AwardTape / Contracts / W912DY-27-F-A036
W912DY-27-F-A036: $47.9M Department of the Army Award to Omega Pipeline Co. LLC
Energy and water conservation services to reduce energy and water consumption, utility costs, and related maintenance, repair, and replacement costs. Contracting activity: U.S. Army Corps of Engineers' Engineering and Support Center, Huntsville, Alabama. Estimated completion: June 30, 2050.
$47.9M latest announced action / Competition not stated / June 30, 2050 completion / W912DY U.S. Army Corps of Engineers' Engineering and Support Center, Huntsville, Alabama
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W912DY-27-F-A036 (unhyphenated: W912DY27FA036) |
|---|---|
| Prime Contractor (Awardee) |
Omega Pipeline Co. LLC
(Fort Leonard Wood, Missouri)
FY2024-FY2026 Federal Defense Portfolio: $25.5M obligated across 1 contracts
|
| Total Obligated (all actions) | No obligations posted to USAspending yet. Announced value: $47,854,508 |
| Latest Announced Action (2026-11-27) | $47,854,508 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W912DY: U.S. Army Corps of Engineers' Engineering and Support Center, Huntsville, Alabama |
| Competition & Contract Structure | Competition not stated / Three bids were solicited with two received. / Firm-fixed-price, indefinite-delivery/indefinite-quantity |
| Work Locations & Funding | Work locations and funding will be determined with each order, with an estimated completion date of June 30, 2050. |
| Estimated Completion Date | June 30, 2050 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Omega Pipeline Co. LLC, Fort Leonard Wood, Missouri, was awarded a $47,854,508 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for energy and water conservation services to reduce energy and water consumption, utility costs, and related maintenance, repair, and replacement costs. Three bids were solicited with two received. Work locations and funding will be determined with each order, with an estimated completion date of June 30, 2050. U.S. Army Corps of Engineers' Engineering and Support Center, Huntsville, Alabama, is the contracting activity (W912DY-27-F-A036).
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Omega Pipeline Co. LLC (Fort Leonard Wood, Missouri)
- Delivery Runway: Active through June 30, 2050
- Requirement Scope: Energy and water conservation services to reduce energy and water consumption, utility costs, and related maintenance, repair, and replacement costs
- BD Action: Reference Prime Contract W912DY-27-F-A036 when contacting Omega Pipeline Co. LLC Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W912DY (U.S. Army Corps of Engineers' Engineering and Support Center, Huntsville, Alabama)
- Acquisition Method: Competition not stated (Three bids were solicited with two received.)
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Recent Contract Actions from Buying Office W912DY (U.S. Army Corps of Engineers' Engineering and Support Center, Huntsville, Alabama)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-09-25 | W912DY-26-C-A034 | Pond Constructors | $12.6M | Jan 1, 2031 | Pond Constructors wins $12.6M contract for preventive and corrective maintenance on capitalized petroleum facilities. U.S. Army Corps of Eng... |
| 2026-09-23 | W912DY-26-C-A065 | Steele's Garage Door Repair LLC | $10.7M | 2032-03-24 | Non-personal facilities maintenance and services for overhead doors including comprehensive operations, preventive and corrective maintenanc... |
| 2026-09-04 | W912DY-26-F-A355 | Allsteel | $10.4M | May 7, 2027 | Allsteel wins $10.4M contract for administrative office furniture, including panel systems, wood furniture, fixtures and equipment. U.S. Arm... |
| 2026-08-26 | W912DY-26-D-A038 | AECOM Technical Services | $30.7M | Aug 25, 2031 | AECOM Technical Services wins $30.7M contract for maintenance and support of the Remedial Action Cost Engineering and Requirements. U.S. Arm... |
| 2026-08-12 | W912DY-26-F-A067 | M.C Dean | $0 | - | CORRECTION: Correction to an earlier M.C Dean award. |
| 2026-08-10 | W912DY-26-F-A067 | M.C Dean | $92.4M | Aug 4, 2026 | M.C Dean wins $92.4M contract. U.S. Army Corps of Engineers' Engineering and Support Center work through Aug 4, 2026. |
| 2026-08-04 | W912DY-26-D-A035 | C.H. Guernsey & | $48.1M | Jul 31, 2031 | C.H. Guernsey & wins $48.1M contract for Army Utility Program policy assistance, program management support, utility system evaluations. U.S... |
| 2026-06-29 | W912DY-26-C-A031 | Pond Constructors | $16.0M | Jun 29, 2030 | Pond Constructors wins $16.0M contract for preventive and corrective maintenance. U.S. Army Corps of Engineers' Engineering and Support Cent... |
Other Recent Department of War Awards to Omega Pipeline Co. LLC
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-07-31 | SP0600-26-C-8380 | Defense Logistics Agency | $90.7M | Jul 31, 2036 | Omega Pipeline wins $90.7M contract for operation and maintenance of the natural gas utility system at Fort Leonard Wood, Missouri. Defense ... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W912DY-27-F-A036
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) / Official Agency FOIA Portal ↗
Export Contract Dossier & Related Awards
Download this contract record, sibling orders, and buying office awards in CSV, JSON, or Markdown Brief, or query via the AwardTape API & MCP server.
Building an AI agent? Get this award as JSON: GET /api/agent/v1/awards?q=W912DY27FA036. Schema, sample and price or start with free sample calls.