AwardTape / Contracts / W912QR-26-F-A105
W912QR-26-F-A105: $10.2M Department of the Army Award to Luhr Crosby
Dredging of ohio river. Contracting activity: W072 ENDIST LOUISVILLE. Estimated completion: Nov 15, 2026.
$10.2M total obligated / $10.2M latest announced action / Competed / Nov 15, 2026 completion / W912QR W072 ENDIST LOUISVILLE
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912QR-26-F-A105 (unhyphenated: W912QR26FA105) / Parent Vehicle: W912QR-24-D-0013 |
|---|---|
| Prime Contractor (Awardee) |
Luhr Crosby
(Kentucky)
FY2024-FY2026 Federal Defense Portfolio: $141.0M obligated across 26 contracts
|
| Total Obligated (all actions) | $10,219,379 ($10.2M) |
| Latest Announced Action (2026-03-24) | $10,200,000 |
| USAspending / FPDS Obligation History | Total obligated: $10,219,379 (signed 2026-03-24, latest FPDS action 2026-03-24) / 2 Issued Delivery/Task Order(s) totaling $24,815,642 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912QR: W072 ENDIST LOUISVILLE |
| Competition & Contract Structure | Competed / Delivery Order (delivery order) / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC R799 (Support- Management: Other) / NAICS 237990 (Other Heavy And Civil Engineering Construction) |
| Work Locations & Funding | Primary Place of Performance: Kentucky |
| Estimated Completion Date | Nov 15, 2026 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Luhr Crosby wins $10.2M contract for dredging of shoals, navigation channels, and approach areas of locks. U.S. Army Corps of Engineers work through Nov 15, 2026.
Dredging of ohio river
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Luhr Crosby
- Delivery Runway: Active through Nov 15, 2026
- Requirement Scope: Dredging of ohio river
- Federal Supply Class: PSC R799 (Support- Management: Other)
- BD Action: Reference Prime Contract W912QR-26-F-A105 when contacting Luhr Crosby Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912QR (W072 ENDIST LOUISVILLE)
- Acquisition Method: Competed
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W912QR-26-F-A105 (2 shown, $24.8M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W912QR24F0086 | $13.8M | Luhr Crosby, LLC | 2024-04-01 / 2024-12-16 | 2024-12-31 | Main survey |
| W912QR25FA050 | $11.0M | Luhr Crosby, LLC | 2025-04-07 / 2025-10-10 | 2025-12-31 | Dredge attendant plant and on-shore disposal equipment for channel maintenance, ohio river (rm 439-981) and ohio river pool areas of tributaries, and upper mississippi river (rm 0.0-185.0) |
Recent Contract Actions from Buying Office W912QR (W072 ENDIST LOUISVILLE)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-11-25 | W912QR-27-D-A002 | Greenfield International Corp. | $20.0M | May 31, 2032 | Greenfield International Corp.,* Woodbridge, Virginia (W912QR-27-D-A002); Crico Enterprise LLC,* Louisville, Kentucky (W912QR-27-D-A001); Re... |
| 2026-11-04 | W912QR-27-C-A001 | HHI Corp. | $36.3M | May 18, 2029 | HHI Corp., Ogden, Utah, was awarded a firm-fixed-price contract for maintenance and repair on the General Stilwell Memorial Army Reserve Cen... |
| 2026-10-30 | W912QR-27-C-A002 | Dominion Privatization Texas LLC | $61.0M | May 7, 2029 | Construction of a microgrid system |
| 2026-10-30 | W912QR-27-F-A007 | Butt Construction Co. Inc. | $23.6M | Nov 21, 2029 | Butt Construction Co. Inc., Dayton, Ohio, was awarded a $23,579,400 firm-fixed-price, indefinite-delivery/indefinite-quantity contract with ... |
| 2026-10-28 | W912QR-27-C-A003 | Canoochee Electric Membership Corp. | $54.8M | April 25, 2029 | Design-bid-build construction of an Energy Resilience and Conservation Investment Program microgrid and power generation |
| 2026-10-01 | W912QR-26-F-A317 | Howard W. Pence | $13.0M | Sep 19, 2028 | Howard W. Pence wins $13.0M contract for design-build construction services. U.S. Army Corps of Engineers signed Sep 30, 2026 work through S... |
| 2026-09-30 | W912QR-26-C-A047 | Alexandra Construction | $20.5M | Dec 21, 2029 | Alexandra Construction wins $20.5M contract for design-bid-build construction of a training building. U.S. Army Corps of Engineers $20.5M ob... |
| 2026-09-29 | W912QR-26-F-A264 | G & G Steel | $11.5M | Nov 8, 2030 | G & G Steel wins $11.5M contract for removal, fabrication, delivery, and installation of culvert valve assemblies. U.S. Army Corps of Engine... |
Other Recent Department of War Awards to Luhr Crosby
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-07-31 | W912P8-26-D-A007 | Army | $25.0M | Jul 30, 2028 | Luhr Crosby wins $25.0M contract for flood control on the Mississippi River and tributaries. U.S. Army Corps of Engineers work through Jul 3... |
| 2026-06-04 | W912EE-26-D-A002 | Army | $99.5M | Jun 3, 2031 | Luhr Crosby and 3 others share $99.5M order for each order of a $99,500,000 firm-fixed-price contract for all plant, labor, materials. U.S. ... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912QR-26-F-A105
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) / Official Agency FOIA Portal ↗
Export Contract Dossier & Related Awards
Download this contract record, sibling orders, and buying office awards in CSV, JSON, or Markdown Brief, or query via the AwardTape API & MCP server.
Building an AI agent? Get this award as JSON: GET /api/agent/v1/awards?q=W912QR26FA105. Schema, sample and price or start with free sample calls.