AwardTape · Defense awards · Construction · Architect-engineering services · W912DY20D0013
W912DY20D0013: $0 IDIQ contract to AECOM + Tetra Tech Joint Venture
AECOM + Tetra Tech Joint Venture holds an IDIQ contract from Department of the Army with $0 obligated since Oct 2023, against a ceiling of $249.0M. Latest action Mar 3, 2026.
Ballistic missile defense a-e services
| PIID | W912DY20D0013 |
|---|---|
| Type | IDIQ contract |
| Company | AECOM + Tetra Tech Joint Venture |
| Agency | Department of the Army |
| Contracting office | W2V6 USA ENG SPT CTR HUNTSVIL |
| Category | Construction · Architect-engineering services |
| PSC | C1BF ARCHITECT AND ENGINEERING- CONSTRUCTION: MISSILE SYSTEM FACILITIES |
| NAICS | 541330 ENGINEERING SERVICES |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $249.0M |
| Base date | Oct 17, 2019 |
| Latest action | Mar 3, 2026 |
| End date | n/a |
| Actions since Oct 2023 | 7 |
| Pricing | Set per order |
| Competition | Full and open competition |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| W9128F25FA079 delivery order | AECOM + Tetra Tech Joint Venture | $28.4M | Design-build request for proposal development for utility corridor at francis e. warren afb, wyoming | Army | Architect-engineering services | Mar 3, 2026 DoD 90d |
| W912ER26FA003 delivery order | AECOM + Tetra Tech Joint Venture | $6.2M | Thaad design during construction | Army | Architect-engineering services | Jan 8, 2026 DoD 90d |
| W912DY25FA286 delivery order | AECOM + Tetra Tech Joint Venture | $1.4M | See statement of work (sow) dated 03 september 2025. | Army | Architect-engineering services | May 1, 2026 DoD 90d |
| W912DY25F0035 delivery order | AECOM + Tetra Tech Joint Venture | $1.0M | Tasks 1 thru 8 b1768 as built drawing | Army | Architect-engineering services | Jan 22, 2025 DoD 90d |
| W911KB23F0057 delivery order | AECOM + Tetra Tech Joint Venture | $0 | Clr033 w911kb 23f0057 | Army | Architect-engineering services | Oct 23, 2025 DoD 90d |
| W911KB23F0010 delivery order | AECOM + Tetra Tech Joint Venture | -$208K | Design services ftg 251 | Army | Architect-engineering services | Jun 18, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial