AwardTape · Defense awards · Allstate Heating and Cooling, Incorporated
Allstate Heating and Cooling, Incorporated: $24.2M in DoD and DHS awards
Allstate Heating and Cooling, Incorporated holds 60 DoD and DHS prime awards with $24.2M obligated Nov 9, 2023 to Jun 4, 2026. Largest category: Real property maintenance and repair at $24.2M; largest buyer: Department of the Army at $24.2M.
| Obligated FY2024+ | $24.2M |
|---|---|
| Awards | 60 |
| FY2024 | $7.9M |
| FY2025 | $12.5M |
| FY2026 to date | $3.7M |
| Lifetime obligated on these awards | $30.0M |
| First and latest action | Nov 9, 2023 · Jun 4, 2026 |
| # | Category | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | $24.2M | 59 awards | 100% |
| 2 | New construction | -$1.5K | 1 awards | -0.0% |
| # | Agency | Obligated FY2024+ | Awards | Share |
|---|---|---|---|---|
| 1 | Department of the Army | $24.2M | 60 awards | 100% |
| Award | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|
| W9124824F3113 delivery order | $2.4M | Fan coil optimization/vfd/2 or 3-way valves multiple buildings. | Army | Real property maintenance and repair | May 11, 2026 DoD 90d |
| W9124825FA224 delivery order | $2.1M | Replace hvac system / building 6636 | Army | Real property maintenance and repair | Aug 28, 2025 DoD 90d |
| W9124825FA194 delivery order | $1.9M | Upgrade power to warehouse building 5210 | Army | Real property maintenance and repair | Aug 12, 2025 DoD 90d |
| W9124825FA171 delivery order | $1.2M | Repair company operations facility (cof) for stationing action bldg. 7941 fe251745j | Army | Real property maintenance and repair | Feb 13, 2026 DoD 90d |
| W9124825FA052 delivery order | $1.1M | See statement of work (sow). | Army | Real property maintenance and repair | Mar 5, 2025 DoD 90d |
| W9124824F3048 delivery order | $1.1M | Full hvac replacement bldg.2990 | Army | Real property maintenance and repair | Jun 25, 2024 DoD 90d |
| W9124825FA132 delivery order | $950K | The contractor shall replace hvac full scope for building 7062 to a level fully function and capable for operation, in strict accordance with drawings # 11154, specifications, in accordance with (iaw) section c and special conditions. | Army | Real property maintenance and repair | Jul 8, 2025 DoD 90d |
| W9124825FA081 delivery order | $907K | The contractor shall complete full hvac replacement building 2992 to a level fully function and capable for operation, in strict accordance with drawings #11129, specifications, in accordance with (iaw) section c and special conditions. | Army | Real property maintenance and repair | Jun 4, 2025 DoD 90d |
| W9124826FA091 delivery order | $887K | This project is to design build, renovate building 6454. | Army | Real property maintenance and repair | Jun 2, 2026 DoD 90d |
| W9124826FA100 delivery order | $775K | This will be a 100% design / build to replace rooftop unit and conveying system in kitchen area b-4061. | Army | Real property maintenance and repair | May 14, 2026 DoD 90d |
| W9124825FA161 delivery order | $574K | See attached statement of work | Army | Real property maintenance and repair | Jul 23, 2025 DoD 90d |
| W9124823F3093 delivery order | $565K | Replace duct work & (bldg. #7262) | Army | Real property maintenance and repair | Sep 18, 2025 DoD 90d |
| W9124824F3109 delivery order | $557K | Renovate bathrooms bldg 6636 | Army | Real property maintenance and repair | Sep 19, 2024 DoD 90d |
| W9124824F3117 delivery order | $536K | Hvac replacement bldg 7163 | Army | Real property maintenance and repair | Sep 24, 2024 DoD 90d |
| W9124825FA091 delivery order | $506K | This project is to replace hvac system at building 6901, replacing all the piping, fan coils and ancillary items (excluding the boilers and chillers). | Army | Real property maintenance and repair | Jul 25, 2025 DoD 90d |
| W9124824F3064 delivery order | $496K | Upgrade lighting in bldg. 202 | Army | Real property maintenance and repair | Apr 4, 2025 DoD 90d |
| W9124824F3098 delivery order | $495K | Replace daikin vrf system bldg. 71460 | Army | Real property maintenance and repair | Sep 24, 2024 DoD 90d |
| W9124825FA234 delivery order | $492K | Replace mini split systems on cofs. | Army | Real property maintenance and repair | Jan 5, 2026 DoD 90d |
| W9124824F3100 delivery order | $475K | Latrine modernization bldg 7226 | Army | Real property maintenance and repair | Aug 27, 2024 DoD 90d |
| W9124824F3054 delivery order | $436K | Replace ahu, buffer tank and fcu, 6639 | Army | Real property maintenance and repair | May 16, 2025 DoD 90d |
| W9124825FA229 delivery order | $430K | Replace old and damaged controls in building 5912 with new like controls. | Army | Real property maintenance and repair | Aug 28, 2025 DoD 90d |
| W9124824F3093 delivery order | $403K | Replace r-22 units bldg. 95 | Army | Real property maintenance and repair | Sep 13, 2024 DoD 90d |
