systems R&D | Igf::ot::igf numerical and computational methods for mats state awareness (services) | May 7, 2024 |
| FA865017F5254 | $32K | delivery order | Department of the Air Force | Defense systems R&D | Igf::ot::igf low observable (lo) nondestructive evaluation (nde) visual defect inspection technologies | Jun 4, 2025 |
| FA865021F2017 | $15K | delivery order | Department of the Air Force | Science and technology R&D | Fuels research and development | Dec 19, 2023 |
| FA239126FB011 | $15K | delivery order | Department of the Air Force | Defense systems R&D | Multidisciplinary, aerodynamics, and structures technologies research (mastr) | Apr 9, 2026 |
| FA865021F2018 | $10K | delivery order | Department of the Air Force | Science and technology R&D | Turbomachinery research and development | Dec 19, 2023 |
| FA800324F0050 | $1K | delivery order | Department of the Air Force | Defense systems R&D | Ro mac - rapid sustainment directorate multi-award contract kickoff meeting | Jul 30, 2024 |
| FA865625FB090 | $1K | delivery order | Department of the Air Force | Ammunition, other | Fourth on-ramp for eglin wide agile acquisition contract (ewaac) vehicle. | Apr 4, 2025 |
| HQ085926FG223 | $500 | delivery order | Missile Defense Agency | Defense systems R&D | Scalable homeland innovative enterprise layered defense (shield) initial order. | Dec 19, 2025 |
| FA865015D5231 0004 | $0 | delivery order | Department of the Air Force | Defense systems R&D | Igf::ot::igf development of software environments for dynamic collection analysis | Jul 3, 2024 |
| FA239126DB006 | $0 | IDIQ contract | Department of the Air Force | Defense systems R&D | Multidisciplinary, aerodynamics, and structures technologies research (mastr) | Apr 9, 2026 |
| FA239424DB002 | $0 | IDIQ contract | Department of the Air Force | Defense systems R&D | Materials for integrated nano-electronic and optoelectronic structures (minos) | Mar 31, 2026 |
| FA239425DB005 | $0 | IDIQ contract | Department of the Air Force | Defense systems R&D | Aerospace materials processing, performance and characterization (amppac) | Feb 25, 2025 |
| FA252120D0002 | $0 | IDIQ contract | Department of the Air Force | Space R&D | The safety hazard analysis and risk processing support ii contract provides technical support for the 45th space wings | Jan 14, 2026 |
| FA252123F0216 | $0 | delivery order | Department of the Air Force | Engineering and technical services | Safety hazard analysis and risk processing (sharp) for range risk assessment tool (rrat) available memory improvement task order for fy23. | Apr 8, 2025 |