Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Applied Physical Electronics, LC

Applied Physical Electronics, LC: $6.6M in DoD and DHS awards

Applied Physical Electronics, LC holds 6 DoD and DHS prime awards with $6.6M obligated Apr 9, 2024 to May 11, 2026. Largest category: Defense systems R&D at $4.8M; largest buyer: Department of the Navy at $3.9M.

Obligated FY2024+$6.6M
Awards6
FY2024$2.5M
FY2025$2.1M
FY2026 to date$2.0M
Lifetime obligated on these awards$9.8M
First and latest actionApr 9, 2024 · May 11, 2026
By categoryObligated FY2024+
#CategoryObligated FY2024+AwardsShare
1Defense systems R&D$4.8M3 awards73%
2Instruments and lab equipment$1.7M2 awards27%
3Installation of equipment$01 awards0.0%
By agencyObligated FY2024+
#AgencyObligated FY2024+AwardsShare
1Department of the Navy$3.9M3 awards59%
2Department of the Air Force$2.7M3 awards41%
Largest awards50 per page · sorted by obligated
AwardObligated FY2024+WhatAgencyCategoryLatest action
N0017823PC617
purchase order
$2.5MPhase 1 - engineeringNavyDefense systems R&DAug 21, 2024
DoD 90d
FA942225C0003
definitive contract
$1.7MAfnwc small business innovation research (sbir) 25.1 cycle. the contractor shall furnish all labor, supplies, hardware, materials, travel, facilities, and other direct costs reasonably required to accomplish the work plan included as ...Air ForceDefense systems R&DFeb 18, 2026
DoD 90d
N0042126C0012
definitive contract
$1.4MConcept and technology development planNavyInstruments and lab equipmentApr 21, 2026
DoD 90d
FA942226C0005
definitive contract
$599KThe contractor will develop, design, fabricate, integrate, and test a complete pulsed power system iaw the attached work plan.Air ForceDefense systems R&DApr 24, 2026
DoD 90d
FA860125P0123
purchase order
$373KThe requirement is to procure a marx generator for laboratory research and testing at the air force institue of technology (afit) at wright-patterson afb, ohio.Air ForceInstruments and lab equipmentSep 5, 2025
DoD 90d
N0017826A1601
blanket purchase agreement
$0Apelc bpaNavyInstallation of equipmentMay 11, 2026
DoD 90d

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.

Terminal: filters, alerts and CSV export for this company's awards.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial