AwardTape · Budget · Reprogramming · FY 26-25
August 2026 monthly action: $352.5M reprogrammed (FY 26-25)
DoD reprogrammed $352.5M in this internal reprogramming action (FY2026 serial 26-25), dated Sep 14, 2026. Largest increase: 0603680S Manufacturing Technology Program +$65.0M (Research, Development, Test and Evaluation, Defense-Wide). Largest source: 0607210D8Z Industrial Base Analysis and Sustainment Support -$65.0M (Research, Development, Test and Evaluation, Defense-Wide).
| Type | Internal (DD 1415-3) |
|---|---|
| Serial | FY 26-25 |
| Document date | Sep 14, 2026 from file name |
| Transfer between appropriations | Yes |
| Stated total | $352.5M increases · $352.5M decreases |
| Parse check | Parsed line items match the totals printed on the form ($352.5M in increases). |
| Source | DD 1415 PDF · 15 pages, 15 read by OCR |
| Appropriation | Years | Change |
|---|---|---|
| Research, Development, Test and Evaluation, Army receives | 26/27 | +$50.0M |
| Aircraft Procurement, Navy receives | 26/28 | +$18.0M |
| Other Procurement, Navy receives | 26/28 | +$48.0M |
| Research, Development, Test and Evaluation, Navy receives | 26/27 | +$4.8M |
| Research, Development, Test and Evaluation, Air Force receives | 26/27 | +$139.3M |
| Research, Development, Test, and Evaluation, Space Force receives | 26/27 | +$4.8M |
| Research, Development, Test and Evaluation, Defense-Wide receives | 26/27 | +$77.5M |
| Operation and Maintenance, Army gives | 26/26 | -$5.0M |
| Research, Development, Test and Evaluation, Army gives | 26/27 | -$45.0M |
| Operation and Maintenance, Navy gives | 26/26 | -$18.0M |
| Other Procurement, Navy gives | 26/28 | -$23.0M |
| Research, Development, Test and Evaluation, Air Force gives | 26/27 | -$149.3M |
| Research, Development, Test, and Evaluation, Space Force gives | 26/27 | -$4.8M |
| Procurement, Defense-Wide gives | 26/28 | -$27.5M |
| Research, Development, Test and Evaluation, Defense-Wide gives | 26/27 | -$65.0M |
| Other Procurement, Army receives | 24/26 | +$10.0M |
| Procurement, Defense-Wide gives | 24/26 | -$10.0M |
| Program | Program base | Change | Revised |
|---|---|---|---|
| 0603680S Manufacturing Technology Program Research, Development, Test and Evaluation, Defense-Wide 26/27 · BA 03: Advanced Technology Development Funds are required to be realigned within the Research, Development, Test, and Evaluation, Defense-Wide, 26/27, appropriation to PE 0603680S (Manufacturing Technology Program) from PE 06072 10D8Z (Industrial Base Analysis and Sustainment Support) for the proper execution of a FY ... | Base $176.6M | +$65.0M | Revised $241.6M |
| Advanced component development and prototypes Research, Development, Test and Evaluation, Air Force 26/27 · BA 04: Advanced component development and prototypes Funds are required to be realigned within the Research, Development, Test, and Evaluation, Air Force 26/27 appropriation for the following: PCM ee ft ee e $2.0 million to PE 0606004F (Nuclear Enterprise Research & Development) from PE 0606005F (Digital Transformation Office) for ... | Base $129.8M | +$38.0M | Revised $167.8M |
| Advanced technology development Research, Development, Test and Evaluation, Army 26/27 · BA 03: Advanced technology development Funds are required to be realigned within the Research, Development, Test, and Evaluation, Army, 26/27, appropriation to PE 0603463A (Network C3I Advanced Technology) from PE 0603457A (C31 Cyber Advanced Development) for the proper execution of FY 2026 congressional increases for ... | Base $133.9M | +$26.5M | Revised $160.4M |
| Tactical/Mobile C4I Systems Other Procurement, Navy 26/28 · BA 02: Communications and electronics equipment Funds are required to be transferred to the Other Procurement, Navy, 26/28, appropriation from the Procurement, Defense- Wide, 26/28, appropriation for the proper execution of a FY 2026 congressional increase for containerized secure unit. This action is necessary for the proper ... | Base $64.9M | +$25.0M | Revised $89.9M |