| W9124823F3102 delivery order | $398K | Replace boilers in buildings 7119, 7227, | Army | Real property maintenance and repair | Feb 27, 2025 DoD 90d |
| W9124825FA206 delivery order | $396K | Build walls to provide privacy (bldg. 6074). | Army | Real property maintenance and repair | Aug 14, 2025 DoD 90d |
| W9124826FA049 delivery order | $370K | Replace fa system bldg 7111 | Army | Real property maintenance and repair | Mar 26, 2026 DoD 90d |
| W9124824F3034 delivery order | $334K | Replace boilers at buildings 6741, 6742, 6745, & 6746. | Army | Real property maintenance and repair | Nov 26, 2024 DoD 90d |
| W9124826FA064 delivery order | $322K | This project is to design-build, replace fire alarm and mass notification system at bldg. 1610. | Army | Real property maintenance and repair | Apr 17, 2026 DoD 90d |
| W9124824F3118 delivery order | $296K | Replace boiler bldg 6744, fe240734j | Army | Real property maintenance and repair | Feb 27, 2025 DoD 90d |
| W9124824F3033 delivery order | $278K | Replace trim/paneling bldg 2551 | Army | Real property maintenance and repair | Apr 15, 2026 DoD 90d |
| W9124825FA177 delivery order | $272K | Replace sanyo vrf system (bldg. #7550) fe251625j | Army | Real property maintenance and repair | Jul 29, 2025 DoD 90d |
| W9124825FA143 delivery order | $224K | This project is to replace chiller on bldg. 6088 | Army | Real property maintenance and repair | Jul 16, 2025 DoD 90d |
| W9124825FA181 delivery order | $214K | Repair roofs on buildings 6103 and 6106. | Army | Real property maintenance and repair | Jul 31, 2025 DoD 90d |
| W9124824F3120 delivery order | $203K | Resurface floors, bldg 7214 | Army | Real property maintenance and repair | Sep 23, 2024 DoD 90d |
| W9124826FA080 delivery order | $188K | This project is to replace roof on building 6735. | Army | Real property maintenance and repair | Apr 22, 2026 DoD 90d |
| W9124825FA049 delivery order | $183K | This project will address splitting square footage in existing footprint to accommodate both male and female genders. the existing latrines have original fixtures and finishes and is in need of revitalization and modernization. | Army | Real property maintenance and repair | May 8, 2025 DoD 90d |
| W9124825FA230 delivery order | $174K | Replace rtu-6 at shaw pfc | Army | Real property maintenance and repair | Aug 27, 2025 DoD 90d |
| W9124823F3082 delivery order | $169K | Replace cooling towers bldg 7938 & 7939 | Army | Real property maintenance and repair | Jun 25, 2025 DoD 90d |
| W9124824F3001 delivery order | $144K | Replace existing chiller | Army | Real property maintenance and repair | Mar 8, 2024 DoD 90d |
| W9124826FA024 delivery order | $132K | This project is to mitigate building flooding at buildings 7177 and 7179. | Army | Real property maintenance and repair | Feb 4, 2026 DoD 90d |
| W9124826FA103 delivery order | $99K | This requirement is to repair secondary containment at building 5500. | Army | Real property maintenance and repair | Jun 4, 2026 DoD 90d |
| W9124824F3094 delivery order | $96K | Clean hvac system bldg 93 | Army | Real property maintenance and repair | Aug 29, 2024 DoD 90d |
| W9124824F3107 delivery order | $84K | Install new hvac and repair latrines | Army | Real property maintenance and repair | Sep 6, 2024 DoD 90d |
| W9124824F3082 delivery order | $71K | Replace boiler bldg 6743 | Army | Real property maintenance and repair | Jul 31, 2024 DoD 90d |
| W9124825FA226 delivery order | $70K | This project consists of replacing the wash rack trench drain at building 7243 to a level fully functional and capable of operation | Army | Real property maintenance and repair | Sep 18, 2025 DoD 90d |
| W9124824F3038 delivery order | $62K | Install 4 ceiling fans in bldg. 3934 | Army | Real property maintenance and repair | Mar 29, 2024 DoD 90d |
| W9124823F3045 delivery order | $61K | Replace condensing unit b-7157 | Army | Real property maintenance and repair | Nov 19, 2024 DoD 90d |
| W9124823F0109 delivery order | $43K | Replace dx units and ahus bldgs. 6801 & 7834 | Army | Real property maintenance and repair | Feb 21, 2024 DoD 90d |
| W9124823F3058 delivery order | $22K | Replace chiller and fcu builidng 3301 | Army | Real property maintenance and repair | Aug 22, 2024 DoD 90d |
| W9124823F3050 delivery order | $6.0K | Replace d3030 cooling generation systems | Army | Real property maintenance and repair | Jul 18, 2024 DoD 90d |
| W9124823D3001 IDIQ contract | $0 | Fort campbell matoc for repair, renovation and construction | Army | Real property maintenance and repair | Jun 1, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 9, 2026.
Terminal: filters, alerts and CSV export for this company's awards.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial