AwardTape · Budget · Reprogramming · FY 26-07

April 2026-Addendum 1: $303.0M reprogrammed (FY 26-07)

DoD asked the congressional defense committees to approve $303.0M in this prior-approval reprogramming action (FY2026 serial 26-07), dated n/a. Largest increase: Operational system development +$93.6M (Research, Development, Test and Evaluation, Air Force). Largest source: Ship Maintenance, Repair and Modernization -$80.6M (Other Procurement, Navy).

TypePrior approval (DD 1415-1)
SerialFY 26-07
Document daten/a from n/a
Transfer between appropriationsYes
Stated total$303.0M increases · $303.0M decreases
Parse checkAppropriation subtotals match the totals printed on the form; some line items may be missing or misread. Check the source PDF.
SourceDD 1415 PDF · 6 pages, 6 read by OCR
Accountsfrom and to
AppropriationYearsChange
National Guard Personnel, Army
receives
26/26+$8.6M
Missile Procurement, Air Force
receives
26/28+$4.0M
Operation and Maintenance, Army National Guard
gives
26/26-$8.6M
Missile Procurement, Air Force
gives
26/28-$4.0M
Research, Development, Test and Evaluation, Army
receives
25/26+$22.6M
Other Procurement, Navy
receives
25/27+$52.0M
Research, Development, Test and Evaluation, Navy
receives
25/26+$122.2M
Research, Development, Test and Evaluation, Air Force
receives
25/26+$93.6M
Missile Procurement, Army
gives
25/27-$22.6M
Aircraft Procurement, Navy
gives
25/27-$93.6M
Other Procurement, Navy
gives
25/27-$80.6M
Aircraft Procurement, Air Force
gives
25/27-$93.6M
Increases10 lines · +$303.0M
ProgramProgram baseChangeRevised
Operational system development
Research, Development, Test and Evaluation, Air Force 25/26 · BA 07: Operational system development
Funds are required for the F-35 Propulsion Engine Core Upgrade (ECU) program to procure critical long-lead test engine material and preserve the engineering workforce. This action is required to prevent a stop work for the risk reduction contract and prevent a two-year delay to t ...
Base $1.1B+$93.6MRevised $1.2B
Operational system development
Research, Development, Test and Evaluation, Navy 25/26 · BA 07: Operational system development
Funds are required for the F-35 Propulsion Engine Core Upgrade program to procure critical long-lead test engine material and preserve the engineering workforce. This action will prevent a stop work for the risk reduction contract and avoid a two-year delay to fielding, which wou ...
Base $480.8M+$46.8MRevised $527.5M
Operational system development
Research, Development, Test and Evaluation, Navy 25/26 · BA 07: Operational system development
Funds are required for the F-35 Propulsion Engine Core Upgrade program to procure critical long-lead test engine material and preserve the engineering workforce. This action will prevent a stop work for the risk reduction contract and avoid a two-year delay to fielding, which wou ...
Base $466.2M+$46.8MRevised $513.0M
Special Purpose Supply Systems
Other Procurement, Navy 25/27 · BA 06: Supply support equipment
Funds are required for a classified requirement. Details are at a higher classification level. This is a congressional special interest item.
Base $1.0B+$31.0MRevised $1.0B
0205778A Guided Multiple-Launch Rocket System (GMLRS)
Research, Development, Test and Evaluation, Army 25/26 · BA 07: Operational system development
Funds are required to support the development of anti-jam upgrades to the GMLRS system to enable modification of missiles on the FY 2027 procurement contract.
Base $20.6M+$22.6MRevised $43.2M
Command Support Equipment
Other Procurement, Navy 25/27 · BA 07: Personnel and command support equipment
Funds are required for a Mobile Sensitive Compartmented Information Facility (SCIF) needed to meet operational demands supporting the U.S. Pacific Fleet. This mission critical capability ensures the Navy retains secure Command and Control (C2) and intelligence operations during e ...
Base $29.7M+$21.0MRevised $51.0M
Advanced Component Development and Prototypes
Research, Development, Test and Evaluation, Navy 25/26 · BA 04: Advanced Component Development and Prototypes
Funds are required for the following: e $+4.650 million for crucial efforts for model validation and testing of High Energy Laser (HEL) technologies to assess HEL lethality in Naval operational environments against counter anti-ship missiles. This is a congressional special inter ...
Base $19.9M+$18.6MRevised $38.5M
0603563N Ship Concept Advanced Design
Research, Development, Test and Evaluation, Navy 25/26 · BA 04: Advanced Component Development and Prototypes
Funds are required for Submarine Tender Replacement developmental efforts to support the planned procurement of two Submarine Tenders in FY 2027. This represents the minimum additional funding required in FY 2026, when combined with the FY 2027 request, to support remaining requi ...
Base $122.0M+$10.0MRevised $132.0M
000080 Special Training
National Guard Personnel, Army 26/26 · BA 01: Reserve Component Training and Support
Funds are required to provide for the pay and allowances of 80 uniformed cyber personnel conducting Critical Infrastructure Protection and network hardening for Army National Guard defense infrastructure improvements. Funds for this effort were incorrectly requested and appropria ...
Base $10.7B+$8.6MRevised $10.8B
Ms! Sprs/Repair Parts (Initial)
Missile Procurement, Air Force 26/28 · BA 04: Spares and repair parts
Funds are required to procure initial spares for the production line in support of the Lot 40 AMRAAM production contract award. Due to the extension of the AMRAAM program of record and increasing production rates, additional initial spares are required in FY 2026. If the initial ...
Base $5.8M+$4.0MRevised $9.9M
Decreases (sources)6 lines · -$209.4M
ProgramProgram baseChangeRevised
Ship Maintenance, Repair and Modernization
Other Procurement, Navy 25/27 · BA 01: Ships support equipment
Funds are available due to the cancellation of the USS Boise (SSN-764) maintenance overhaul because the Navy will be inactivating the submarine. effort. An extended negotiation period has delayed the associated contract award into FY 2027. There are no known requirements for the ...
Base $2.4B-$80.6MRevised $2.4B
Joint Strike Fighter CV
Aircraft Procurement, Navy 25/27 · BA 01: Combat aircraft
Funds are available from the F-35 Depot I-Level Non-Recurring Engineering (DINRE) effort. An extended negotiation period has delayed the associated contract award into FY 2027. Using this funding to mitigate a stop work on the F-35 Propulsion Engine Core Upgrade risk reduction co ...
Base $2.3B-$46.8MRevised $2.2B
Combat aircraft
Aircraft Procurement, Navy 25/27 · BA 01: Combat aircraft
Funds are available from the F-35 Depot I-Level Non-Recurring Engineering (DINRE) effort. An extended negotiation period has delayed the associated contract award into FY 2027. Using this funding to mitigate a stop work on the F-35 Propulsion Engine Core Upgrade risk reduction co ...
Base $2.0B-$46.8MRevised $1.9B
Guided MLRS Rocket (GMLRS)
Missile Procurement, Army 25/27 · BA 02: Other missiles
Funds are available and excess to need from the multi-year procurement contract.
Base $1.2B-$22.6MRevised $1.1B
Operating forces
Operation and Maintenance, Army National Guard 26/26 · BA 01: Operating forces
Funds are available to be transferred from the Operation and Maintenance, Army National Guard (OMNG), 26/26 appropriation to the National Guard Personnel, Army, (NGPA) 26/26, as they were incorrectly requested and appropriated in OMNG due to their initial association with an Army ...
Base $8.2B-$8.6MRevised $8.2B
AMRAAM
Missile Procurement, Air Force 26/28 · BA 02: Other missiles
Funds are available and excess to need for AMRAAM telemetry kits. All requirements have been satisfied within existing funding. The funding source is not related to the FY 2026 congressional increase for $25.000 million additional quantities to accelerate multi-year procurement r ...
Base $382.1M-$4.0MRevised $378.1M
Timing

Budget books show money requested, enacted and spent by fiscal year before contracts show it. Enacted procurement money stays available to obligate for 3 years, RDT&E for 2 years and shipbuilding for 5, so a line funded this year turns into contract awards over the following 1 to 5 years. DoD contract actions then publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the awards database trails these budget lines by months to years. Reprogramming actions move enacted money between accounts during the year, usually ahead of the awards it funds.

Terminal: budget lines matched to contracts and companies, with alerts when funding moves.