| 0208201F Offensive small Unmanned Aircraft Systems (SUAS) Research, Development, Test and Evaluation, Air Force 26/27 · BA 06: Management support Funds are required to be realigned to the Research, Development, Test, and Evaluation (RDT&E), Air Force, 26/27, appropriation to PE 0208201F (Offensive Small UAS) from PE 040801 1F (Special Tactics/Combat Control) for proper execution of a FY 2026 congressional increase for the ... | Base $4.9M | +$25.0M | Revised $29.9M |
| Command Support Equipment Other Procurement, Navy 26/28 · BA 07: Personnel and command support equipment Funds are required to be realigned within the Other Procurement, Navy, 26/28, appropriation to Command Support Equipment from Special Purpose Supply Equipment for the proper execution of a FY 2026 congressional increase for additive manufacturing to advance Indo-Pacific readiness ... | Base $34.2M | +$23.0M | Revised $57.2M |
| Applied Research Research, Development, Test and Evaluation, Air Force 26/27 · BA 02: Applied Research Funds are required to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation for the following: e $2.50 million to PE 0602605F (Directed Energy Technology) from PE 0603211F (Aerospace Technology Dev/Demo) for proper execution of a FY ... | Base $96.2M | +$18.5M | Revised $114.7M |
| F-18 Series Aircraft Procurement, Navy 26/28 · BA 05: Modification of aircraft Funds are required to be transferred to the Aircraft Procurement, Navy, 26/28, appropriation from the Operation and Maintenance, Navy, 26/26, appropriation for the proper execution of a FY 2026 congressional increase for Naval Reserve tactical operational flight trainer simulator ... | Base $757.0M | +$18.0M | Revised $775.0M |
| [Ckgranieaacior Approeatysecoce “weveenenn Mestre Research, Development, Test and Evaluation, Air Force 26/27 · BA 03: Advanced technology development Funds must be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation for the following: $12.500 million to PE 0603788F (Battlespace Knowledge Development and Demonstration) from PE 0603680F (Manufacturing Technology Program) to enable pr ... | Base $32.4M | +$17.5M | Revised $49.9M |
| Operational system development Research, Development, Test and Evaluation, Air Force 26/27 · BA 07: Operational system development Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation to PE 0604840F (F-35 C2D2) from PE 0207606F (Joint Simulation Environment) for proper execution of funding for the U.S. Air Force Pacific Warfare Center. Th ... | Base $960.6M | +$16.0M | Revised $976.6M |
| 0603680F Manufacturing Technology Program Research, Development, Test and Evaluation, Air Force 26/27 · BA 03: Advanced technology development Funds are required to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation to PE 0603680F (Manufacturing Technology Program) to PE 0604858F (Tech Transition Program) for proper execution of a FY 2026 for tactical 3D printing capabil ... | Base $342.5M | +$14.9M | Revised $357.4M |
| 0605051A Aircraft Survivability Development Research, Development, Test and Evaluation, Army 26/27 · BA 05: System Development and Demonstration Funds are required to be realigned within the Research, Development, Test, and Evaluation, Army, 26/27, appropriation to PE 0605051A (Aircraft Survivability Development) from PE 0605049A (Missile Warning System Modernization) for the proper execution of a FY 2026 congressional in ... | Base $47.2M | +$13.5M | Revised $60.7M |
| 1160403BB Aviation Systems Research, Development, Test and Evaluation, Defense-Wide 26/27 · BA 07: Operational Systems Development Funds are required to be transferred to the Research, Development, Test, and Evaluation, Defense-Wide, 26/27, appropriation from the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation for the proper execution of a FY 2026 congressional increase for the a ... | Base $126.4M | +$10.0M | Revised $136.4M |
| Tactical Communications and Protective System Other Procurement, Army 24/26 · BA 02: Communications and Electronics Equipment Funds are required to be transferred to the Other Procurement, Army, 24/26, appropriation from the Procurement, Defense-Wide, 24/26, appropriation for the proper execution of remaining funds from of a $30 million FY 2024 congressional increase for hearing protection. This action ... | Base $0 | +$10.0M | Revised $10.0M |
| 0602141A Lethality Technology Research, Development, Test and Evaluation, Army 26/27 · BA 02: Applied Research Funds are required to be transferred to the Research, Development, Test, and Evaluation, Army, 26/27, appropriation from the Operation and Maintenance, Army, 26/26, appropriation for the proper execution of a FY 2026 congressional increase for predictive manufacturing analytics. ... | Base $176.2M | +$5.0M | Revised $181.2M |
| 0603119A Ground Advanced Technology Research, Development, Test and Evaluation, Army 26/27 · BA 03: Advanced technology development Funds are required to be realigned within the Research, Development, Test, and Evaluation, Army, 26/27, appropriation to Program Element (PE) 0603119A (Ground Advanced Technology) from PE 0601275A (Electronic Warfare Basic Research) for the proper execution of an FY 2026 congress ... | Base $187.0M | +$5.0M | Revised $192.0M |
| 0603570N Advanced Nuclear Power Systems Research, Development, Test and Evaluation, Navy 26/27 · BA 04: Advanced Component Development and Prototypes Funds are required to be realigned within the Research, Development, Test, and Evaluation, Navy, 26/27, appropriation to PE 0603570N (Advanced Nuclear Power Systems) from PE 0602123N (Force Protection Applied Research) for the proper execution of an FY 2026 congressional increase ... | Base $343.8M | +$4.8M | Revised $348.7M |
| 1206601SF Space Technology Research, Development, Test, and Evaluation, Space Force 26/27 · BA 02: Applied Research Funds are required to be realigned within the Research, Development, Test, and Evaluation, Space Force, 26/27, appropriation to PE 1206601SF (Space Technology) from PE 1206310SF (Space Science and Technology Research and Development) for proper execution of a FY 2026 congressiona ... | Base $277.0M | +$4.8M | Revised $281.8M |
| 0604317F Technology Transfer Research, Development, Test and Evaluation, Air Force 26/27 · BA 04: Advanced component development and prototypes Funds are required to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation to PE 0604317F (Technology Transfer) from PE 0606005F (Digital Transformation Office) for proper execution of a FY 2026 congressional increase for the platfo ... | Base $37.5M | +$4.0M | Revised $41.5M |
| 0602202F Human Effectiveness Applied Research Research, Development, Test and Evaluation, Air Force 26/27 · BA 02: Applied Research Funds are required to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation to PE 0602202F (Human Effectiveness Applied Research) from PE 0602298F (Science and Tech Mgmt - Maj HQ Acts) for proper execution of a FY 2026 congressional ... | Base $145.3M | +$3.0M | Revised $148.2M |
| 0601102F Defense Research Sciences Research, Development, Test and Evaluation, Air Force 26/27 · BA 01: Basic research Funds are required to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation to PE 0601102F (Defense Research Sciences) from PE 0602203F (Aerospace Systems Technologies) for proper execution of a FY 2026 congressional increase for the ... | Base $307.6M | +$2.5M | Revised $310.1M |
| Operational Systems Development Research, Development, Test and Evaluation, Defense-Wide 26/27 · BA 07: Operational Systems Development Funds are required to transfer from to the Research, Development, Test, and Evaluation, Defense-Wide, 26/27, appropriation the Procurement, Defense-Wide, 26/28, appropriation for the proper execution of a FY 2026 congressional increase for PNT alternative for UAS in denied enviro ... | Base $573.7M | +$2.5M | Revised $576.2M |
| Program | Program base | Change | Revised |
|---|---|---|---|
| 0607210D8Z Industrial Base Analysis and Sustainment Support Research, Development, Test and Evaluation, Defense-Wide 26/27 · BA 07: Operational Systems Development Funds are required to be realigned within the Research, Development, Test, and Evaluation, Defense-Wide, 26/27, appropriation from PE 0607210D8Z (Industrial Base Analysis and Sustainment Support) to PE 06036808 (Manufacturing Technology Program) for the proper execution of a FY 2 ... | Base $801.7M | -$65.0M | Revised $736.7M |
| 0603457A C3I Cyber Advanced Development Research, Development, Test and Evaluation, Army 26/27 · BA 03: Advanced technology development Funds are required to be realigned within the Research, Development, Test, and Evaluation, Army, 26/27, appropriation from PE 0603457A (C3I Cyber Advanced Development) to PE 0603463A (Network C3I Advanced Technology) for the proper execution of an FY 2026 congressional increase f ... | Base $29.8M | -$26.5M | Revised $3.3M |
| Operational system development Research, Development, Test and Evaluation, Air Force 26/27 · BA 07: Operational system development Funds are available to be realigned to the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0408011F (Special Tactics/Combat Control) to PE 0208201F (Offensive Small UAS) proper execution of a FY 2026 congressional increase for the Hurricane sU ... | Base $25.0M | -$25.0M | Revised $0 |
| Major Equipment, OSD Procurement, Defense-Wide 26/28 · BA 01: Major equipment Funds are required to be transferred from the Procurement, Defense-Wide, 26/28, appropriation to the Other Procurement, Navy, 26/28, appropriation for the proper execution of a FY 2026 congressional increase for containerized secure unit. This action is necessary for the proper e ... | Base $439.7M | -$25.0M | Revised $414.7M |
| Special Purpose Supply Systems Other Procurement, Navy 26/28 · BA 06: Supply support equipment Funds are required to be realigned within the Other Procurement, Navy, 26/28, appropriation from Special Purpose Supply Equipment to Command Support Equipment for the proper execution of a FY 2026 congressional increase for additive manufacturing to advance Indo-Pacific readiness ... | Base $666.6M | -$23.0M | Revised $643.6M |
| Operating forces Operation and Maintenance, Navy 26/26 · BA 01: Operating forces Funds are required to be transferred from the Operation and Maintenance, Navy, 26/26, appropriation to the Aircraft Procurement, Navy, 26/28, appropriation for the proper execution of a FY 2026 congressional increase for Naval Reserve tactical operational flight trainer simulator ... | Base $64.2B | -$18.0M | Revised $64.2B |
| 0606017F Requirements Analysis and Maturation Research, Development, Test and Evaluation, Air Force 26/27 · BA 06: Management support Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0606017F (Requirements Analysis and Maturation) to PE 0606004F (Nuclear Enterprise Research & Development) for proper execution of a FY 2026 congres ... | Base $45.8M | -$18.0M | Revised $27.8M |
| 0101113F B-52 Squadrons Research, Development, Test and Evaluation, Air Force 26/27 · BA 07: Operational system development Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0101113F (B-52 Squadrons) to PE 0606004F (Nuclear Enterprise Research and Development) for proper execution of a FY 2026 congressional increase for ... | Base $888.2M | -$18.0M | Revised $870.2M |
| Applied Research Research, Development, Test and Evaluation, Air Force 26/27 · BA 02: Applied Research Funds are available to be realigned to the Research, Development, Test, and Evaluation (RDT&E), Air Force, 26/27, appropriation from PE 0602788F (Dominant Information Sciences and Methods) to PE 0602605F (Directed Energy Technology) for proper execution of a FY 2026 congressional ... | Base $295.7M | -$16.0M | Revised $279.7M |
| 0207606F Joint Simulation Environment (JSE) Research, Development, Test and Evaluation, Air Force 26/27 · BA 04: Advanced component development and prototypes Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0207606F (Joint Simulation Environment) to PE 0604840F (F-35 C2D2) for proper execution of funds for U.S. Air Force Pacific Warfare Center. Funds we ... | Base $247.5M | -$16.0M | Revised $231.5M |
| Advanced component development and prototypes Research, Development, Test and Evaluation, Air Force 26/27 · BA 04: Advanced component development and prototypes Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0604858F (Tech Transition Program) to PE 0603680F (Manufacturing Technology Program) for proper execution of a FY 2026 congressional increase for ta ... | Base $153.3M | -$14.9M | Revised $138.4M |
| 0605049A Missile Warning System Modernization (MWSM) Research, Development, Test and Evaluation, Army 26/27 · BA 05: System Development and Demonstration Funds are required to be realigned within the Research, Development, Test, and Evaluation, Army, 26/27, appropriation from PE 0605049A (Missile Warning System Modernization (MWSM)) to PE 0605051A (Aircraft Survivability Development (ASD)) for the proper execution of an FY 2026 co ... | Base $13.5M | -$13.5M | Revised $0 |
| Advanced technology development Research, Development, Test and Evaluation, Air Force 26/27 · BA 03: Advanced technology development Funds available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0603680F (Manufacturing Technology Program) to PE 0603788F (Battlespace Development and Demonstration) to enable proper execution of the FY26 Congressio ... | Base $342.5M | -$12.5M | Revised $330.0M |
| Operational system development Research, Development, Test and Evaluation, Air Force 26/27 · BA 07: Operational system development Funds are available to be transferred from the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation to the Research, Development, Test, and Evaluation, Defense- Wide, 26/27, appropriation for proper execution of a FY 2026 congressional increase for the aut ... | Base $28.7M | -$10.0M | Revised $18.7M |
| Major Equipment, OSD Procurement, Defense-Wide 24/26 · BA 01: Major equipment Funds are available to be transferred from the Procurement, Defense-Wide, 24/26, appropriation to the Other Procurement, Army, 24/26, appropriation for the proper execution of remaining funds from a $30 million FY 2024 congressional increase for hearing protection. This action is ... | Base $278.0M | -$10.0M | Revised $268.0M |
| Advanced component development and prototypes Research, Development, Test and Evaluation, Air Force 26/27 · BA 04: Advanced component development and prototypes Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation for the following: e $-2.0 million from PE 0606005F (Digital Transformation Office) to PE 0606004F (Nuclear Enterprise Research & Development) for proper ex ... | Base $73.5M | -$6.0M | Revised $67.5M |
| Operating Forces Operation and Maintenance, Army 26/26 · BA 01: Operating Forces Funds are available to be transferred from the Operation and Maintenance, Army, 26/26, appropriation to the Research, Development, Test, and Evaluation, Army, 26/27, appropriation for the proper execution of a FY 2026 congressional increase for predictive manufacturing analytics. ... | Base $38.8B | -$5.0M | Revised $38.8B |
| 0601275A Electronic Warfare Basic Research Research, Development, Test and Evaluation, Army 26/27 · BA 01: Basic research Funds are required to be realigned within the Research, Development, Test, and Evaluation, Army, 26/27, appropriation from PE 0601275A (Electronic Warfare Basic Research) to PE 0603119A (Ground Advanced Technology) for the proper execution of an FY 2026 congressional increase for ... | Base $94.9M | -$5.0M | Revised $89.9M |
| PoC et 0603032F Future AF Integrated Technology Demos Research, Development, Test and Evaluation, Air Force 26/27 · BA 03: Advanced technology development Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0603032F (Future AF Integrated Technology Demos) to PE 0603788F (Battlespace Knowledge Development and Demonstration) for proper execution of a FY 2 ... | Base $255.6M | -$5.0M | Revised $250.6M |
| 0602123N Force Protection Applied Research Other Procurement, Navy 26/28 · BA 02: Applied Research Funds are available to be realigned within the Research, Development, Test, and Evaluation, Navy, 26/27, appropriation from PE 0602123N (Force Protection Applied Research) to PE 0603570N (Advanced Nuclear Power Systems) for the proper execution of an FY 2026 congressional increas ... | Base $243.1M | -$4.8M | Revised $238.3M |
| 1206310SF Space Science and Technology Research and Development Research, Development, Test, and Evaluation, Space Force 26/27 · BA 03: Advanced Technology Development Funds are available to be realigned within the Research, Development, Test, and Evaluation, Space Force, 26/27, appropriation from PE 1206310SF (Space Science and Technology Research and Development) to PE 1206601SF (Space Technology) for proper execution of a FY 2026 congression ... | Base $495.5M | -$4.8M | Revised $490.7M |
| Applied Research Research, Development, Test and Evaluation, Air Force 26/27 · BA 02: Applied Research Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0602298F (Science and Tech Mgmt - Maj HQ Acts) to PE 0602202F (Human Effectiveness Applied Research) for proper execution of a FY 2026 congressional ... | Base $13.8M | -$3.0M | Revised $10.8M |
| 0602203F Aerospace Systems Technologies Research, Development, Test and Evaluation, Air Force 26/27 · BA 02: Applied Research Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0602203F Aerospace Systems Technologies to PE 0601102F Defense Research Sciences for proper execution of a FY 2026 congressional increase for the hy ... | Base $381.1M | -$2.5M | Revised $378.6M |
| Advanced technology development Research, Development, Test and Evaluation, Air Force 26/27 · BA 03: Advanced technology development Funds are available to be realigned within the Research, Development, Test, and Evaluation, Air Force, 26/27, appropriation from PE 0603211F (Aerospace Technology Dev/Demo) to PE 0602605F (Directed Energy Technology) for proper execution of a FY 2026 congressional increase for th ... | Base $264.4M | -$2.5M | Revised $261.9M |
| Unmanned ISR Procurement, Defense-Wide 26/28 · BA 02: Special Operations Command Funds are available to transfer from the Procurement, Defense-Wide, 26/28, appropriation to the Research, Development, Test, and Evaluation, Defense-Wide, 26/27, appropriation for the proper execution of a FY 2026 congressional increase for PNT alternative for UAS in denied envir ... | Base $9.4M | -$2.5M | Revised $6.9M |
Companies named: Aerospace
Tracked vehicles in this lane (C-UAS, sUAS): Anduril Enterprise IDIQ · DHS counter-UAS multiple-award IDIQ · USMC installation counter-sUAS · Army Mobile LIDS (IF/RCO) · DOE counter-UAS sites · Army force protection / base defense systems · USMC C-UAS Engagement System IDIQs · Army LIDS engineering and fixed-site IDIQ (SRC) · 25 more on counter-drone
Budget books show money requested, enacted and spent by fiscal year before contracts show it. Enacted procurement money stays available to obligate for 3 years, RDT&E for 2 years and shipbuilding for 5, so a line funded this year turns into contract awards over the following 1 to 5 years. DoD contract actions then publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the awards database trails these budget lines by months to years. Reprogramming actions move enacted money between accounts during the year, usually ahead of the awards it funds.
Sources
Related
Lethality TechnologyGround Advanced TechnologyArmy Advanced Technology DevelopmentAircraft Survivability DevelopmentF-18 SeriesTactical/Mobile C4I SystemsCommand Support EquipmentAdvanced Nuclear Power SystemsDefense Research SciencesHuman Effectiveness Applied ResearchManufacturing Technology ProgramTechnology TransferOffensive small Unmanned Aircraft Systems (sUAS)Manufacturing Technology ProgramElectronic Warfare Basic ResearchC3I Cyber Advanced DevelopmentMissile Warning System Modernization (MWSM)Special Purpose Supply SystemsForce Protection Applied ResearchAerospace Systems TechnologiesFuture AF Integrated Technology DemosAdvanced Engine DevelopmentJoint Simulation Environment (JSE)Requirements Analysis and MaturationB-52 SquadronsSpace Science and Technology Research and DevelopmentMajor Equipment, OSDUnmanned ISRIndustrial Base Analysis and Sustainment SupportTactical Communications And Protective SystemAerospaceAnduril Enterprise IDIQDHS counter-UAS multiple-award IDIQUSMC installation counter-sUASArmy Mobile LIDS (IF/RCO)DOE counter-UAS sitesArmy force protection / base defense systemsUSMC C-UAS Engagement System IDIQsArmy LIDS engineering and fixed-site IDIQ (SRC)
Terminal: budget lines matched to contracts and companies, with alerts when funding moves.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial